Letter from Jonathan M. Block to Parties' Counsel Enclosing New England Coalition'S (Special) First Supplemental Disclosures Pursuant to 10 CFR 2.336...and a Copy to the Licensing Board Indicating New England Coalition'S Compliance
ML050470186
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/04/2005
From: Block J
New England Coalition
To: Higgins M, Hofmann S, Poole B, Roisman A, Silberg J, Travieso-Diaz M, Robert Weisman
NRC/OGC, ShawPittman, LLP, State of VT, Dept of Public Service
Byrdsong A T
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 9348
Download: ML050470186 (69)


Text

1AS 3L3qI t.PJM ORREOSPO JONATHAN M. BLOCK ATTORNEY AT LAW 94 Main Street P.O. Box 566 Putney, VT. 05346-0566 802-387-2646 (vox)

-2667 (fax) jonb(@asover.net February 4,2005 DOCKETED Jay E. Silberg, Esq., Matias Travieso-Diaz, Esq. USNRC Shaw Pittman, LLP 2300 N St., NW February 7, 2005 (8:00am)

Washington, DC 20037-1128 OFFICE OF SECRETARY RULEMAKINGS AND Brooke Poole, Esq., Robert Weisman, Esq. ADJUDICATIONS STAFF Marisa Higgins, Esq.

Office of the General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sarah Hofmann, Special Counsel Anthony Z. Roisman, Special Counsel c/o Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 Re: Docket No. 50-271-OLA/ASLBP No. 04-832-02-OLA To Parties' CounseL Enclosed please find New England Coalition's (Special ) First Supplemental disclosures pursuant to 10 CFR §2.336, a Certificate of Disclosure, a Certificate of Service, and a copy of a letter to the Board indicating our compliance.

New England Coalition has provided a list of all documents produced to Entergy (and provided as a courtesy to other parties) electronically with this filing, and a privilege log of a documents withheld from Entergy on a claim of privilege.

Sincerely, Jonatan M. Block Counsel for New England Coalition cc Service List Je(719pI/c=te = cy- 03O So6 C y- o

JONATHAN M. BLOCK LAW ATTORNEY AT LAW 94 Main Street P.O. Box 566 Putney, VT. 05346-0566 802-387-2646 (vox)

-2667 (fax) jonb( )sover.net February 4, 2005 Administrative Judge Alex S. Carlin, Chair AdministrativeJudge Lester S. Rubenstein DOCKETED Atomic Safety and Licensing Board Panel USNRC Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission 4270 E. Country Villa Drive Febr uary 7, 2005 (8:00am)

Washington, DC 20555-0001 Tuscon, AZ 85718 OFF:ICE OF SECRETARY RIJILEMAKINGS AND AdministrativeJudge AnthonyJ. Baratta AD, JUDICATIONS STAFF Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re: Docket No. 50-271-OLA/ASLB No. 04-832-02-OLA

Dear Administrative Judges:

This letter is to confirm to the Atomic Safety and Licensing Board Panel for this proceeding, that New England Coalition complied on this day with 10 CFR § 2.336 regarding the special discovery request Entergy made for documents containing the communications between New England Coalition's pro se representative and New England Coalition's consultants prior to New England Coalition obtaining counsel in this proceeding. Attached hereto please find attached a copy of New England Coalition's Certificate of Disciosure, transmittal letter to the parties, privileged log, and list of diselosures. You have been provided with electronic copies of the documents at issue with the initial filing. Please let us know if any of you require paper copies of those documents and we will provide them to you.

New England Coalition made its disclosures to all parties, whether the party requested the document at issue or not.

Respectfully submitted,

/Jounslto Nw Block Counsel to New England Coalition cc Service List

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION DOCKETED ATOMIC SAFETY AND LICENSING BOARD USNRC February 7, 2005 (8:00am)

Before Administrative judges: OFFICE OF SECRETARY Alex S. Karlin, Chairman RULEMAKINGS AND Dr. AnthonyJ. Baratta ADJUDICATIONS STAFF Lester S. Rubenstein In the Matter of Docket No. 50-271-OLA Entergy Nuclear Vermont Yankee, LLC.,

and ASLBP No. 04-832-02-OLA Entergy Nuclear Operations, Inc.

(Vermont Yankee Nuclear Power Station) February 4, 2004 NEW ENGLAND COALITION'S (SPECIAL) FIRST SUPPLEMENTAL DISCOVERY DISCLOSURE TO ACCOMMODATE ENTERGY'S REQUEST FOR E-MAIL COMMUNICATIONS BETWEEN NEW ENGLAND COALTION AND ITS REPRESENTATIVES AND AGENTS IN THIS CASE PRIOR TO NEW ENGLAND COALTION RETAINING COUNSEL The United States Nuclear Regulatory Commission has long recognized the "work product" privilege as a protection against a party obtaining through discovery "documents and other tangible things other wise discoverable" where such items were "prepared in anticipation of or for the hearing by or for another party's representative (including his attorney, consultant, surety, indemnitor, insurer, or agent)." GeorgiaPower Company (Vogde Electric Generating Plant, Units 1 and 2), LBP-93-18, Docket Nos. 50-424-OLA-3, 50-425-OLA-3 (ASLBP No. 93-671-01-OLA-3),38 NRC 121, 123 (September 8,1993), citing 10 CFR §2.740(b)(2) (emphasis added). In the instant case, Entergy asked New England Coalition to provide copies of e-mail communications between the Coalition's agent/representative and its consultants. New England Coalition contends that such communications are protected work product of its "representative" or "agent" or "consultant". The fact that New England Coalition was appearingpmn se before the Atomic Safety and Licensing Board, through the Coalition's member, agent/representative Mr. Raymond Shadis, does not vitiate the

New En,gland Coalition'r SpecialSupple mentay Discovey Disclossure to Entergy (February 4, 2004) Page 2 of 4 existence and availability of the work product privilege to the Coalition through its agent/representative and consultant insofar as they were preparing New England Coalition to obtain and go forward in a hearing on its contentions.

Moreover, construing the rules as to provide protection only for persons (or entities) with counsel would be (1) fundamentally unfair and prejudicial to the interests of hearing participants who could not afford to obtain counsel or could not find competent counsel willing to provide representation; (2) a denial of due process, as the NRC's regulations permit pro se representation without warning that entering a proceeding pro He will subject a participant to required disclosure of otherwise confidential information that will only be protected if counsel is obtained; (3) a denial of due process and equal protection of the laws, as it would provided privileges to the NRC Staff, licensees, applicants, and any other persons with counsel while demanding that the pro se participant meet the same standards of conduct as the NRC rules require of both pro se and attorneys at hearing, including subjecting them to sanctions for failure to meet such requirements. See, e.g., 10 CFR § § 2.314. Persons held to the same standards at hearing should also be accorded equal protection of the laws or regulations governing the hearing. United States Constitution, Amendment V.

New England Coalition contends that the material Entergy has requested is work product of New England Coalition's agent/representative and consultants. "Fact" work product may be discoverable where a party makes a showing of "substantial need and inability without undue hardship to obtain the substantial equivalent of the materials by other means." Houston Lighting and Power Co., (South Texas Project, Units 1 and 2), CLI-87-8, Docket Nos. 50-498-OL; 50-499-OL, 26 NRC 6, 10 July 15, 1987) (citing Fed.R.Civ.P. 26(b)(3) and Hickman P. Tajlor, 329 U.S. 495, 510-12 (1947); In re Murphy, 560 F.2d 326, 334 (8th Cir.1977)). Where the sought after work product may Newv En~glandCoalitionas SpecialSupplementay Dicoveg Disclosure to Enter;(February 4, 2004) Page 3 of 4 be considered "opinion work product", i.e., work product containing "mental impressions, conclusions, opinions, or legal theories", it may only "be discoverable upon extraordinary justification." Id. (citing Hickman, 329 U.S. at 513 and Murphy, 560 F.2d at 336). Without waiving the privilege for materials blacked out in this disclosure and listed in the privileged log attached hereto or to assertion of the privilege over other similar documents in the future, New England Coalition has provided in this disclosure what it deems relevant material located in exchanges between its agent/representative and consultants concerning matters germane to New England Coalition's admitted contentions. Because partial disclosure of a document may be deemed a waiver of privilege, New England Coalition has only disclosed those specific documents over which it does not assert work product privilege as to any portion of the document. See. e.g., Kerr-McGee Chemical Corporation (West Chicago Rare Earths Facility) and Kerr-McGee Chemical Corporation (Kress Creek Decontamination) LBP-85-38 Docket Nos. 40-2061-ML (ASLBP No. 83-495-01-ML), 40-2061-SC (ASLBP No. 84-502-01-SC), 22 NRC 604, 619 (September 26, 1985) (discussing potential effects of a "partial" waiver through disclosure, even when inadvertent).

Although New England Coalition believes that it could have demanded that Entergy make a showing that Entergy had "substantial need and inability without undue hardship to obtain the substantial equivalent of the materials by other means", New England Coalition has conducted an extensive fourteen hour review of currently available material that could reasonably be said to be responsive to Entergy's request. New England Coalition believes that it has met the requirement of 10 CFR § 2.336 by providing the document attached hereto.

In the event that Entergy believes that New England Coalition may possess or control additional materials of a similar nature for which Entergy can provide an adequate description and demonstrate that it has a "substantial need and inability without undue hardship to obtain the NAew EnglandCoalition's SpedalSiupplementa~y Discovqe Disclosurr to Entergv (February 4, 2004) Page 4 of 4 substantial equivalent of the materials by other means", upon a proper ruling on that showing by the Board in this case, New England Coalition will make every reasonable effort to locate such materials and provide them to Entergy.

As of this disclosure, New England Coalition believes that it has provided, to the best of the knowledge and ability of its agent/representative Mr. Raymond G. Shadis, all currently available material that accommodate Entergy's special request as described in the title of this disclosure statement. See Declaration of Raymond Shadis, attachment I to this document.

Respectfully submitted:

Jonathan M. Block Counsel for New England Coalition 94 Main Street P.O. Box 566 Putney, VT 05346 (802) 387-2646 cc: Service List Attachments: (1) Disclosure Certification (Declaration of Raymond Shadis)*

(2) Privilege log for specially requested documents; (3) List of documents provided for which privilege has not been claimed; (4) Copies of documents**

  • Unsigned copy provided electronically; original signed paper copy filed separately
    • Electronic copies were provided to patties with the original electronic service of this filing

,I7/7'4Ch/41>V7w -1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD It the Mailer of Docket No. 50-271 ENTERGY NUCLEAR VERMONT YANKEE LLC AND ENTERGY NUCLEAR ASLBP No. 04-832-02-OLA OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station) February 3, 2005 NEW ENGLAND COALITION'S CERTIFICATION OF FIRST SUPPLEMENTAL DISCLOSURE I, Raymond G. Shadis, state:

1. I am the Staff Technical Advisor for the New England Coalition. The organization's business address is 67 Main Street, P.O. Box 545 Brattleboro, VT 05302. My address for service in this proceeding is P.O Box 98, Edgecomb, ME 04556. 1 am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of New England Coalition, Inc., a party to this proceeding.
2. As Staff Technical Advisor, I am responsible for the gathering and review of all of the analyses and documentation utilized in the preparation of New England Coalition's contentions in this case. In connection with New England Coalition's first supplemental document disclosures in this proceeding, I have personally reviewed and classified all relevant documents and the production of documents New England Coalition is providing.
3. To the best of my knowledge and belief, New England Coalition's First Supplemental Discovery Disclosures, dated February 3, 2005, describe and transmit all materials required to be disclosed by 10 C.F.R. § 2.336(d) that were identified as relevant to the admitted contentions through a search of the information and documentation in New England Coalition's possession and control.
4. To the best of my knowledge and belief based upon my review of the information and documentation currently available to and in the possession and control of New England Coalition, the disclosures are complete and accurate as of the date of this certification.

