MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241221, Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant2024-09-25025 September 2024 Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML24225A2672024-08-13013 August 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Davis-Besse Plant for Performance for 2023 Calendar Year ML23111A2692023-04-24024 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Davis-Besse Nuclear Plant for Performance for 2022 Calendar Year ML22159A3352022-06-0909 June 2022 Notice of Significant Public Meeting to Discuss End-of-Cycle Performance Assessment of Davis-Besse Nuclear Power Station for 2021 Calendar Year ML22031A2302022-01-31031 January 2022 Public Meeting Notice Amendment for Field Flash Selector Switch Preventative Maintenance Regulatory Conference ML22020A4062022-01-21021 January 2022 Public Meeting Notice for Field Flash Selector Switch Preventative Maintenance Regulatory Conference ML22021B6442022-01-21021 January 2022 Notice of Regulatory Conference ML21326A2582021-11-23023 November 2021 Public Meeting Notice (Closed) for Cyber Security Inspection Regulatory Conference PMNS20211401, Meeting with Energy Harbor Nuclear Corp. (Ehnc) Regarding a Proposed Alternative to Certain Steam Generator Inspection Requirements at Davis-Besse Nuclear Power Station, Unit No. 12021-10-27027 October 2021 Meeting with Energy Harbor Nuclear Corp. (Ehnc) Regarding a Proposed Alternative to Certain Steam Generator Inspection Requirements at Davis-Besse Nuclear Power Station, Unit No. 1 ML21158A1752021-06-0404 June 2021 6/22/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Davis Besse Nuclear Power Station and Perry Nuclear Power Plant for Performance for 2020 Calendar Year ML20192A0072020-07-0909 July 2020 7/23/2020 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Davis-Besse Nuclear Power Station and Perry Nuclear Power Plant Performance for the 2019 Calendar Year ML19177A0582019-06-25025 June 2019 7/18/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Davis-Besse Nuclear Power Station Performance for the 2018 Calendar Year ML18157A1332018-06-0606 June 2018 6/26/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-Of-Cycle Assessment of the Davis Besse Nuclear Power Station Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17174B1962017-06-23023 June 2017 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Davis-Besse Nuclear Power Station Performance of the 2016 Calendar Year ML17069A1372017-03-10010 March 2017 Notice of Forthcoming Closed Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Security Plan Changes at Davis-Besse Nuclear Power Station Unit 1 ML16193A2462016-07-0707 July 2016 Alternative Dispute Resolution Meeting Notice (Jls) ML16152A8372016-05-31031 May 2016 6/21/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Davis-Besse Nuclear Power Station Performance for the 2015 Calendar Year ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15141A3632015-05-21021 May 2015 Notice of Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2014 End-Of-Cycle Performance Assessment of Davis-Besse Nuclear Power Station ML15141A3802015-05-21021 May 2015 Notice of Meeting with Public to NRC Activities, Nuclear Power Issues, Davis-Besse Station Performance for the 2014 Calendar Year as Well as Activities Related to the NRC Review of Shield Building Issues ML14177A6882014-06-26026 June 2014 Notice of Meeting to Discuss NRC Activities, Nuclear Power Issues and Davis-Besse, for the 2013 Calendar Year with Public ML14177A6732014-06-26026 June 2014 Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2013 End-Of-Cycle Performance Assessment of Davis-Besse Nuclear Power Station ML14169A4772014-06-13013 June 2014 Operator License Workshop Invitation ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14077A1052014-03-18018 March 2014 March 25, 2014, Notice of Category 3 Forthcoming Meetings to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Davis-Besse, Unit 1 ML14066A0442014-02-20020 February 2014 2014-02-20 Davis-Besse Steam Generator Public Meeting Audio ML14030A5532014-01-30030 January 2014 2/20/2014 - Notice of Public Webinar Meeting with Firstenergy Nuclear Operating Company to Discuss NRC Activities to Inspect Davis-Besse's Installation of Two New Steam Generators ML13280A9062013-10-21021 October 2013 Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Voluntary Risk Informed Fire Protection Amendment for Davis-Besse ML13252A1712013-09-0909 September 2013 9/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse) ML13151A2512013-05-31031 May 2013 Notice of Significant Licensee Meeting ML13144A7902013-05-24024 May 2013 Notice of Meeting with Firstenergy Nuclear Generation, LLC to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Davis-Besse Nuclear Power Station ML13123A3672013-05-0202 May 2013 Ltr 5/2/13 Davis-Besse Operator Licensing Workshop ML13056A2262013-02-22022 February 2013 2/20/2013 - Notice of Significant Licensee Public Meeting with First Energy Nuclear Operating Company to Discuss Davis Besse Nuclear Power Station Planned Steam Generator Replacement Activities ML12256A7922012-09-12012 September 2012 Notice of All-FENOC Public Meeting to Discuss Fleet Wide Performance ML12237A1572012-08-28028 August 2012 Federal Register Notice Regarding the ACRS Plant License Renewal (Davis Besse)Subcommittee Meeting, September 19, 2012 ML12194A7262012-07-12012 July 2012 8/9/2012 Notice of Meeting with Firstenergy Nuclear Operating Company Regarding the Davis-Besse Nuclear Power Station ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1135601642011-12-22022 December 2011 Meeting Notice with Davis-Besse to Discuss Present the Results of Its Evaluation of Shield Building Cracking and for the NRC to Present the Results of Its Independent Assessment of That Evaluation ML1133604162011-12-0202 December 2011 Notice of Public Meeting with First Energy Nuclear Operating Company to Discuss Their Technical Analysis Regarding Cracking Identified in the Davis-Besse Shield Building ML1115401312011-06-0202 June 2011 Notice of Significant Licensee Meeting, Beaver Valley, Perry, & Davis-Besse Nuclear Generating Stations to Discuss Firstenergy Nuclear Operating Company Fleet Wide Performance with FENOC Management ML1114504162011-05-24024 May 2011 Notice of Meeting with Davis-Besse Meeting Notice to Discuss the NRC End of Cycle Assessment of Davis-Besse Unit 1 Performance for the 2010 Calendar Year 2024-09-25
[Table view] |
Text
February 9, 2005 Mr. Mark B. Bezilla Vice President-Nuclear, Davis-Besse FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
Dear Mr. Bezilla:
This letter confirms the discussion between members of our staffs to discuss plant performance and planned activities for the Davis-Besse Nuclear Power Station, as part of the implementation of NRCs Inspection Manual Chapter (IMC) 0350 Oversight of Operating Reactor Facilities in a Shutdown Condition with Performance Problems. The meeting will be held Tuesday, February 22, 2005, from 2:00 p.m. to 5:00 p.m. (EST) at the Davis-Besse Administration Building. The meeting is open to the public.
We will gladly discuss any questions you may have concerning this matter.
Sincerely,
/RA/
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 See Attached Distribution
DOCUMENT NAME: G:\Davis-Besse 0350/External Meetings\DB Public Meeting Notices\published notices and letters\publicmtgnotice022205 ltr.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MPhillips CLipa DATE 01/26/05 02/09/05 OFFICIAL RECORD COPY
M. Bezilla cc: The Honorable Dennis Kucinich G. Leidich, President - FENOC L. Myers, Chief Operating Officer J. Hagan, Senior Vice President Engineering and Services, FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, Attorney, FirstEnergy Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners of Lucas County J. Papcun, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.
C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Jacqueline Bird INPO
M. Bezilla ADAMS Distribution:
GYS DFT DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 DB0350