Public Meeting Summary - Davis-Besse 0350 Meeting Held February 22, 2005
ML050610270
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/01/2005
From: Christine Lipa
Division of Reactor Safety III
To:
FirstEnergy Nuclear Operating Co
References
Download: ML050610270 (4)


Text

March 1, 2005 LICENSEE: FirstEnergy Nuclear Operating Company FACILITIES: Davis-Besse Nuclear Plant, Unit 1

SUBJECT:

SUMMARY

OF THE FEBRUARY 22, 2005 PUBLIC MEETING TO DISCUSS LICENSEE PERFORMANCE AND PLANNED ACTIVITIES AS PART OF THE MANUAL CHAPTER 0350 PROCESS AT THE DAVIS-BESSE NUCLEAR POWER STATION On February 22, 2005, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Administration Building in Oak Harbor, Ohio. The meeting was between the NRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company (FENOC) to discuss licensee performance and planned activities as part of the Manual Chapter 0350 process at the Davis-Besse Nuclear Power Station. The letter of notification, meeting notice, NRC presentation, and licensee presentation can be found in ADAMS as ML050400099, ML050400084, ML050540265, and ML050550474, respectively. The transcript of the meeting will be made publicly available in ADAMS and on the NRCs Davis-Besse web page when it is available. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an assessment of recent performance at the Davis-Besse Nuclear Power Plant. The NRC discussed recent activities at Davis-Besse which included Mid-Cycle Outage Inspections and Activities, Problem Identification and Resolution Inspection, and Review of the Operations, Corrective Actions, and Engineering Independent Assessment Results. At the conclusion of the NRC remarks, FENOC presented an overview of significant items being worked on at Davis-Besse. FENOC discussed the accomplishments during the Steam Generator Inspection Mid-Cycle Outage, results of the Engineering Programs and Safety Culture/Safety Conscious Work Environment Independent Assessments and the 4th Quarter 2004 Nuclear Quality Assessment Report. The NRC concluded the meeting by discussing that the plant is operating safely and that additional oversight and inspection will continue according to the IMC 0350 process at Davis-Besse.

These documents and many others related to the IMC 0350 Process at Davis-Besse and the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As Stated See Attached Distribution

DOCUMENT NAME: G:\Davis-Besse 0350\External Meetings\Public Meeting Summary\Published Summaries\ML050610270.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MSalter- CLipa Williams:dtp DATE 3/01/05 3/01/05 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: The Honorable Dennis Kucinich G. Leidich, President - FENOC L. Myers, Chief Operating Officer J. Hagan, Senior Vice President Engineering and Services, FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, Attorney, FirstEnergy Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners of Lucas County J. Papcun, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Jacqueline Bird INPO

FirstEnergy Nuclear Operating Company ADAMS Distribution:

GYS DFT DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure Meeting Participants NRC S. Reynolds, Davis-Besse Oversight Panel Manager, RIII J. Hopkins, Project Manager, NRR C. Lipa, Branch Chief, DRP, RIII J. Rutkowski, Resident Inspector, Davis-Besse M. Salter-Williams, Resident Inspector, Davis-Besse FirstEnergy Nuclear Operating Company M. Bezilla, Vice President, Davis-Besse B. Allen, Director, Site Operations, Davis-Besse S. Loehlein, Director, Engineering, Davis-Besse R. Hruby, Manager, Nuclear Oversight, Davis-Besse K. Ostrowski, Manager, Plant Operations, Davis-Besse