I declare under penalty of perjury that the foregoing is true and correct. Executed on February 3, 2005.

ATTACHMENT 2 NEC (Special) First Supplemental Disclosure (February 4, 2005)

LISTINGS OF NEW ENGLAND COALTION PRIVILEGED DOCUMENTS RELATING TO ITS ADMITTED CONTENTIONS PRODUCED UNDER ENTERGY'S SPECIAL REQUEST FOR COMMUNICATIONS BETWEEN NEW ENGLAND COALITION'S PRO SE REPRESENTATIVE AND AGENT, RAYMOND G. SHADIS, AND NEW ENGLAND COALITION'S CONSULTANTS PRIOR TO NEW ENGLAND COALITION BEING REPRESENTED BY COUNSEL Pursuant to 10 C.F.R. § 2.336(a)(3), listed below are documents that are protected from disclosure because of their privileged nature. Those documents are in the nature of work product opinion developed and provided at the request of New England Coalition.

Privileged Document Description Date Privilege Asserted Documents Relating to NEC's Admitted Contentions Document Numbering NECISD #1-8 e-mail from A. Gundersen to R. Shadis: 031013 Two redactions for opinion work at #4, #6 outline rebuttal testimony product

  1. 9 e-mail from A. Gundersen to D. Lochbaum, 040414 Message redacted: opinion work product P. Blanch, R. Shadis: comment in EPU issue
  1. 10-11 e-mail from A. Gundersen to D. Lochbaum, 040415 Messages redacted: opinion work P. Blanch, R. Shadis: comments on EPU product issues with attached comment messages
  1. 12 e-mail from A. Gundersen to D. Lochbaum, 040416 Message redacted: opinion work product P. Blanch, R. Shadis: comment on EPU issues
  1. 13 e-mail from A. Gundersen to D. Lochbaum, 040702 Two redactions for opinion work R. Shadis: comments n MSIV leakage issue product
  1. 14 e-mail from A. Gundersen to D. Lochbaum, 040702 One redaction for opinion work product P. Alexander, R. Shadis: comment on missing records at VY
  1. 15 e-mail from A. Gundersen to D. Lochbaum, 040702 Message redacted: opinion work product R. Shaids, P. Alexander: comment on missing records responding to attached reply comment Attachment 2, page 1

ATTACHMENT 2 NEC (Special) First Supplemental Disclosure (February 4, 2005)

Privileged Document Description Date Privilege Asserted Documents Relating to NEC's Admitted Contentions Document Numbering

  1. 16 e-mail to A. Gundersen to D. Lochbaum 040703 Message redacted: opinion work product from R. Shadis: comment re missing records at VY
  1. 17-19, e-mail from A. Gundersen to R. Shadis, M. 040704 Message redacted: opinion work product; at 17 Gundersen: message with attachment printed out attachment provided (printed out) containing summary of issues in discovery from Entergy in \TPSB case
  1. 21-27, at 21 e-mail from A. Gundersen to R. Shadis: 040805 One sentence redacted as opinion work rebuttal testimony outline for VTPSB case product.
  1. 28 e-mail from A. Gundersen to R. Shadis, P. 040818 Message redacted: opinion work product Blanch, P. Alexander: idea about an issue to raise in VTPSB case
  1. 38-39, at 38 e-mail from A. Gundersen to R. Shadis, 040823 One sentence redacted: opinion work forwarding e-mail from P. Blanch re: product justification for exception to large transient testing
  1. 40 e-mail message from A. Gundersen to R. 040823 Comments preceding letter redacted:

Shadis, forwarding message from P. Blanch opinion work product re Sept. 2003 letter from rVY to NRC

  1. 42 e-mail message from A. Gundersen to R 040830 Messages redacted: opinion work Shadis, re: condenser leakage issue in EPU, product with comment e-mail from D. Lochbaum to R. Shadis, P. Blanch and A. Gundersen re:

minor mod IAB-2003-026, AST Component Mod

  1. 43-44, at 43 e-mail from A. Gundersen to R. Shadis, D. 040914 Sentences redacted: opinion work Lochbaum, P. Blanch re: comments on VY product Fire LER
  1. 45 e-mail from A. Gundersen to P. Blanch, P. 040920 Message redacted: opinion work product Alexander, R. Shadis, D. Lochbaum re:

additional comments on IVY fire report issue

  1. 46 e-mail from A. Gundersen to P. Blanch, R. 040921 Messages redacted: opinion work Shadis, D. Lochbaum: comments re hearing product, hearing strategy strategy on issues raised Attachment 2, page 2

ATTACHMENT 2 NEC (Special) First Supplemental Disclosure (February 4, 2005)

Privileged Document Description Date Privilege Asserted Documents Relating to NEC's Admitted Contentions Document Numbering

  1. 47 e-mail from A. Gundersen to R. Shadis, P. 040927 Messages redacted: opinion work Blanch, D. Lochbaum re: forced outage product, hearing strategy issues related to uprate with attached comment e-mail on same subject
  1. 48 e-mail from A. Gundersen to R. Shadis re: 041003 Messages redacted: opinion work an idea for dealing with issue at hearing with product, hearing strategy attached comment e-mail on same subject
  1. 50 e-mail from A. Gundersen to P. Blanch, D. 041008 Messages redacted: opinion work Lochbaum, P. Alexander, R. Shadis re: an product, hearing strategy issue about root cause analysis
  1. 51 e-mail from A. Gundersen to D. Lochbaum, 041010 Messages redacted: opinion work P. Alexander, P. Blanch, R. Shadis, re: issues product, hearing strategy dealing with uprate related problems
  1. 52 e-mail from A. Gundersen to D. Lochbaum, 041011 Messages redacted: opinion work P. Blanch, R. Shadis, P. Alexander, re: VY product, hearing strategy fire issue
  1. 53 e-mail from R. Shadis to A. Gundersen, re: 041014 Messages redacted: opinion work up-coming prebearing strategic issues product, hearing strategy
  1. 54 e-mail fro R. Shadis to A. Gundersen, re: 041017 Messages redacted: opinion work information needed on contention basis product; hearing strategy Attachment 2, page 3

ATTACHMENT 3 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-271 Entergy Nuclear Vermont Yankee, LL.C.,

and ASLBP No. 04-832-02-OLA Entergy Nuclear Operations, Inc.

(Vermont Yankee Nuclear Power Station) February 4, 2005 NEW ENGLAND COALITION'S (SPECIAL)

FIRST SUPPLEMENTAL DISCLOSURE OF DOCUMENTS PURSUANT TO ENTERGY'S REQUEST All redacted portions of provided documents are listed in the privilege log (Attachment 2) and described in the listing below. Completely redacted document listings are in bold type.

1. E-mail from A. Gundersen to R. Shadis, re: Rebuttal Outline in VY PSB EPU case (October 13, 2003). Pages NEC1SD #1 -8. Minor redactions for opinion work product at pages 4 and 6.
2. E-mail from A. Gundersen to D. Lochbaum, P. Blanch, R. Shadis: comment in EPU issue (April 14, 2004). Page NEC1SD #9. Opinion work product. Withheld.
3. E-mail from A. Gundersen to D. Lochbaum, P. Blanch, R. Shadis: comments on EPU issues with attached comment messages (April 15, 2004). Pages NEC1SD# 10-
11. Opinion work product. Withheld.
4. E-mail from A. Gundersen to D. Lochbaum, P. Blanch, R. Shadis: comment on EPU issues (April 16, 2004). Page NEC1SD# 12. Opinion work product. Withheld.
5. E-mail from A. Gundersen to D. Lochbaum, R. Shadis: comments n MSIV leakage issue Gul2 2, 2004). Page NECISD#13. Two redactions for opinion work product.
6. E-mail from A. Gundersen to D. Lochbaum, P. Alexander, R. Shadis: comment on missing records at VY July 2,2004). Page NECISD#14. One redaction for opinion work product.
7. E-mail from A. Gundersen to D. Lochbaum, R. Shadis, P. Alexander: comment on missing records responding to attached reply comment Uuly 2, 2004). Page NEC1SD#15. Messages redacted for opinion work product.

NEC (Special) FirstSupplementay Discovej Disclosure Document List (February 4, 2005) Page 2 of 4

8. E-mail to A. Gundersen to D. Lochbaum from R. Shadis: comment re missing records at VY (July 3, 2004). Page NEClSD#16. Message redacted for opinion work product
9. E-mail from A. Gundersen to R. Shadis, M. Gundersen: message with attachment (printed out) containing summary of issues in discovery from Entergy in 7TPSB case July 4, 2004).

Pages NEClSD#17-19. Minor redaction for opinion work product at #15.

10. E-mail from A. Gundersen to R. Shadis: rebuttal testimony outline for VTPSB case (August 4, 2004). Page NEC1SD#20.
11. E-mail from A. Gundersen to R. Shadis: rebuttal testimony outline for VTPSB case (August 5, 2004). Pages NECISD#21-27. Minor redaction for opinion work product at #21.
12. E-mail from A. Gundersen to R. Shadis, P. Blanch, P. Alexander: idea about an issue to raise in VTPSB case (August 18, 2004). Page NEC1SD#28. Message redacted for opinion work product.
13. E-mail from A. Gundersen to R. Shadis, re: condenser problems at VY (August 23, 2004).

Pages NEClSD#29-31.

14. E-mail from A. Gundersen to R. Shadis, re: forvarding allegation filed with the NRC over VY's alleged non-compliance with an NRC regulation (August 23, 2004). Pages NECISD#32-33.
15. E-mail from A. Gundersen to R. Shadis, re: forwarding comments from D. Lochbaum and attaching a PDF file containing a Union of Concerned Scientists report on uprate issue authored by D. Lochbaum entitled "Snap, Crackle, Pop..." (Copy attached hereto). (August 23, 2004). Page NEClSD#34.
16. E-mail from A. Gundersen to R. Shadis, re: cooling towers (file attachment within message)

(August 23, 2004). Pages NEClSD#35-36.

17. E-mail from A. Gundersen to R. Shadis, re: msiv, forwarding message from P. Blanch re:

NRC questions to Duane Arnold (August 23, 2004). Page NECI SD#37.

18. E-mail from A. Gundersen to R. Shadis, forwarding E-mail from P. Blanch re: justification for exception to large transient testing (August 23, 2004). Pages NEClSD#38-39. Minor redaction at #38 for opinion work product.
19. E-mail message from A. Gundersen to R. Shadis, forwarding message from P. Blanch re Sept. 2003 letter from VY to NRC (August 23, 2004). Page NEC1SD#40. Minor redaction for opinion work product.

NEC (Specal) FirstSupplementagy Discovey DirslosureDoacment List (February 4,2005) Page 3 of 4

20. E-mail from A. Gundersen to R. Shadis, re: VY doesn't want to test MSIVs even though GE has a string recommendation, forwarding message from P. Blanch to A. Gundersen on same subject (August 23, 2004). Page NECISD#41.
21. E-mail message from A. Gundersen to R. Shadis, re: condenser leakage issue in EPU, with comment E-mail from D. Lochbaum to R. Shadis, P. Blanch and A.

Gundersen re: minor mod MM-2003-026, AST Component Mod (August 30, 2004).

Page NEC1SD#42. Messages redacted: opinion work product.

