ML050610764
| ML050610764 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/03/2005 |
| From: | Region 2 Administrator |
| To: | Duke Energy Corp |
| Shared Package | |
| ML050610762 | List: |
| References | |
| IR-05-001 | |
| Download: ML050610764 (3) | |
Text
Oconee Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/03/2005 09:51:14 Report 22 3
- REQUAL INSPECTION Baseline Inspections 03/28/2005 04/01/2005 Licensed Operator Requalification Program IP 7111111B 1, 2, 3 2
MTN-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 04/18/2005 04/22/2005 Inservice Inspection Activities - PWR IP 7111108P 1
2 MTNSGISI
- STEAM GENERATOR ISI Baseline Inspections 04/18/2005 04/22/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 MTNTI160
- 2515/160 U-1: PZR PENETRATION NOZZLES Safety Issues 04/18/2005 04/22/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
3 95002
- SUPPLEMENTAL INSPECTION INFO TRIP Supplemental Program 05/02/2005 05/06/2005 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform IP 95002 1, 2, 3 3
EB2-TFP
- TFP PRE-INSPECTION VISIT Baseline Inspections 05/16/2005 05/20/2005 Fire Protection IP 7111105T 1, 2, 3 1
PS EP
- EP INSPECTION Baseline Inspections 05/16/2005 05/20/2005 Alert and Notification System Testing IP 7111402 1, 2, 3 Baseline Inspections 05/16/2005 05/20/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2, 3 Baseline Inspections 05/16/2005 05/20/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 05/16/2005 05/20/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2, 3 Baseline Inspections 05/16/2005 05/20/2005 Performance Indicator Verification IP 71151 1, 2, 3 3
95002
- SUPPLEMENTAL INSPECTION Supplemental Program 05/23/2005 05/27/2005 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform IP 95002 1, 2, 3 2
OL PREP
- INITIAL EXAM PREP Not Applicable 06/06/2005 06/10/2005 OCONEE/EXAMS AT POWER FACILITIES V23216 1
3 EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/06/2005 06/10/2005 Fire Protection IP 7111105T 1, 2, 3 Baseline Inspections 06/20/2005 06/24/2005 Fire Protection IP 7111105T 1, 2, 3 4
- PI&R INSPECTION Baseline Inspections 06/13/2005 06/17/2005 Identification and Resolution of Problems IP 71152B 1, 2, 3 Baseline Inspections 06/27/2005 07/01/2005 Identification and Resolution of Problems IP 71152B 1, 2, 3 3
OL EXAM
- INITIAL EXAM Not Applicable 06/20/2005 07/01/2005 OCONEE/EXAMS AT POWER FACILITIES V23216 1
1 PB1ISFSI
- ISFSI OPERATIONS INSPECTION Other Routine 07/11/2005 07/15/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2, 3 2
PS-RP
- RP OCCUPATIONAL BASELINE WK-1 Other Routine 10/23/2005 10/27/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2, 3 Baseline Inspections 10/23/2005 10/27/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Oconee Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/03/2005 09:51:14 Report 22 2
PS-RP
- RP OCCUPATIONAL BASELINE WK-1 Baseline Inspections 10/23/2005 10/27/2005 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 10/23/2005 10/27/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 10/23/2005 10/27/2005 Performance Indicator Verification IP 71151 1, 2 2
MTN-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 10/31/2005 11/04/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 MTNTI160
- 2515/160 U-2: PZR PENETRATION NOZZLES Safety Issues 10/31/2005 11/04/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
2 MTNSGISI
- STEAM GENERATOR ISI Baseline Inspections 11/07/2005 11/11/2005 Inservice Inspection Activities - PWR IP 7111108P 2
3 PS-RP
- RP OCCUPATIONAL BASELINE WK-2 Other Routine 11/07/2005 11/11/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2, 3 Baseline Inspections 11/07/2005 11/11/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 11/07/2005 11/11/2005 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 11/07/2005 11/11/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 11/07/2005 11/11/2005 Performance Indicator Verification IP 71151 1, 2, 3 1
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 02/13/2006 02/17/2006 Safety System Design and Performance Capability IP 7111121 1, 2, 3 6
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 03/06/2006 03/10/2006 Safety System Design and Performance Capability IP 7111121 1, 2, 3 Baseline Inspections 03/20/2006 03/24/2006 Safety System Design and Performance Capability IP 7111121 1, 2, 3 1
MTN-ISI
- U3 INSERVICE INSPECTION Baseline Inspections 05/08/2006 05/12/2006 Inservice Inspection Activities - PWR IP 7111108P 3
1 MTNSGISI
- U3 STEAM GENERATOR ISI Baseline Inspections 05/15/2006 05/19/2006 Inservice Inspection Activities - PWR IP 7111108P 3
3 OL PREP
- INITIAL EXAM PREP Not Applicable 05/22/2006 05/26/2006 OCONEE/EXAMS AT POWER FACILITIES V23216 1
3 PS1-RP
- RP BASELINE PUBLIC Baseline Inspections 06/19/2006 06/23/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 06/19/2006 06/23/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2, 3 Baseline Inspections 06/19/2006 06/23/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2, 3 Baseline Inspections 06/19/2006 06/23/2006 Performance Indicator Verification IP 71151 1, 2, 3 3
OL EXAM
- INITIAL EXAM Not Applicable 06/19/2006 06/30/2006 OCONEE/EXAMS AT POWER FACILITIES V23216 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Oconee Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/03/2005 09:51:14 Report 22 3
PS2-EP
- EP EXERCISE Baseline Inspections 07/17/2006 07/21/2006 Exercise Evaluation IP 7111401 1, 2, 3 Baseline Inspections 07/17/2006 07/21/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 07/17/2006 07/21/2006 Performance Indicator Verification IP 71151 1, 2, 3 1
MTN-HS
- HEAT SINK Baseline Inspections 07/24/2006 07/28/2006 Heat Sink Performance IP 7111107B 1, 2, 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.