Invitation Letter - Peach Bottom Atomic Power Station - Annual Assessment of Safety Performance
ML050740420
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/14/2005
From: Shanbaky M
Reactor Projects Region 1 Branch 4
To: Adams K, Allard D, Carman K, Crist E, Dyckman D, Epstein E, Gockley R, Haller T, Harkins J, Hiebert D, Hooper B, Jacobson L, Janati R, Jerrica Johnson, Johnsrud J, Kanjorski P, Mason J, Moul G, Jack Parrott, Ruth B, Santorum R, Saylor S, Spector A, Waugh M, Williams J
Delta Borough, PA, EFMR Monitoring Group, Harford County, MD, Lancaster County, PA, Emergency Management Agency, Peach Bottom Alliance, Peach Bottom Township, PA, Board of Supervisors, Sierra Club, STAR (Standing for Truth About Radiation), State of MD, State of MD, House of Delegates, State of MD, Senate, State of PA, Dept of Environmental Protection, State of PA, House of Representatives, State of PA, Senate, The Aegis, The Star, Three Mile Island Alert, US HR (House of Representatives), US SEN (Senate), WGAL (York), York County, PA, Dept of Emergency Services
References
Download: ML050740420 (28)


Text

March 14, 2005 The Honorable James Harkins Harford County Executive 220 South Main Street Bel Air, MD 21014

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Harkins:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable Bob Hooper Maryland State Senate 105 Archer Street Bel Air, MD 21014

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Cooper:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. Ernie L. Crist, Manager Harford County Emergency Operations 2220 Ady Road Forest Hill, MD 21050

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Crist:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable Joanne Parrott Maryland House of Delegates P.O. Box 581 Forest Hill, MD 21050-0581

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Parrott:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Ms. Barbara Ruth Council Administrator Harford County Council 212 South Bond Street Bel Air, MD 21014

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Ruth:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mrs. Laura Jacobson The Peach Bottom Alliance P. O. Box 361 Forest Hill, MD 21050

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mrs. Jacobson:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. & Mrs. Dennis Hiebert 261 Wakely Terrace Bel Air, MD 21014

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. & Mrs Hiebert:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable Mike Waugh Pennsylvania Senate 218 N. George Street York, PA 17403

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Waugh:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable Stanley E. Saylor Pennsylvania House of Representatives Cape Horn Plaza 2997 Cape Horn Road Red Lion, PA 17356

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Saylor:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. Randy Gockley, Coordinator Lancaster County Emergency Preparedness P.O. Box 219 Manheim, PA 17545

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Gockley:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Ms. Kay Carman, Coordinator York County Department of Emergency Services 118 Pleasant Acres Road York, PA 17492

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Carman:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Dr. Johnsrud:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. D. Allard, Director Pennsylvania Bureau of Radiation Protection Department of Environmental Protection Rachael Carson Sate Office Building P. O. Box 8469 Harrisburg, PA 17105-8469

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Allard:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. R. Janati, Chief Division of Nuclear Safety 13th Floor (RCSOB Bldg.)

400 Market Street Harrisburg, PA 17101

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Janati:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable James Mason Mayor of Delta Borough P.O. Box 278 Delta, PA 17314

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Mason:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. Tim Haller, President and Mr. Greg Moul, Vice President Delta Borough Council P. O. Box 278 Delta, PA 17314

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Sirs:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. John Johnson Peach Bottom Township Board of Supervisors 545 Broad Street Delta, PA 17314

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Johnson:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. Dennis Dyckman PA Bureau of Radiation Protection P. O. Box 8469 Harrisburg, PA 17105-8469

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Dyckman:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Ms. Jenna Williams President Delta Borough Council 515 Chestnut Street Delta, PA 17314

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Williams:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 Mr. Kip and Karen Adams The Peach Bottom Alliance 43 River Road Airville, PA 17302

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. & Mrs Adams:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 TMI-Alert 315 Peffer Street Harrisburg, PA 17102

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Sir/Madame:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 EFMR Monitoring Group (Eric Epstien) 4100 Hillsdale Road Harrisburg, PA 17112

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Sir/Madame:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Aegis 10 Hays Street Bel Air, MD 21014

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Sir/Madame:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 WGAL (York) 18 S. George Street York, PA 17404

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Sir/Madame:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Star 811 Main Street Delta, PA 17314

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Sir/Madame:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable Arlen Spector United States Senate 711 Hart Senate Office Building Washington, DC 20510-3802

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Spector:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable Paul Kanjorski House of Representatives 2188 Rayburn House Office Building Washington, DC 20515-3811

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Congressman Kanjorski:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated

March 14, 2005 The Honorable Rick Santorum United States Senate 511 Dirksen Senate Office Building Washington, DC 20510

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Santorum:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company in which the NRC staff will discuss with Exelon our annual assessment of the safety performance of the Peach Bottom Atomic Power Station.

The meeting will be held at 7:00 p.m. on Tuesday, March 29, 2005, at the Peach Bottom Inn, 6085 Delta Road in Delta, Pennsylvania. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Exelon our assessment of their safety performance at Peach Bottom and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Peach Bottom and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Peach Bottom Atomic Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to the Exelon Generation Company on March 2, 2005. A copy of that letter is enclosed. The NRCs meeting notice with meeting agenda, can be found in ADAMS with Accession Number ML050680522 and the assessment letter with Accession Number: ML050610708.

ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Peach Bottom Atomic Power Station through the NRC Web site. This information may be accessed at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As Stated