22. E-mail from A. Gundersen to R. Shadis, D. Lochbaum, P. Blanch re: comments on VY Fire LER (September 14, 2004). Pages NEClSD#43-44. Minor redactions at #43 for opinion work product.
23. E-mail from A. Gundersen to P. Blanch, P. Alexander, R. Shadis, D. Lochbaum re:

additional comments on VY fire report issue (September 20, 2004). Page NEC1SD#45. Message redacted: opinion work product.

24. E-mail from A. Gundersen to P. Blanch, R. Shadis, D. Lochbaum: comments re hearing strategy on issues raised (September 21, 2004). Page NEC1SD#46. Message redacted: opinion work product, hearing strategy.
25. E-mail from A. Gundersen to R. Shadis, P. Blanch, D. Lochbaum re: forced outage issues related to uprate with attached comment E-mail on same subject (September 27, 2004). Page NEC1SD#47. Message redacted: opinion work product, hearing strategy.
26. E-mail from A. Gundersen to R. Shadis re: an idea for dealing with issue at hearing with attached comment E-mail on same subject (October 3, 2004). Page NEC1SD#48. Message redacted: opinion work product, hearing strategy.
27. E-mail from A. Gundersen to R. Shadis, P. Blanch, D. Lochbaum, P. Alexander, re: forced outages, forwarding message on same subject (October 3, 2004). Page NEC1SD#49.
28. E-mail from A. Gundersen to P. Blanch, D. Lochbaum, P. Alexander, R. Shadis re:

an issue about root cause analysis (October 8, 2004). Page NEC1SD#50. Messages redacted: opinion work product, hearing strategy.

29. E-mail from A. Gundersen to D. Lochbaum, P. Alexander, P. Blanch, R. Shadis, re:

issues dealing with uprate related problems (October 10, 2004). Page NEC1SD#51.

Messages redacted: opinion work product, hearing strategy.

30. E-mail from A. Gundersen to D. Lochbaum, P. Blanch, R. Shadis, P. Alexander, re:

VY fire issue (October 11, 2004). Page NEC1SD#52. Messages redacted: opinion work product, hearing strategy.

NEC (Specal) First Supplementag Discovey Disclosure Document list (Februaq 4, 2005) Page 4 of 4

31. E-mail from R. Shadis to A. Gundersen, re: up-coming preheating strategic issues (October 14, 2004). Page NEC1SD#53. Messages redacted: opinion work product, hearing strategy.
32. E-mail fro R. Shadis to A. Gundersen, re: information needed on contention basis (October 17, 2004). Page NEC1SD#54. Messages redacted: opinion work product; hearing strategy.

Respectfully submitted:

Jonathan M. Block Counsel for New England Coalition 94 Main Street P.O. Box 566 Putney, VT 05346 (802) 387-2646 cc: Service List

NEC Attachment 4 NEW ENGLAND COALITION'S (SPECIAL) FIRST SUPPLEMENTAL DISCOVERY DISCLOSURE TO ACCOMMODATE ENTERGY'S REQUEST FOR E-MAIL COMMUNICATIONS BETWEEN NEW ENGLAND COALTION AND ITS REPRESENTATIVES AND AGENTS IN THIS CASE PRIOR TO NEW ENGLAND COALTION RETAINING COUNSEL DOCUMENTS Documents provided are all copies of e-mail. Description of redacted e-mail and claim of privilege for all specific redactions may be found in the privilege log (attachment 2) and the list of disclosure documents (attachment 3). One additional document has been provided as a separate electronic file, a UCS report, file "20040709-ucs-snap-crackle-pop-bwr-epu2.pdf" (described as an attachment to item # 15).

C.-

Date: October 13, 2003 To: "Raymond Shadis" <shadisgime.net>

From: "Arnie Gundersen" <arniegundersen~sailchamplain.net>

Subject:

2nd day effort Ray, new stuff is DARK Rebuttal Outline VY Physical deterioration of plant wvill adversely effect reliability From the Entergy Nuclear Vermont Yankee Business Plan 2003 (April 2003, rev 1): "Lower costs translate into higher profits. With clear corporate and market expectations of ENN's contributions to earnings, a concentrated focus on lowering costs is required. Nuclear plants ust have a low-cost position to remain competitive in an increasingly unregulated northeast market for electricity."

1. Feedwater pipe wear.. .Accelerated Corrosion Inspection Program, 1999 refueling outage inspection report, Feb 2000 On the method used, VY states "The wear rate calculations and projected times to code minimum are assumed to be linear. In fact they may not be..." (page 5). Page 8 continues

'Feedwater piping from the feed pumps past the feed regulator valves.. .this section of the feedwater system has the highest ..operating pressure...there may be a small margin for wall loss due to flow accelerated corrosion. In addition to the limited margin, areas at counterbores for specific welds were originally fabricated with thicknesses close to code minimum wall thickness.

Increased FAC wear rates are are expected in the feedwater system and portions of the Heater Drain system." Page 9 states" the main area of concern is the feedwater system piping from the feed pumps past the feed regulator valves. Due to the design pressures and the installed wall thickness, this portion of the feedwater system has a relatively low margin for wvall loss due to flow accelerated corrosion." NOTE: This is at present power not upgrade power.

It is important to note that this sampling program is only a statistical sampling which means that problems can still exits elsewhere. Page 9 states "Also, provision for procuring piping and fittings for replacement of selected components on short notice should be established". NOTE This indicates that the authors acknowledge how likely the is that a failure in this piping could occur. Page 10 expands on this argument by stating "The potential for finding significant wear in any piping component exists. Contingency planning as required for either repair or replacement of large bore components in the feedwater system should be considered." Page 10 also acknowledges that only a "...relatively small number of components inspected each outage."

In the 2002 Refueling Outage Report on Flow Accelerated Corrosion, page 9 states "..with future operation under GE hydrogen water chemistry, wear rates in the feedwater system and heater drain system are expected to increase. The feedwater system piping from the feed pumps past the regulator valves has a relatively low margin for wall loss due to flow accelerated corrosion."

NEC1SDM 1

Page 10 acknowledges that things will get worse with the proposed upgrade. "The planned power upgrade project underway at VY will require a complete review of program evaluations, piping modeling, and procedures to account for changes in equipment and flow regimes in plant piping systems. The review should be performed prior to the next refueling outage..."This recommendation was made in January of 2003, however no additional information regurding this program was provided in discovery seven months later.

In an email from Enrico Betti to Craig Nelson 4/16/03, Betti states "What this says to me is that the feedwater system has little or no reserve margin..."

Despite all these indications that the system is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, page 2, Mr. Thayer ststes that "..plant modifications that are necessary to achieve the power upgrade have been firmly established for months." And is attachment EN-JKT- I0 to the same testimony entitled Vermont Yankee Power Upgrade Project Description a list of components planned to be changed is provided. There are no listings for the feedwater system. Based on this description, VY has no intention of making any improvements to the feedwater system.

2. Condenser tube Wear>

According to page 1 of the Vermont Yankee Nuclear Plant Condenser Evaluation, dated November 1999, but signed by Carl Kuester on March 9, 2000, VY planned that the condenser would last 12 more years, but only if power increased by a 5% or less and modifications were made. The Kuester study concluded that if all his recommendations were implemented (including $ 85,000 upgraded inspections of tubes each refueling outage, epoxy coating of tube inlets and outlets for $ 285,000). On page 26, Kuester concludes "If programs are formulated and acted upon, this condenser should be in satisfactory service in 2012 baring any unusual accident or occurance not yet seen." ENVY provided no documentation that I am aware of to show that Kuester's recommendations were acted upon.

Had Kuester's recommended for epoxy coating of the tube inlet been implemented, this would reduce erosion. However, two years later in a 11/28/01 report to Marstaller from Zalewski .

section 1.1 notes that "Inlet end erosion is also present... .While wall losses are not so severe to present an immediate hazard, the corrosion continues to grow." According to section 2.9 of this report, "The random stress cracking may be limiting factor in the remaining useful life of the brass condenser tubes." It also states that "The corrodent necessary to propagate these cracks has not been identified. Identifying and removing the corrodent is likelt to be the only way to interrupt the progression of the stress cracking..."

In a 2/7/02 memo from Betti to "File UND2002-042 07", entitled Condenser Long Term Plan, Betti states "VY has been fortunate to have our condenser tubes last 30 years." He also states "The current erosion inspection sample is too small." ( This was Kuester's recommendation 3 years earlier). Both Betti and Kuester identify that it is important to note that any inspection program is only a statistical sampling which means that problems can still exits elsewhere. Also NEC1SDM 2

three years after Kuester recommended epoxy coating, Betti states, "One preemptive measure to prervent continued tube end and tube sheet erosion would be epoxy coating...." He goes on to state "The coating....are better done soon before leaks occure." Betti then states "It is unlikely even with preemptive repairs the current tubes could be maintained long beyond 2012. Retubing as early as possible would reduce the risk of condenser leaks." Finally, if Figures 3 and 4 in Betti's Condenser Long Term Plan are any indication, VY has not accounted for power uprate.

The projections of wear rates are linear, even after the proposed extended power uprate happens.

Even as of October 2002, ENVY was still contemplating Kuester's recommendation from 1999.

Specifically, the "Record of the nineteenth Eddy Current Inspection, signed by Zalewski recommends epoxy coating the tube sheets and inlet tubes and increasing the inspection sample.

ENVY provided nothing during discovery which indicated that that any of these important recommendations which they have know about for four years have been acted upon.

Despite all these indications that the system is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, page 2 Mr. Thayer ststes that "..plant modifications that are necessary to achieve the power upgrade have been firmly established for months." And in attachment EN-JKT-I0 to the same testimony entitled Vermont Yankee Power Upgrade Project Description a list of components planned to be changed is provided. There are no listings for the condenser system. Based on this description, VY has no intention of making any improvements to the conderser system.

3. Because the cooling towers are under sized for 120% power, the condenser backpressure will fluctuate as it has not in the past. This will be especially true in summer months when no heat can be dumped to the Connecticut River and all Cooling Tower cells are operating. This fluctuating pressure will increase the high cycle fatigue on the conderser tube sheet which is already damaged. From "Technical Evaluation No. TE 2001-047" approved by E Betti on 6/22/01 ,"The original Westinghouse condenser bracing system had deficiencies that (following 23 years of operation) contributed to a 6 foot crack in the A condenser.....Additional large cracks were found and repaired in the following refuel outage in the same location in the B condenser (1995)." The report goes on to say, "It should be noted that the original condenser welds were very poor ....... These welds from the standpoint of ultimate strength under primary load standpoint can ... support gravity and pressure loads from service conditions.....secondary loads are important from the standpoint of fatigue failure. Fortunately VY is a base load plant, and the pressurization cycles for the condenser will not likely exceed 200 cycles through the end of license." When this report was written, this may have been true, but the 120% upgrade introduces fatigue cycles which the author had not anticipated.

Despite all these indications that the system is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, page 2, Mr. Thayer states that "..plant modifications that are necessary to achieve the power upgrade have been firmly established for months." And in attachment EN-JKT-10 to the same testimony entitled Vermont Yankee Power Upgrade Project Description a list of components planned to be changed is provided. There are no listings for the NECISD# 3

condenser tube sheet. Based on this description, VY has no intention of making any improvements to the condenser tube sheet.

