Inspection / Activity Plan - 03/01/2005 - 09/30/2006
ML050610767
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/02/2005
From:
Region 1 Administrator
To:
Duke Energy Corp
Shared Package
ML050610767 List:
References
IR-05-001
Download: ML050610767 (3)


Text

Page 1 of 3 Oconee 03/03/2005 09:51:14 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL RQ - REQUAL INSPECTION 3 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/28/2005 04/01/2005 Baseline Inspections MTN-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 04/18/2005 04/22/2005 Baseline Inspections MTNSGISI - STEAM GENERATOR ISI 2 1 IP 7111108P Inservice Inspection Activities - PWR 04/18/2005 04/22/2005 Baseline Inspections MTNTI160 - 2515/160 U-1: PZR PENETRATION NOZZLES 1 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 04/18/2005 04/22/2005 Safety Issues 95002 - SUPPLEMENTAL INSPECTION INFO TRIP 3 1, 2, 3 IP 95002 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 05/02/2005 05/06/2005 Supplemental Program EB2-TFP - TFP PRE-INSPECTION VISIT 3 1, 2, 3 IP 7111105T Fire Protection 05/16/2005 05/20/2005 Baseline Inspections PS EP - EP INSPECTION 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 05/16/2005 05/20/2005 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 05/16/2005 05/20/2005 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/16/2005 05/20/2005 Baseline Inspections 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/16/2005 05/20/2005 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 05/16/2005 05/20/2005 Baseline Inspections 95002 - SUPPLEMENTAL INSPECTION 3 1, 2, 3 IP 95002 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 05/23/2005 05/27/2005 Supplemental Program OL PREP - INITIAL EXAM PREP 2 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/06/2005 06/10/2005 Not Applicable EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 3 1, 2, 3 IP 7111105T Fire Protection 06/06/2005 06/10/2005 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection 06/20/2005 06/24/2005 Baseline Inspections PI&R - PI&R INSPECTION 4 1, 2, 3 IP 71152B Identification and Resolution of Problems 06/13/2005 06/17/2005 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 06/27/2005 07/01/2005 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/20/2005 07/01/2005 Not Applicable PB1ISFSI - ISFSI OPERATIONS INSPECTION 1 1, 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/11/2005 07/15/2005 Other Routine PS-RP - RP OCCUPATIONAL BASELINE WK-1 2 1, 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 10/23/2005 10/27/2005 Other Routine 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 10/23/2005 10/27/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 3 Oconee 03/03/2005 09:51:14 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RP OCCUPATIONAL BASELINE WK-1 2 1, 2, 3 IP 7112102 ALARA Planning and Controls 10/23/2005 10/27/2005 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 10/23/2005 10/27/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2005 10/27/2005 Baseline Inspections MTN-ISI - U2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 10/31/2005 11/04/2005 Baseline Inspections MTNTI160 - 2515/160 U-2: PZR PENETRATION NOZZLES 1 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 10/31/2005 11/04/2005 Safety Issues MTNSGISI - STEAM GENERATOR ISI 2 2 IP 7111108P Inservice Inspection Activities - PWR 11/07/2005 11/11/2005 Baseline Inspections PS-RP - RP OCCUPATIONAL BASELINE WK-2 3 1, 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 11/07/2005 11/11/2005 Other Routine 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 11/07/2005 11/11/2005 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 11/07/2005 11/11/2005 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 11/07/2005 11/11/2005 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 11/07/2005 11/11/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 1 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 02/13/2006 02/17/2006 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 6 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 03/06/2006 03/10/2006 Baseline Inspections 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 03/20/2006 03/24/2006 Baseline Inspections MTN-ISI - U3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/12/2006 Baseline Inspections MTNSGISI - U3 STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 05/15/2006 05/19/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 05/22/2006 05/26/2006 Not Applicable PS1-RP - RP BASELINE PUBLIC 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 06/19/2006 06/23/2006 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23216 OCONEE/EXAMS AT POWER FACILITIES 06/19/2006 06/30/2006 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Oconee 03/03/2005 09:51:14 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EP EXERCISE 3 1, 2, 3 IP 7111401 Exercise Evaluation 07/17/2006 07/21/2006 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/17/2006 07/21/2006 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 07/17/2006 07/21/2006 Baseline Inspections MTN-HS - HEAT SINK 1 1, 2, 3 IP 7111107B Heat Sink Performance 07/24/2006 07/28/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.