ML050620388
| ML050620388 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/02/2005 |
| From: | Caldwell J NRC/RGN-III |
| To: | Nazar M Indiana Michigan Power Co |
| References | |
| IR-05-001 | |
| Download: ML050620388 (7) | |
Text
March 2, 2005 Mr. Mano Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
ANNUAL ASSESSMENT LETTER - D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/200501; 05000316/200501)
Dear Mr. Nazar:
On February 8, 2005, the NRC staff completed its end-of-cycle plant performance assessment of D.C. Cook Nuclear Power Plant. The end-of-cycle review for D.C. Cook involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility, so that you will have an opportunity to prepare for these inspections, and to inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Overall, your D.C. Cook Nuclear Power Plant was operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for Unit 1 for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix based on one White inspection finding, shared by both units, in the Radiation Safety cornerstone. Plant performance for Unit 2 for the most recent quarter was within the Regulatory Response column of the Action Matrix based on the one White inspection finding in the Radiation Safety cornerstone and one White performance indicator for Scrams With Loss of Normal Heat Removal in the Initiating Events cornerstone.
Plant performance for Unit 1 entered the Regulatory Response column of the Action Matrix based on one White inspection finding in the Radiation Safety cornerstone during the first quarter of 2004, which affected both units. A supplemental inspection to review the circumstances surrounding the White finding was conducted in accordance with Inspection Procedure (IP) 95001, "Inspection For One Or Two White Inputs In A Strategic Performance Area." The inspection determined that your staff conducted an adequate root cause evaluation and, as a result, no additional supplemental inspections are planned.
M. Nazar Plant performance for Unit 2 during the first quarter of 2004 was within the Degraded Cornerstone column of the Action Matrix, based on two White performance indicators for Unplanned Scrams Per 7000 Critical Hours and Scrams With Loss of Normal Heat Removal in the Initiating Events cornerstone. A White inspection finding in the Radiation Safety cornerstone was also identified in the first quarter of 2004, which affected both units. Plant performance for Unit 2 entered the Regulatory Response column of the Action Matrix in the second quarter of 2004 when the Unplanned Scrams Per 7000 Critical Hours performance indicator changed to Green. Supplemental Inspection Procedure IP 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, was conducted to review the White performance indicators in the Unplanned Scrams Per 7000 Critical Hours and Scrams With Loss of Normal Heat Removal areas. The inspection determined that your staff conducted an adequate root cause evaluation and, as a result, no additional supplemental inspections are planned.
Additionally, on September 29, 2004, the staff issued a Severity Level III Notice of Violation in accordance with the NRCs Enforcement Policy. The Severity Level III violation of 10 CFR 50.9 was identified during the biennial licensed operator re-qualification program inspection using Inspection Procedure 71111.11B (IR 315/316-2004-07). Follow-up on this issue will be reviewed during routine baseline problem identification and resolution inspections.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Nazar If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan, Chief, Reactor Projects Branch 6 at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
James L. Caldwell Regional Administrator Docket Nos.: 50-315; 50-316 License Nos.: DPR-58; DPR-74
Enclosure:
D.C. Cook Inspection/Activity Plan cc w/encl:
J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists
M. Nazar If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan, Chief, Reactor Projects Branch 6 at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
James L. Caldwell Regional Administrator Docket Nos.: 50-315; 50-316 License Nos.: DPR-58; DPR-74
Enclosure:
D.C. Cook Inspection/Activity Plan cc w/encl:
J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\eoc 030205\\DC Cook.wpd To receive a copy of this document, indicate in the box "C" = Copy w ithout attachment/enclosure "E" = Copy w ith attachment/enclosure "N "
= No copy OFFICE RIII RIII RIII RIII RIII NAME RRuiz:co RLerch MSatorius for SReynolds MSatorius JCaldwell DATE 02/18/05 02/23/05 03/02/05 03/02/05 03/02/05 OFFICIAL RECORD COPY
M. Nazar ADAMS Distribution:
WDR JGL1 RidsNrrDipmIipb GEG KGO BJK1 CAA1 DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Institute of Nuclear Power Operations (INPO)
D.C. Cook Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2005 08:15:37 Report 22 2
- UNIT 1 ISI/TI-150 INSPECTION Safety Issues 03/28/2005 04/15/2005 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02 IP 2515/150 1
Safety Issues 03/28/2005 04/15/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
Baseline Inspections 03/28/2005 04/15/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 71121.02
- OUTAGE ALARA Baseline Inspections 04/04/2005 04/08/2005 ALARA Planning and Controls IP 7112102 1, 2 1
- REMP & RAD MTL CONTROL Baseline Inspections 07/11/2005 07/15/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 07/11/2005 07/15/2005 Performance Indicator Verification IP 71151 1, 2 5
SSDPC
- SAFETY SYSTEM DESIGN & PERFORMANCE Baseline Inspections 09/05/2005 09/23/2005 Safety System Design and Performance Capability IP 7111121 1, 2 1
HEATSKB
- BIENNIAL HEAT SINK INSPECTION Baseline Inspections 10/03/2005 10/07/2005 Heat Sink Performance IP 7111107B 1, 2 2
71114
- EP EXERCISE & EP PI INSP Baseline Inspections 09/19/2005 09/23/2005 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 09/19/2005 09/23/2005 Performance Indicator Verification IP 71151 1, 2 1
- RADIOLOGICAL ACCESS CONTROL Baseline Inspections 10/03/2005 10/07/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Performance Indicator Verification IP 71151 1, 2 3
FY 2006
- D. C. COOK INIT PREP 01/2006 Not Applicable 01/09/2006 01/13/2006 OL - INITIAL EXAM - D.C. COOK - JAN/FEB 2006 W90130 1
3 FIREPROT
- FIRE PROTECTION INSPECTION TRIENNIAL Baseline Inspections 01/23/2006 02/10/2006 Fire Protection IP 7111105T 1, 2 1
7112103
- RADIOLOGICAL INSTRUMENTATION Baseline Inspections 01/30/2006 02/03/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 01/30/2006 02/03/2006 Performance Indicator Verification IP 71151 1, 2 3
FY 2006
- D. C. COOK INIT EXAM 02/2006 Not Applicable 02/06/2006 02/17/2006 OL - INITIAL EXAM - D.C. COOK - JAN/FEB 2006 W90130 1
2 ISI
- D.C. COOK UNIT 2 ISI INSPECTION Baseline Inspections 03/27/2006 04/21/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 IP 71114
- EP NON-EXERCISE BASELINE Baseline Inspections 04/17/2006 04/21/2006 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
D.C. Cook Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2005 08:15:37 Report 22 1
7112202
- TRANSPORTATION AND RADWASTE PROCESSING Baseline Inspections 05/01/2006 05/05/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 2
MOD/5059
- MODIFICATION/50.59 INSPECTION Baseline Inspections 06/12/2006 06/30/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/12/2006 06/30/2006 Permanent Plant Modifications IP 7111117B 1, 2 Baseline Inspections 06/12/2006 06/30/2006 Temporary Plant Modifications IP 7111123 1, 2 1
MAINT
- MAINTENANCE EFFECTIVENESS Baseline Inspections 08/07/2006 08/11/2006 Maintenance Effectiveness IP 7111112B 1, 2 1
7112101
- RADIOLOGICAL ACCESS CONTROL Baseline Inspections 08/07/2006 08/11/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 08/07/2006 08/11/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.