4. The Quad Cities dryer first failed in June 2002. As early as 9/26/02, VY was aware that increasing the reactor flow would cause problems with the Steam Dryer. Rather than completely analyse the problem, in an unsigned, undated, untitled document provide in discovery reviewer Brian Hobbs was told " ... add a statement justifying why expansion of the operating domain will not result in dryer component failures." (The only available reference is 128/tO305, M I testified before the Board on June 19, and was unaware that the same dryer had failed a second time on June 11, 2003. In my oral testimony, I related problems which I had encountered on early BWR's wherein we had thought we had solved the problem, only to have it erupt again within a year. This is exactly what happened at Quad Cities, and what ENVY had denied could happen at Vermont Yankee. In fact, the second failure appears to be much worse than originally anticipated. According to NRC Information Notice 2002-26, supplement 1, dated July 21, 2003, "Inspection of the dryer revealed (I0 through wall cracks (about 90 inches long) in the vertical and horizontal portions of the blank hood, 90 degree side, (2)one vertical and two diagonal braces detached....,(3)one severed internal brace..., and(4)three cracked tie bars. ...The licensee believes that the most probabale cause of the failure is low frequency, high cycle fatigue driven by flow induced vibrations associated with higher steam flovs present during EPU operating conditions."

The Board is urged to remember that in 2002, Quad Cities told the NRC that the repairs would successful solve the first failure. In the "Preliminary OE Report", OE16403, the NRC states that after the first failure, "Several teams of Excelon Nuclear, General Electric and industry experts are assembled to ...determine the ...corrective actions." Dispite this expert review, the dryer failed again and was much worse, less than a year later. The key statement from the latest NRC information notice is exactly what I had been trying to tell the Board in my oral testimony. "GE Nuclear Energy and the licensee did not foresee this phenomenon." As Shakespeare would say, "There are more things in heaven and earth, Horatio, then are dreamt of in your philosophy." When you push an old plant beyond what it was designed to perform, there will always be situations where VY "...did not foresee this phenomenon."

ENVY Expert Witness Dodson (reliability expert) provides an exhibit highlighting the significance of the two events at Quad Cities. It is an Inside NRC newspaper article from June 30,2003 which states that "fatigue relating to the age of the plant may have contributed to the crack." By providing this exhibit, Dodson apparently supports the point I made in my oral testimony, when I stated that plants built when Lawrence Welk was on TV were more likely to experience failures.

Despite all these indications that the Dryer is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, attachment EN-JKT-1 0 is entitled Vermont Yankee Power NEC1SDH 4

Upgrade Project Description. Based on this description, VY has no intention of making any improvements to the steam dryer system.

5. VY already has cracks in its steam dryer and surrounding area.

A. The 215 Dryer support bracket has had cracks since 1983 (Report of In-Vessel examination, March April 1995).

B. In 1999 three new cracks were identified in three of the Steam Dryer Jacking Bolts (144,215, and 324). (Vermont Yankee RFO 21,). Despite our discovery request ,ENVY failed to provide section 2.4 of this report which discusses the magnitude of these cracks.

C. In the 2002 RFO 23 In-vessel Services Final Report, new debris was located on the 180 end of the Dryer Cover Plate. Despite our discovery request, ENVY failed to provide tab 9 of this report which discusses the magnitude of this debris.

Because ENVY failed to provide key pieces of information, I am forced to conclude that the trens is that failures in this area are continuing to grow.

There are weaknesses in the design basis documents

1. VY apparently did not know their plant had a 40 year life, as they asked why I stated a 40 year life in their discovery of me. They initially refused to provide us documents to prove our claim, then provided the documents with 146 key pages 'accidentally missing". It was only after a detailed page count that we were able to identify the pages which would support our 40 year claim. The document VYC-378 supposedly contains 155 pages....even after we requested a full copy we only got 131 pages plus a 6 pages cover memo.. Page 1 of 6 of VYC- 378 states "This document contains 155 pages" but only 131 (plus 6) follow, or 137 pages. Where are the missing 18 pages? Are VY's files in such awful shape that they have lost this KEY documentation? I conclude that pieces of this KEY design basis document is missing, which shows a clear weakness in the design basis for the plant.

In a 131 page appendix to document VYC 378, dated December 14, 1987 and signed by Jay Thayer, on page 23 of 131, E. J. Betti states "..the reactor vessel was designed for the major transients that could occur during the plant 40 year life." NOTE, the text say PLANT lifetime, not reactor lifetime. Page 32 of 131 appears to be from the VY FSAR, and it states ""The reactor vessel is designed for a 40 year life..."." Page 43 of 131 also states ""The reactor vessel is designed for a 40 year life..." Page 69 of 131 also states ""...extrapolate to a 40 year life."

This same page also states "They values shown for VY are projected annual frequency averaged over a 40 year plant lifetime." NOTE, the text say PLANT lifetime, not reactor lifetime. It is clear that VY had no knowledge of their FSAR or their design basis, which implies the need for a vertical slice of the plant's systems.

2. VY promised to inspect RR-44 hanger in their August 2001 ISI Summary Report to the NRC (BVY 01-66) Page 19 states that problems with hanger RR-44 will be "revisited" during the next refueling outage.. .HOWEVER, in the January 9 2003 ISI Summary Report to the NRC for NEC1SDM 5

the next refueling outage(BVY 03-02), there is no reference that this hanger was ever reinspected. This is an indication that the commitment follow system does not work.

3. VY did not use the correct design basis when evaluating the control room habitability after an accident. They used 80 degrees when their design basis calls for 85 degrees....If they had used the correct numbers, they would have had to declare the system inoperable.....200 times in last 4 years the river temperature has exceeded 80 degrees
4. The PRA numbers for VY are way out of line with other reactors
6. In a private phone call to NRC (Telecon 1/8/03 9-10 AM) the NRC told Entergy that the GE Constant Power Upgrade Licensing Topical Report (CLTR) was "ambiguous" because GE had provided "a piece-meal safety analysis" and that there was "insuffiecient analysis information on which to judge a decision on public safety". The NRC told Entergy that when they talk to GE "Everytime we talk, the ambiguity gets larger". The NRC also told Entergy that GE "...assumes the staff can reach conclusions on public safety without having adequate analysis on how the plant will operate in the future." The NRC also told Entergy that GE had not "..integrated fuel, accidents, and transient analysis...", and that nothing was analysed in the CLRT unless the fuel was provided by GE. The NRC also told Entergy that "GE wants to carve everything into little pieces that are not analysied in an integrate fashion" The NRC told Entergy that GE was trying to get licensed power upgrades " ON THE CHEAP".

In a "Private and Confidential" memo date 12/18/02 Entergy's Don Leach told Entergy staffers that he had spoken to Jim Klaproth of GE. The memo says that Klaproth of GE was meeting with the NRC Chairman and commissioners on 1/22/03, and that if the NRC had not approved the GE report, Klaproth was "..going for the jugular" I conclude that General Electric is using threats to get approval of the CLRT.

There are significant differences between VY and other plants GE has licensed. In an internal memo from Robert Vita to VY staff on 12/19/02, Vita states, "Again, it appears that VY is not a "normal" plant when trying to bound us generically with other BWR-4s." There is no suggestion why Vita stated "AGAIN", but there must be many instances where VY does not fit the analysis that GE is trying to get the NRC to approve. In this memo, VY has discovered that its nuclear reactor has exceeded its ultimate design pressure under certain accidents at the 120% power level. Vita states that compared to other BWR-4, VY has low steam capacity and a different safety relief valve arrangement. Vita then states, "I am concerned that we are seeing VY challenge generic analysis previously performed by GE... .I am not sure that the statements, engineering judgement or bounded by previous plant experience (sic), is acceptable for VY."

Shine dose We need to look at the dose conversion factor NEC1SDH 6

Stone and Webster has made non-conservative assumptions in developing the transit time for the steam from the reactor to the steam turbine. In the July 31, 2003 transmittal, witness George Thomas states that calculation CYC -2298 was the basis for the new turbine "shine" dose which was first provided to the commission on XXXXXXXX. These calculations were completed on June 6, 2003. It is surprising that this data was calculated after ENVY provided supposed calculated dose values as part of these proceedings. The S&W calculations were based on an earlier calculation (Hansen to Strum 4/9/85). In the earlier calculations, a transit time of 3.6 seconds was determined, and there was considerable uncertainty even in that value. In 1985, Hansen stated "As can be seen from the above, there are not enough hard cold facts to base a calculation on." Despite the fact that Hansen calculated 3.6 seconds, on page 16 of the recent S&W report, S&W arbitrarily INCREASES the pre-EPU transit time to 4 seconds. This 11%

increase is not conservative for two reasons. First, the longer the transit time the more N 16 will decay before reaching relatively unshielded areas in the turbine hall which decreases the calculated exposure. Second, the 1985 value was not based on "..hard, cold facts...". This mistake by S&W means that the predicted shine dose is approximately 16% lower than it should be. (The 16% is not linear with the 11% because of the exponential decay of N-16).

This indicates a gross breakdown in the ENVY quality assurance system as well as a dose to the public which is not conservatively calculated.

I've not seen either calculation, but it sounds like they determine the shine dose based on N-16. Is the reactor assumed to be operating at, or close to, the technical specification limit on reactivity levels in the primary coolant? While this contribution is secondary to the N-16 contribution, it is not zero and would be non-conservative if ignored. Or, put another way, Vermont Yankee would be operating outside its design and licensing basis if it operated with fuel leakers when its safety studies assumed otherwise.

Cooling towers From the Stone & Webster Evaporation Loss Study, Exhibit DEY-3, drift of 183 gallons per minute is stated twice on pages 4 & 7, at 120% power . Using elementary Algebra, this converts to 263,520 gallons per day. The calculation is provided below.

1) 183 gallons per minute x 60 = 10,980 gallons/hr.
2) 10,980 gallons per hour x 24 = 263,520 gallons/day.
3) 263,520 gallons per day/55 gallon drum = 4,791 drums/day.

This means that the surrounding community will be converted into swamp-like conditions, as almost Five Thousand 55 gallon drums of water will be dropped on them each day.

There is no way that 125 HP fans will cause a plume to be only 20 % bigger than now, which means waste heat will be dumped to the river... .salmon issues and control room habitability issues... .The river already hit 84.7 degrees, with this increased load, it will exceed its design basis Control room habitability Licensing basis The river already hit 84.7 degrees, with this increased load, it will exceed its design basis NEC1SDM 7

Reliability In the Prefiled Rebuttal Testimony of Edward Burns, ENVY's nuclear reliability expert states that as a result of the Power Upgrade, he would anticipate that the loss of availability of the VY unit as a result of the Power Upgrade will be 2%. Availability is defined in the NRC's gray book (NUREG-0020) as number of hours the reactor was critical divided by the number of hours in the period. If the availability is reduced by 2%, it means the reactor is not critical for a longer period of time, and hence not producing as much power. If the reactor is available 90% of the time, it is critical 328.5 days out of a 365 day period. If the reactor is available 2% less (88%), it is critical 321.2 days out of a 365 day period. In any event, 2% of 365 days is 7.3 additional days when VY will not be operating as a result of the power upgrade. Assuming for a moment that this 2% is correct, Wittness Sherman has calculated that a day of lost generation costs the ratepayers of Vermont S88,000 based on $50 per megawatt on the spot market. As I write this, the August spot market price is $160.

Multiplying 7.3 lost days times $88,000 yeilds a loss to the Vermont ratepayers of S642,000.

If the plant breaks down for 7 days in August when the spot market is high, ratepayers *will lose $2,168,320. A summer breakdown is more likely, as that is the time of the year that cooling tower restraints place back presure on the condenser, which as shown elsewhere is already prone to failure. When the unit is running, Entergy collects significant revenues and pays the State approximately $400,000. But because the unit will be less reliable, the rate payers will in fact be loosing at least S220,000 each year (and quite possibly

$1,768,000) while VY continues to make significant revenues when it operates.

Wittness Connie Wclls appears to agree with this lack of shared risk, with benefits accruing to ENVY. According to page 4 of the Prefiled Rebuttal Testimony of Connie WVells,"... VY's obligation is to provide power to VPNPC only when the VY station is producing power, and if for any reason the Station is not producing power, Entergy Nuclear VY has no obligation to obtain replacement power or otherwise indemnify VYNPC." However, in an attempt to distort this fact, Brian Cosgrove states in a memo on Public Relations Strategy, dated 4/29/2003, "Vermont ratepayers will have no economic risk" (August 1, 2003 transmittal to Shadis). Clearly, VY does not what the public to know how big a tab they are being asked to pick up.

The above analysis assumes that the 2% decrease in reliability calculated by Burns is correct. I believe this value is not correct for several reasons: First, Dodson provides an exhibit highlighting the significance of the two events at Quad Cities. It is an Inside NRC newspaper article from June 30,2003 which states that "fatigue relating to the age of the plant may have contributed to the crack." By providing this exhibit, Dodson apparently supports the point I made in my oral testimony, when I stated that plants built when Lawrence Welk was on TV were more likely to experience failures.

NECISD# 8

Date: Wed, 14 Apr 2004 19:23:48 -0400 To: Lochbaum David <dlochbaum(ucsusa.org>, Blanch Paul <pmblanch~attbi.com>, Shadis Raymond <shadis~ime.net>

From: Arnie Gundersen <arniegundersengsailchamplain.net>

X-ASG-Orig-Subj: worse than you think

Subject:

worse than you think NEC1SDH 9

Date: Thu, 15 Apr 2004 08:58:10 -0700 (PDT)

From: Arnie Gundersen <arniegundersen~sailchamplain.net>

Reply-To: arniegundersen(sailchamnplain.net X-ASG-Orig-Subj: Re: Houston, we have a problem

Subject:

Re: Houston, we have a problem To: Dave Lochbaum <dlochbaumgucsusa.org>, pmblanch~attbi.com, shadis(ime.net, arniegundersen~sailchamplain.net

--- Dave Lochbaum <dlochbaum(ucsusa.org> wrote:

> Hello Arnie:

> Liave

> >>> Arnie Gundersen <arniegunder

> Re MSIV: SEE BERLOW Dave -z j

> begin torwarded message:

> > From: "Dave Lochbaum" <dlochbaumeucsusa.org>

> > Date: April 8, 2004 12:54:11 PM EDT

> > To: <pmblanchgattbi.com>, <shadiseime.net>, <arniegundersengyahoo.com>

> > Cc: <mgundersenesailchamplain.net>, <cristobl~sover.net>

Subject:

Re: relief valves

> > Hello Arnie:

> > Than}

> > Dave NECISDII 10

> >>>> Arnie Gundersen <amiegundersen(yahoo.com> 04/07/04 08:59PM >>>

NEC1SDH 11

Cc: Dave Lochbaum <dlochbaum(ucsusa.org>, pmblanchgattbi.com, shadisgime.net From: Arnie Gundersen <arniegundersen~sailchamplain.net>

X-ASG-Orig-Subj: Houston, we have a series of problems

Subject:

Houston, we have a series of problems Date: Fri, 16 Apr 2004 07:20:54 -0400 To: arniegundersen(sailchamplain.net NEC1SD# 12

To: Shadis Raymond <shadis(ime.net>, David <dlochbaumgucsusa.org>

From: Arnie Gundersen <arniegundersen~sailchamplain.net>

Subject:

MSIV Leakage Date: Fri, 2 July 2004 All Quotes fro VY report CR-VTY-2004-0917. May 5, 2004, 31 pages "MSIV As-Found LLRTs Show an Adverse Trend" Adverse Trend Common Cause Analysis

1. The PROBLEM in VY's eyes: Since 1973, there have been 14 LLRT MSIV test failures... 4 failures in the first 23 years from 1973-1996... THEN 10 FAILURES IN THE LAST 8 YEARS.

Why? "The low incidence of MSIV failures prior to 1996 is ... the result of non-conservative test method.... The validity of this method relies on a number of assumptions that could not be verified..." (Page 11) "The As Found LLRT history for MSIVs shows an adverse trend over the past four refueling outages. In RFO-21, there were zero ....; in RFO -22 there was one: In RFO 23 there were two; in RFO-24 there were three." (Page 1)

2. The Solution in VY's eyes: "Implementation of higher MSIV LLRT leakage limits in accordance with the pending alternate source term license amendment." (Page 2)
3. The REAL problem.... The existing MSIVs really are not up to the task. "... there is also a consensus that the Wye pattern globe valve is less than optimal from a design and application point of view..." (Page 12) Also, "...the seating force in the MSIVs is marginal..." (Page 8)
4. The Problem will get worse with the Uprate. "Flow induced damage can include valve stem bending valve stem disc separation and damage to the guide ribs." (Page 27)
5. MY CONCLUSIONS:

A. The VY proposal to increase the allowable MSIV leakage will result in a reduction in safety margin even at the present power level.

B. The safety margin will be further reduced with increased flow from the Uprate.

C. In RFO -21, the identical test resulted in NO DEFICIENCIES. In RFO- 22, there was only one deficiencies. The problem is not that the test is a poor one. The problem is that as the plant ages, the valve leakage is increasing. It is a classic bathtub curve with increasing deficiencies each outage as the plant gets older. VY is trying to sweep an age relate problem under the rug by changing the test. The test is fine, as indicated by excellent results in RFO-21 and RFO-22.

The plant is getting old and the valve design was marginal in the first place.

Arnie NEC1SDH 13

Date: Fri, 2 Jul 2004 13:18:55 -0400 From: Arnie Gundersen <arniegundersen~adelphia.net>

Cc: Lochbaum David <dlochbaumrucsusa.org>, Alexander Peter <cristoblesover.net>

To: Shadis Raymond <shadis~ime.net>, Alexander Peter <cristobl(sover.net>

X-ASG-Orig-Subj: Missing records at VY

Subject:

Missing records at VY

1. The original seismic analysis of the safety related cooling tower was done by Fluor before the plant was built. An undated attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT00205 and 206), "There is no documentation of the calculation of the loads used for the analysis or a comparison of the calculated loads to allowable loads."
2. MR 83-2055 modified the Cooling towers in 1983. An attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT00206), "I am not able to locate any analysis associated with these modifications to determine what force would cause the ties to break."
3. MR 8-0635 and 0636 again modified the cooling towers in 1985. An attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT 00206), "Again, I was not able to locate any analysis associated with these modifications."

In prior testimony, I noted documentation and record retention problems associated with the 1986 CB&I report on the 40 year design life of the plant. Since testifying, of course there has been the missing fuel rod documentation problem (1979 +) as well as 20 undocumented cracks in the steam dryer, which VY has stated may have been there since the plant was built.

The common thread for all these documentation issues is that all of then occurred a long time ago. If the original design basis of the plant cannot be found, it is difficult to predict the future performance of said plant. "Houston, we have a problem."

NEClSDH 14

Date: Fri, 2 Jul 2004 15:21:13 -0400 To: "Dave Lochbaum" <dlochbaum~ucsusa.org>]

Cc: <shadis~ime.net>, <cristobl(sover.net>

From: Arnie Gundersen <arniegundersen~adelphia.net>

X-ASG-Orig-Subj: Re: Missing records at VY

Subject:

Re: Missing records at VY Dauve On Jul 2, 2004, at 3:15 PM, Dave Lochbaum wrote:

Hello Arnie:

Dave NEC1SDH 15

To: Arnie Gundersen <arniegundersen .. snip... Lochbaum" <dlochbaum~ucsusa.org>

From: Raymond Shadis <shadisgprexar.com>

Subject:

Re: Missing records at VY Cc: <shadiseime.net>, <cristobl(sover.net>

Date: Sat, 3 July 2004 NEC1SD# 16

To: Shadis Raymond <shadisgime.net>,

Gundersen Margaret <mgundersen~sailchamplain.net>

From: Arnie Gundersen <amiegundersen~adelphia.net>

X-ASG-Orig-Subj: Hot Off The Press

Subject:

Hot Off The Press Date: Sun, 4 Jul 2004 22:18:48 -0400 ATTACHMENT After my prefiled testimony was submitted for the July 8 hearing, ENVY provided xxx pounds of discovery material which support conclusions of my previously prefiled testimony on this docket and specifically supported my prefiled testimony on the issue of the cooling tower uprate.

My conclusions based on this newly provided ENVY material are listed below:

Conclusion 1 Two previous failures The VY towers have had structural problems in the past. Preventative Maintenance Basis Document M307, rev 6, Bates CT 00983 states that in the summer of 1994, a column failed which resulted in improvements in inspection procedures to prevent similar occurrences. The 1994 CAR notes that "...the subject columns are in high stress areas where we have experienced degradation over time." Again in 1997, a column failed in CT-2-1. This second failure was attributed to weak inspection procedures.

Conclusion 2: Seismic Analysis The new information provided by ENVY indicates that ENVY has already recognized the need for a structural analysis as I recommended, but as of now, ENVY has failed to act on that recognized need.

A. An incomplete structural analysis performed in 1986 which indicates "... that several members are slightly overloaded, but were deemed acceptable, and others were within 10% of allowable load. A check of the loads at the anchor bolts is not included in the report. (Bates CT00206)

B. In an email dated 6/4104, Yasi to Thomas et al, "

Subject:

Summary of Request for VY CT uprate", Bates CT00208,it states, "Please include any cost or other issues that will be involved in confirming the upgrade will not impact the Seismic qualification of the 2 seismic cells. Please include your judgement as to any seismic modifications required to maintain the seismic qualification."

In a email dated June 8, 2004, George Thomas to Mike Tessier, there is an attached Tower Performance Incorporated report (Bates CT00238 through 00240) which states, "Additional uncertainties already mentioned are the changes that may be required to the cooling tower NEC1SDH 17

structure. The cost of a structural evaluation by a professionally licensed structural engineer must be included."

An unnamed Marley Cooling Technologies to S&W document dated 6/25/04 (Bates CT 00210) states, "Please include any cost or other issue that will be involved in confirming the uprate will not impact the seismic cells ........ A full structural evaluation (computer generated) will run approximately $25,000 including a site/tower inspection by licensed professional engineers from our engineering group. Note: The current design code may be different from that used in the original design of the tower(s)."

Email, Thomas to Yasi, 6/22/04, Bates CT00137, "we need to determine the extent of the cell 2-I ans 2-2 mods and make an assessment with Construction as to whether they can be installed in a seven day LCO. Jay needs to be briefed on this prior to his testimony on July 8. This is followed on the same page by an update from Yasi: "George has initiated a Requisition to Marley for Structural Engr to come on site, walkdown tower, and assist in identifying any structural/seismic impacts associated with upgrade."

Conclusion 3: Records Retention In my review of VY records in support of NEC in the Uprate Hearings, I have discovered a disturbing trend in the area of RECORD RETENTION for safety related items:

A. The original seismic analysis of the safety related cooling tower was done by Fluor before the plant was built. An undated attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT00205 and 206), "There is no documentation of the calculation of the loads used for the analysis or a comparison of the calculated loads to allowable loads."

B. MR 83-2055 modified the Cooling towers in 1983. An attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT00206), "I am not able to locate any analysis associated with these modifications to determine what force would cause the ties to break."

C. MR 8-0635 and 0636 again modified the cooling towers in 1985. An attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT 00206), "Again, I was not able to locate any analysis associated with these modifications."

In prior testimony, I noted documentation and record retention problems associated with the 1986 CB&I report on the 40 year design life of the plant.

Since testifying, of course there has been the missing fuel rod documentation problem (1979 +) as well as 20 undocumented cracks in the steam dryer, which VY has stated may have been there since the plant was built.

The common thread for all these documentation issues is that all of them occurred a long time ago. If the original design basis of the plant can not be found, it is difficult to predict the future performance of said plant. In October 1996, the NRC sent VYNPC a letter requiring a response in accordance with 10 CFR 50.54(f) regarding the adequacy and availability of design basis NEC1SD# 18

information. One wonders how VY's licensee could have told NRC then that it had design basis information under control and tell folks now that some information is unavailable.

Conclusion 4 Excess weight from flooded drift eliminators A. Technical Review of Cooling Tower Upgrade Design Studies, By Robert Fulkerson, February 18, 2003, Recommendations (Bates CT00659) states, The drift eliminators in the towers are the original HY-V eliminators. If the increase in the If the increase in airflow through the towers draws excessive water droplets into the drift eliminators, they may become flooded amd unable to drain properly. If this occurs, it may be necessary to replace the drift eliminators B. In a email dated June 8, 2004, George Thomas to Mike Tessier, there is an attached Tower Performance Incorporated report (Bates CT00238 through 00240) which states, "Another possibility that may arise.... Is an increase in drift leaving the tower.. However, the drift eliminators presently in the cooling towers are not the most efficiently designed drift eliminator available. An increase in air velocity through the drift eliminators will result in an increase of drift leaving the cooling tower. The amount of the increase cannot be calculated as performance information for these drift eliminators is unavailable. A large increase in drift could result in damage to the cooling tower fans, as well as affecting the area surrounding the cooling tower."

Conclusion 5 Age Related Problems A. An undated Project Definition Document, page 8, (bates CTOOOIO) states," It is recognized that the existing MCC's have been in operation for approximately 35 years and obsolescence is an issue. Also with age comes increased maintenance..... The modification will be an expensive process and when done, VY will be left with aging equipment."

B. Email from Wonderlick to Kowal et al, June 10, 2004 Bates CT001 14, states, "The latest readings, while still acceptable, indicate that the cable insulation is weakening" NEC1SDH 19

Date: Mon, 4 Aug 2003 21:42:43 -0400 Reply-To: "Arnie Gundersen" <arniegundersenesailchamplain.net>

From: "Arnie Gundersen" <amiegundersen(sailchamplain.net>

To: "David Lochbaum" <dlochbaum~ucsusa.org>, "Raymond Shadis" <shadis~ime.net>

Subject:

Cold, hard facts Stone and Webster has made non-conservative assumptions in developing the transit time for the steam from the reactor to the steam turbine. In the July 31, 2003 transmittal, witness George Thomas states that calculation CYC -2298 was the basis for the new turbine "shine" dose which was first provided to the commission on XXXXXX. These S&W calculations were completed on June 6, 2003. It is surprising that this data was calculated after ENVY provided supposed calculated dose values as part of these proceedings. The S&W calculations were based on an earlier calculation (Hansen to Strum 4/9/85). In the earlier calculations, a transit time of 3.6 seconds was determined, and there was considerable uncertainty even in that value.

In 1985, Hansen stated "As can be seen from the above, there are not enough hard cold facts to base a calculation on." Despite the fact that Hansen calculated 3.6 seconds, on page 16 of the recent S&W report, S&W used this report which lacked "..cold, hard facts.." and then arbitrarily INCREASED the pre-EPU transit time to 4 seconds. This is not conservative for two reasons.

First, the longer the transit time the more N 16 will decay before reaching relatively unshielded areas in the turbine hall which decreases the calculated exposure. Second, the 1985 value was not based on "..hard, cold facts...". This indicates a gross breakdown in the ENVY quality assurance system as well as a dose to the public which is not conservatively calculated.

NEC1SD# 20

Date: Tue, 5 Aug 2003 23:12:18 -0400 Reply-To: "Arnie Gundersen" <arniegundersengsailchamplain.net>

From: "Arnie Gundersen" <arniegundersen~sailchamplain.net>

To: "Raymond Shadis" <shadis(ime.net>

Subject:

Goodnight Rebuttal Outline VY Physical deterioration of plant will adversely effect reliability From the Entergy Nuclear Vermont Yankee Business Plan 2003 (April 2003, rev 1): "Lower costs translate into higher profits. With clear corporate and market expectations of ENN's contributions to earnings, a concentrated focus on lowering costs is required. Nuclear plants must have a low-cost position to remain competitive in an increasingly unregulated northeast market for electricity."

1. Feedwater pipe wear...Accelerated Corrosion Inspection Program, 1999 refueling outage inspection report, Feb 2000 On the method used, VY states "The wear rate calculations and projected times to code minimum are assumed to be linear. In fact they may not be..." (page 5). Page 8 continues

'Feedwater piping from the feed pumps past the feed regulator valves...this section of the feedwater system has the highest ..operating pressure...there may be a small margin for wall loss due to flow accelerated corrosion. In addition to the limited margin, areas at counterbores for specific welds were originally fabricated with thicknesses close to code minimum wall thickness.

Increased FAC wear rates are are expected in the feedwater system and portions of the Heater Drain system." Page 9 states" the main area of concern is the feedwater system piping from the feed pumps past the feed regulator valves. Due to the design pressures and the installed wall thickness, this portion of the feedwater system has a relatively low margin for wall loss due to flow accelerated corrosion." NOTE: This is at present power not upgrade power.

It is important to note that this sampling program is only a statistical sampling which means that problems can still exits elsewhere. Page 9 states "Also, provision for procuring piping and fittings for replacement of selected components on short notice should be established". NOTE This indicates that the authors acknowledge how likely the is that a failure in this piping could occur. Page 10 expands on this argument by stating "The potential for finding significant wear in any piping component exists. Contingency planning as required for either repair or replacement of large bore components in the feedwater system should be considered." Page 10 also acknowledges that only a "...relatively small number of components inspected each outage."

In the 2002 Refueling Outage Report on Flow Accelerated Corrosion, page 9 states "..with future operation under GE hydrogen water chemistry, wear rates in the feedwater system and heater drain system are expected to increase. The feedwater system piping from the feed pumps NECISD# 21

past the regulator valves has a relatively low margin for wall loss due to flow accelerated corrosion."

Page 10 acknowledges that things will get worse with the proposed upgrade. "The planned power upgrade project underway at VY will require a complete review of program evaluations, piping modeling, and procedures to account for changes in equipment and flow regimes in plant piping systems. The review should be performed prior to the next refueling outage..."This recommendation was made in January of 2003, however no additional information regurding this program was provided in discovery seven months later.

In an email from Enrico Betti to Craig Nelson 4/16/03, Betti states "What this says to me is that the feedwater system has little or no reserve margin..."

Despite all these indications that the system is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, page 2, Mr. Thayer ststes that "..plant modifications that are necessary to achieve the power upgrade have been firmly established for months." And is attachment EN-JKT-10 to the same testimony entitled Vermont Yankee Power Upgrade Project Description a list of components planned to be changed is provided. There are no listings for the feedwater system. Based on this description, VY has no intention of making any improvements to the feedwater system.

2. Condenser tube Wear>

According to page 1 of the Vermont Yankee Nuclear Plant Condenser Evaluation, dated November 1999, but signed by Carl Kuester on March 9, 2000, VY planned that the condenser would last 12 more years, but only if power increased by a 5% or less and modifications were made. The Kuester study concluded that if all his recommendations were implemented (including $ 85,000 upgraded inspections of tubes each refueling outage, epoxy coating of tube inlets and outlets for $ 285,000). On page 26, Kuester concludes "If programs are formulated and acted upon, this condenser should be in satisfactory service in 2012 baring any unusual accident or occurance not yet seen." ENVY provided no documentation that I am aware of to show that Kuester's recommendations were acted upon.

Had Kuester's recommended for epoxy coating of the tube inlet been implemented , this would reduce erosion. However, two years later in a 11/28/01 report to Marstaller from Zalewski .

section 1.1 notes that "Inlet end erosion is also present....While wall losses are not so severe to present an immediate hazard, the corrosion continues to grow." According to section 2.9 of this report, "The random stress cracking may be limiting factor in the remaining useful life of the brass condenser tubes." It also states that "The corrodent necessary to propagate these cracks has not been identified. Identifying and removing the corrodent is likelt to be the only way to interrupt the progression of the stress cracking..."

In a 2/7/02 memo from Betti to "File UND2002-042 07", entitled Condenser Long Term Plan, Betti states "VY has been fortunate to have our condenser tubes last 30 years." He also states "The current erosion inspection sample is too small." ( This was Kuester's recommendation 3 NEC1SD# 22

years earlier). Both Betti and Kuester identify that it is important to note that any inspection program is only a statistical sampling which means that problems can still exits elsewhere. Also three years after Kuester recommended epoxy coating, Betti states, "One preemptive measure to prervent continued tube end and tube sheet erosion would be epoxy coating...." He goes on to state "The coating... .are better done soon before leaks occure." Betti then states "It is unlikely even with preemptive repairs the current tubes could be maintained long beyond 2012. Retubing as early as possible would reduce the risk of condenser leaks." Finally, if Figures 3 and 4 in Betti's Condenser Long Term Plan are any indication, VY has not accounted for power uprate.

The projections of wear rates are linear, even after the proposed extended power uprate happens.

Even as of October 2002, ENVY was still contemplating Kuester's recommendation from 1999.

Specifically, the "Record of the nineteenth Eddy Current Inspection, signed by Zalewski recommends epoxy coating the tube sheets and inlet tubes and increasing the inspection sample.

ENVY provided nothing during discovery which indicated that that any of these important recommendations which they have know about for four years have been acted upon.

Despite all these indications that the system is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, page 2 Mr. Thayer ststes that "..plant modifications that are necessary to achieve the power upgrade have been firmly established for months." And in attachment EN-JKT-10 to the same testimony entitled Vermont Yankee Power Upgrade Project Description a list of components planned to be changed is provided. There are no listings for the condenser system. Based on this description, VY has no intention of making any improvements to the conderser system.

3. Because the cooling towers are under sized for 120% power, the condenser backpressure will fluctuate as it has not in the past. This will be especially true in summer months when no heat can be dumped to the Connecticut River and all Cooling Tower cells are operating. This fluctuating pressure will increase the high cycle fatigue on the conderser tube sheet which is already damaged. From "Technical Evaluation No. TE 2001-047" approved by E Betti on 6/22/01 ,"The original Westinghouse condenser bracing system had deficiencies that (following 23 years of operation) contributed to a 6 foot crack in the A condenser.....Additional large cracks were found and repaired in the following refuel outage in the same location in the B condenser (1995)." The report goes on to say, "It should be noted that the original condenser welds were very poor ....... These welds from the standpoint of ultimate strength under primary load standpoint can ... support gravity and pressure loads from service conditions.....secondary loads are important from the standpoint of fatigue failure. Fortunately VY is a base load plant, and the pressurization cycles for the condenser will not likely exceed 200 cycles through the end of license." When this report was written, this may have been true, but the 120% upgrade introduces fatigue cycles which the author had not anticipated.

Despite all these indications that the system is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, page 2, Mr. Thayer states that "..plant modifications that are necessary to achieve the power upgrade have been firmly established for months." And in attachment EN-JKT-1 0 to the same testimony entitled Vermont Yankee Power Upgrade Project NEC1SDM 23

Description a list of components planned to be changed is provided. There are no listings for the condenser tube sheet. Based on this description, VY has no intention of making any improvements to the condenser tube sheet.

4. Quad Cities steam dryer failure is "age related". Nothing was provided to indicate that any lesions learned from Quad have been factored into the VY design Despite all these indications that the system is marginal even at VY's current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayer's Prefiled Rebuttal Testimony, dated July 2, 2003, attachment EN-JKT-10 is entitled Vermont Yankee Power Upgrade Project Description. Based on this description, VY has no intention of making any improvements to the steam dryer system.
5. VY already has cracks in its steam dryer and surrounding area.

A. The 215 Dryer support bracket has had cracks since 1983 (Report of In-Vessel examination, March April 1995).

B. In 1999 three new cracks were identified in three of the Steam Dryer Jacking Bolts (144,215, and 324). (Vermont Yankee RFO 21,). Despite our discovery request ,ENVY failed to provide section 2.4 of this report which discusses the magnitude of these cracks.

C. In the 2002 RFO 23 In-vessel Services Final Report, new debris was located on the 180 end of the Dryer Cover Plate. Despite our discovery request, ENVY failed to provide tab 9 of this report which discusses the magnitude of this debris.

Because ENVY failed to provide key pieces of information, I am forced to conclude that the trens is that failures in this area are continuing to grow.

There are weaknesses in the design basis documents

1. VY apparently did not know their plant had a 40 year life, as they asked why I stated a 40 year life in their discovery of me. They initially refused to provide us documents to prove our claim, then provided the documents with 146 key pages 'accidentally missing". It was only after a detailed page count that we were able to identify the pages which would support our 40 year claim. The document VYC-378 supposedly contains 155 pages....even after we requested a full copy we only got 131 pages plus a 6 pages cover memo.. Page I of 6 of VYC- 378 states "This document contains 155 pages" but only 131 (plus 6) follow, or 137 pages. Where are the missing 18 pages? Are VY's files in such awful shape that they have lost this KEY documentation? I conclude that pieces of this KEY design basis document is missing, which shows a clear weakness in the design basis for the plant.

In a 131 page appendix to document VYC 378, dated December 14, 1987 and signed by Jay Thayer, on page 23 of 131, E. J. Betti states "..the reactor vessel was designed for the major transients that could occur during the plant 40 year life." NOTE, the text say PLANT lifetime, not reactor lifetime. Page 32 of 131 appears to be from the VY FSAR, and it states ""The reactor vessel is designed for a 40 year life..."." Page 43 of 131 also states ""The reactor vessel NEC1SDH 24

is designed for a 40 year life..." Page 69 of 131 also states ""...extrapolate to a 40 year life."

This same page also states "They values shown for VY are projected annual frequency averaged over a 40 year plant lifetime." NOTE, the text say PLANT lifetime, not reactor lifetime. It is clear that VY had no knowledge of their FSAR or their design basis, which implies the need for a vertical slice of the plant's systems.

2. VY promised to inspect RR-44 hanger in their August 2001 ISI Summary Report to the NRC (BVY 01-66) Page 19 states that problems with hanger RR-44 will be "revisited" during the next refueling outage.. .HOWEVER, in the January 9 2003 1SI Summary Report to the NRC for the next refueling outage(BVY 03-02), there is no reference that this hanger was ever reinspected. This is an indication that the commitment follow system does not work.
3. VY did not use the correct design basis when evaluating the control room habitability after an accident. They used 80 degrees when their design basis calls for 85 degrees....If they had used the correct numbers, they would have had to declare the system inoperable.....200 times in last 4 years the river temperature has exceeded 80 degrees
4. The PRA numbers for VY are way out of line with other reactors
5. We need to get the statement in here about venting when the wind is blowing toward Canada to show lack of safety ethic
6. In a private phone call to NRC (Telecon 1/8/03 9-10 AM) the NRC told Entergy that the GE Constant Power Upgrade Licensing Topical Report (CLTR) was "ambiguous" because GE had provided "a piece-meal safety analysis" and that there was "insuffiecient analysis information on which to judge a decision on public safety". The NRC told Entergy that when they talk to GE "Everytime we talk, the ambiguity gets larger". The NRC also told Entergy that GE "...assumes the staff can reach conclusions on public safety without having adequate analysis on how the plant will operate in the future." The NRC also told Entergy that GE had not "..integrated fuel, accidents, and transient analysis...", and that nothing was analysed in the CLRT unless the fuel was provided by GE. The NRC also told Entergy that "GE wants to carve everything into little pieces that are not analysied in an integrate fashion" The NRC told Entergy that GE was trying to get licensed power upgrades " ON THE CHEAP".

In a "Private and Confidential" memo date 12/18/02 Entergy's Don Leach told Entergy staffers that he had spoken to Jim Klaproth of GE. The memo says that Klaproth of GE was meeting with the NRC Chairman and commissioners on 1/22/03, and that if the NRC had not approved the GE report, Klaproth was "..going for the jugular" I conclude that General Electric is using threats to get approval of the CLRT.

There are significant differences between VY and other plants GE has licensed. In an internal memo from Robert Vita to VY staff on 12/19/02, Vita states, "Again, it appears that VY is not a "normal" plant when trying to bound us generically with other BWR-4s." There is no suggestion why Vita stated "AGAIN", but there must be many instances where VY does not fit the analysis that GE is trying to get the NRC to approve. In this memo, VY has discovered that its nuclear reactor has exceeded its ultimate design pressure under certain accidents at the 120%

NECISD 25

power level. Vita states that compared to other BWR-4, VY has low steam capacity and a different safety relief valve arrangement. Vita then states, "I am concerned that we are seeing VY challenge generic analysis previously performed by GE... . am not sure that the statements, engineering judgement or bounded by previous plant experience (sic), is acceptable for VY."

Shine dose We need to look at the dose conversion factor Stone and Webster has made non-conservative assumptions in developing the transit time for the steam from the reactor to the steam turbine. In the July 31, 2003 transmittal, witness George Thomas states that calculation CYC -2298 was the basis for the new turbine "shine" dose which was first provided to the commission on XXXXXXX. These calculations were completed on June 6, 2003. It is surprising that this data was calculated after ENVY provided supposed calculated dose values as part of these proceedings. The S&W calculations were based on an earlier calculation (Hansen to Strum 4/9/85). In the earlier calculations, a transit time of 3.6 seconds was determined, and there was considerable uncertainty even in that value. In 1985, Hansen stated "As can be seen from the above, there are not enough hard cold facts to base a calculation on." Despite the fact that Hansen calculated 3.6 seconds, on page 16 of the recent S&W report, S&W arbitrarily INCREASES the pre-EPU transit time to 4 seconds. This is not conservative for two reasons. First, the longer the transit time the more N 16 will decay before reaching relatively unshielded areas in the turbine hall which decreases the calculated exposure.

Second, the 1985 value was not based on "..hard, cold facts...". This indicates a gross breakdown in the ENVY quality assurance system as well as a dose to the public which is not conservatively calculated.

I've not seen either calculation, but it sounds like they determine the shine dose based on N-16. Is the reactor assumed to be operating at, or close to, the technical specification limit on reactivity levels in the primary coolant? While this contribution is secondary to the N-16 contribution, it is not zero and would be non-conservative if ignored. Or, put another way, Vermont Yankee would be operating outside its design and licensing basis if it operated with fuel leakers when its safety studies assumed otherwise.

Cooling towers Stone & Webster Evaporation Loss Study, Exhibit DEY-3, pages 4 & 7, Drift 183 gpm total, based upon 0.05% of total circulating water flow of 366,000gpm:

1) 183 gallons per minute x 60 = 10,980 gallons/hr.
2) 10,980 gallons per hour x 24 = 263,520 gallons/day.
3) 263,520 gallons per day/55 gallon drum = 4,791 drums/day. ("...nearly five thousand 55-gallon drums of water per day. Five thousand.")

There is no way that 125 HP fans will cause a plume to be only 20 % bigger than now, which means waste heat will be dumped to the river... .salmon issues and control room habitability issues... .The river already hit 84.7 degrees, with this increased load, it will exceed its design basis NEC1SD# 26

Control room habitability Licensing basis The river already hit 84.7 degrees, with this increased load, it will exceed its design basis Reliability Availability is defined in the NRC's gray book (NUREG-0020) as number of hours the reactor was critical divided by the number of hours in the period. If the availability is reduced by 2%, it means the reactor is not critical more. If the reactor is available 90% of the time, it is critical 328.5 days out of a 365 day period. If the reactor is available 2% less (88%), it is critical 321.2 days out of a 365 day period.

The difference is your 7 days.

According to a Brian Cosgrove telecom dated 4/29/2003, "Vermont ratepayers will have no economic risk" (August 1, 2003 transmittal to Shadis)

NEC1SD# 27

To: Shadis Raymond <shadis(ime.net>, Blanch Paul <pmblanch(attbi.com>,

Alexander Peter <cristobl(sover.net> From: Arnie Gundersen

<arniegundersen~sailchamplain.net>

X-ASG-Orig-Subj: NRC ideas

Subject:

NRC ideas Date: Wed, 18 Aug 2004 11:25:38 -0400 NEC1SD# 28

Date: Mon, 23 Aug 2004 20:22:23 -0400 To: Shadis Raymond <shadisgime.net>

From: Arnie Gundersen <arniegundersengadelphia.net>

X-ASG-Orig-Subj: Fwd: Condenser problems

Subject:

Fwd: Condenser problems Begin forwarded message:

From: Arnie Gundersen <arniegundersen~adelphia.net>

Date: August 16,2004 5:51:51 PM EDT To: Shadis Raymond <shadis~ime.net>, Alexander Peter <cristobl(sover.net>

Cc: Lochbaum David <dlochbaum~ucsusa.org>, Blanch Paul <pmblanch~attbi.com>

Subject:

Condenser problems

Ray, This is my prefiled testimony from August (2003) relating to condenser problems at VY. The

[BOLD CAPITAL LETTER AREA] says the condenser is lucky to just withstand gravity.

Remember, condensers are designed to withstand vacuum, not be positively pressurized as assumed in the AST. Given what Betti has to say, I cannot understand how they think the condenser can withstand a positive pressure for the AST portion of the Uprate.... This is a good issue to attack on when pursuing the NRC appeal.

Arnie Q 5 Please give another example of a component likely to have an adverse effect on reliability under extended power uprate conditions.

Response: Another outstanding example of a worn component that is not likely to withstand the stresses of extended power uprate through end of license in 2012 is the steam condenser.

According to page I of the Vermont Yankee Nuclear Plant Condenser Evaluation, dated November 1999, but signed by Carl Kuester on March 9, 2000, VY planned that the condenser would last 12 more years, but only if power increased by a 5% or less and modifications (beyond the presently planned, tube staking) were made. The Kuester study concluded that if all his recommendations were implemented (including upgraded inspections of tubes each refueling outage, epoxy coating of tube inlets and outlets for $ 285,000, and tube staking). On page 26, Kuester concludes If programs are formulated and acted upon, this condenser should be in satisfactory service in 2012 baring any unusual accident or occurrence not yet seen.

ENVY provided no documentation that I am aware of to show that Kuesters recommendations were acted upon.

Had Kuesters recommended for epoxy coating of the tube inlet been implemented, this would reduce erosion. However, two years later in a 11/28/01 report to Marstaller from Zalewski, section 1.1 notes that Inlet end erosion is also present.While wall losses are not so severe to present an immediate hazard, the corrosion continues to grow. According to section 2.9 of this report, The random stress cracking may be limiting factor in the remaining useful life of the brass condenser tubes. It also states that The corrodent necessary to propagate these cracks has not been identified. Identifying and removing the corrodent is likely to be the only way to interrupt the progression of the stress cracking NEC1SDH 29

In a 2/7/02 memo from Betti to File UND2002-042 07, entitled Condenser Long Term Plan, Betti states VY has been fortunate to have our condenser tubes last 30 years. He also states The current erosion inspection sample is too small. (This was Kuesters recommendation 3 years earlier).

Both Betti and Kuester identify that it is important to note that any inspection program is only a statistical sampling which means that problems can still exits elsewhere. Also three years after Kuester recommended epoxy coating, Betti states, One preemptive measure to prevent continued tube end and tube sheet erosion would be epoxy coating. He goes on to state The coating(is) better done soon before leaks occur.

Betti then states, It is unlikely even with preemptive repairs the current tubes could be maintained long beyond 2012. Retubing as early as possible would reduce the risk of condenser leaks.

Also, if Figures 3 and 4 in Bettis Condenser Long Term Plan are any indication, VY has not accounted for power uprate. The projections of wear rates are linear, even after the proposed extended power uprate happens.

Even as of October 2002, ENVY was still contemplating Kuesters recommendation from 1999.

Specifically, the Record of the Nineteenth Eddy Current Inspection, signed by Zalewski, recommends epoxy coating the tube sheets and inlet tubes and increasing the inspection sample.

ENVY provided nothing during discovery that indicated that that any of these important recommendations, which they have known about for four years, have been acted upon.

Despite all these indications that the system was marginal even at VYs current power level, VY only plans to improve the system by staking the tubes as a result of the power upgrade.

Specifically Project Definition Document VMY 2003-012 dated April 15, 2003 (Attachment to DPS-1-1 5-b) states The SWEC EPU Feasibility Study concludes that the main condenser tubes require staking to eliminate the susceptibility to vibration wear In fact the evidence is clear that ENVY has known for four year that it has needed to stake the tubes in order to have the condenser last until 2012 under existing conditions.

Staking was required in 1999 and is still required because the tubes are thinning from both the waterside and the steam side from erosion. As tubes get much thinner than their original condition, because they are no longer rigid, they begin to flutter in the stream of condenser flow; much like a blade of grass held between fingers as you blow across it. Metal fatigue, cracking, and failure result. Staking was required to eliminate only this one part of the condensers problems in 1999 and ENVY is just recognizing it four years later.

Because the cooling towers are under sized for 120% power, the condenser backpressure will fluctuate, as it has not in the past. This will be especially true in summer months when no heat can be dumped to the Connecticut River and all Cooling Tower cells are operating. This fluctuating pressure will increase the high cycle fatigue on the condenser tube sheet, which is already damaged.

NECISD# 30

TECHNICAL EVALUATION NO. TE 2001-047, APPROVED BY E BETTI ON 6/22/01, REVEALS THAT THE ORIGINAL WESTINGHOUSE CONDENSER BRACING SYSTEM HAD DEFICIENCIES THAT (FOLLOWING 23 YEARS OF OPERATION)

CONTRIBUTED TO A 6 FOOT CRACK IN THE A CONDENSER...ADDITIONAL LARGE CRACKS WERE FOUND AND REPAIRED IN THE FOLLOWING REFUEL OUTAGE IN THE SAME LOCATION IN THE B CONDENSER (1995).

THE REPORT GOES ON TO SAY, IT SHOULD BE NOTED THAT THE ORIGINAL CONDENSER WELDS WERE VERY POOR AND THESE WELDS FROM THE STANDPOINT OF ULTIMATE STRENGTH UNDER PRIMARY LOAD STANDPOINT CANSUPPORT GRAVITY AND PRESSURE LOADS FROM SERVICE CONDITIONSSECONDARY LOADS ARE IMPORTANT FROM THE STANDPOINT OF FATIGUE FAILURE. FORTUNATELY VY IS A BASE LOAD PLANT, AND THE PRESSURIZATION CYCLES FOR THE CONDENSER WILL NOT LIKELY EXCEED 200 CYCLES THROUGH THE END OF LICENSE. WHEN THIS REPORT WAS WRITTEN, THIS MAY HAVE BEEN TRUE, BUT THE 120% UPGRADE INTRODUCES FATIGUE CYCLES, WHICH THE AUTHOR HAD NOT ANTICIPATED.

Despite all these indications that the system is marginal even at VYs current power level, VY has chosen not to improve the system in any way. Specifically, in Jay Thayers Prefiled Rebuttal Testimony, dated July 2, 2003, page 2, Mr. Thayer states that plant modifications that are necessary to achieve the power upgrade have been firmly established for months. And in attachment EN-JKT- 10 to the same testimony entitled Vermont Yankee Power Upgrade Project Description, a list of components Entergy is planning to replace or modify is provided. There are no listings for the condenser tube sheet. Based on this description, VY has no intention of making any improvements to the condenser tube sheet.

NEC1SD# 31

To: Shadis Raymond <shadisgime.net>

From: Arnie Gundersen <arniegundersen~adelphia.net>

X-ASG-Orig-Subj: seismic/ missing records

Subject:

seismic/ missing records Date: Mon, 23 Aug 2004 21:20:08 -0400 Begin forwarded message:

Date: July 8, 2004 6:08:53 AM EDT To: "Rick Ennis" <RXE~nrc.gov>

Cc: Paul Blanch <pmblanch~comcast.net>, Shadis Raymond <shadiseime.net>, Anthony McMurtray <ACM2@nrc.gov>, Allen Howe <AGHI nrc.gov>, Brian Holian

<BEH~nrc.gov>, Cornelius Holden <CFH~nrc.gov>, Cliff Anderson <CJA(0nrc.gov>, David Pelton <DLPlInrc.gov>, Donna Skay <DMS6@nrc.gov>, Tad Marsh <LBM~nrc.gov>, Stuart Richards <SAR@nrc.gov>, William Ruland <WHR@nrc.gov>, Lochbaum David

<dlochbaumgucsusa.org>

From: Arnie Gundersen <arniegundersen(sailchamplain.net>

Subject:

Noncompliance with NRC Regulation at VY Please treat this as a formal allegation of a potentially safety significant problem at VY I have recently received documents from VY in my role as an expert witness, which indicate that they have knowingly operated with a safety system in an unanalyzed condition for the last 18 years. Specifically the safety related seismic cooling tower had its fill replaced in the mid 1980's but that modification was never analyzed to determine if it effected the seismic qualification of the tower. This is and has been known to VY. I have an undated TPI document which I will be giving to Jay Thayerin the hearings today which states "THERE HAS NOT BEEN ANY ANALYSIS OF THE CLASS II STRUCTURE TO ACCOUNT FOR THE ADDITIONAL FILL THAT WAS ADDED IN THE MID 1980'S" Furthermore In my review of VY records in support of NEC in the Uprate Hearings, I have discovered a disturbing trend in the area of RECORDS RETENTION for safety related items.

The newly provided ENVY material confirms that previously identified trend.

A. The original seismic analysis of the safety related cooling tower was done by Fluor before the plant was built. An undated attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT00205 and 206), "There is no documentation of the calculation of the loads used for the analysis or a comparison of the calculated loads to allowable loads."

B. MR 83-2055 modified the Cooling towers in 1983. An attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT00206), "I am not able to locate any analysis associated with these modifications to determine what force would cause the ties to break."

C. MR 8-0635 and 0636 again modified the cooling towers in 1985. An attachment to an email from Dan Yasi dated 12/6/02 states (Bates CT 00206), "Again, I was not able to locate any analysis associated with these modifications."

NEC1SD# 32

In prior testimony, I noted documentation and record retention problems associated with the 1986 CB&I report on the 40 year design life of the plant.

Since testifying, of course there has been the missing fuel rod documentation problem (1979

+) as well as 20 undocumented cracks in the steam dryer, which VY has stated may have been there since the plant was built.

The common thread for all these documentation issues is that all of them occurred a long time ago. If the original design basis of the plant cannot be found, it is difficult to predict the future performance of said plant. In October 1996, the NRC sent VYNPC a letter requiring a response in accordance with 10 CFR 50.54(f) regarding the adequacy and availability of design basis information. One wonders how VY's licensee could have told NRC then that it had design basis information under control and tell the Board and intervenors now that some information is unavailable.

NEC1SD# 33

To: Shadis Raymond <shadiseime.net>

From: Arnie Gundersen <arniegundersen(adelphia.net>

X-ASG-Orig-Subj: this is only a test!!!!

Subject:

this is only a test!!!!

Date: Mon, 23 Aug 2004 21:20:52 -0400 Begin forwarded message:

Date: July 9, 2004 8:55:07 AM EDT From: "Dave Lochbaum" <dlochbaumgucsusa.org>

To: "Dave Lochbaum" <dlochbaum~ucsusa.org>

Cc: <JIZ~nrc.gov>, <NAS~nrc.gov>, <opa3(nrc.gov>, <RXE~nrc.gov>, <SRB3(nrc.gov>

Subject:

The BWR Experimental Power Uprates Beginning in 2001, the NRC allowed boiling water reactors to operate at up to 20 percent higher than their originally licensed power levels.

As indicated in the attached issue brief, the Experimental Power Uprates (EPUs) haven't been successful. Exelon reports damage caused by "lack of knowledge" and the NRC cites "questionable analyses."

The Experiment continues, courtesy of NRC.

Dave Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW Suite 600 Washington, DC 20006-3962 (202) 223-6133 x1 13 (202) 223-6162 fax

[ATTACHMENT: See PDF - Attach Gundersen to Shadis 08-23-04 I NEC1SDHI 34

To: Shadis Raymond <shadis~ime.net>

From: Arnie Gundersen <arniegunderseneadelphia.net>

X-ASG-Orig-Subj: Fwd: cooling towers

Subject:

Fwd: cooling towers Date: Mon, 23 Aug 2004 21:22:20 -0400 ATTACHMENT:

Arnie Gundersen 139 Killarney Drive, Burlington, VT 05401 Telephone: 802-865-9955 Fax: 802-865-9933 Email: amiegundersenesailchamplain.net My assessment of the stress load on the Vermont Yankee Cooling Towers is based upon the pertinent information I reviewed in New England Coalition's files and my expertise in cooling towers, including a master's thesis.

To begin, the end wall of the first picture (Picture XXX, YYY station) indicates the right side of the tower has a natural break about 1/3 of the way up -- where the tower structure rises vertically from the ground and then breaks at an angle to the upper right. This is referred to as the Econdyne "wounded-knee" design because it introduces severe weakness in the tower structure.

Ecodyne built their earlier towers like this to squeeze a wider structure into a narrower concrete basin. Ecodyne retrofitted their towers with what was known as an "E-fix" for structural improvement after the initial design started to fail. At least two E-fix towers failed after receiving the E-fix, those at TXU's Permian Basin Plant and at Exxon-Mobil's Joliet Refinery.

Vermont Yankee also has the E-fix cooling towers.

In the second picture, these towers (picture XXX, ZZZ Station) operated with only 137 horsepower (HP) and 28' diameter fans when they collapsed. As I stated in my testimony earlier last year [cite date & transcript #], increasing HP from 125 to 200 will increase the dynamic loads at Vermont Yankee, as well as static and velocity pressure loads, and will further over-stress an under-designed and aged frame.

If one looks carefully at the third picture ( picture XXXXX QQQQ station) one will see the crane at the far end of the tower. This tower failed because one of the fan blades flew off the tower, causing a large asymmetric dynamic load to bring the tower down. To the best of my knowledge, fan failures have not caused structural collapses in towers manufactured by other corporations instead of Ecodyne.

Based upon my review of the discovery material, the history of Ecodyne "wounded knee" designs, and the failure of Ecodyne cells due to the imbalance of a single fan, it is my opinion that there may be unintended consequences to an asymmetrical loading of the entire structure when one fan has a different horsepower rating than the others in the same series of cells.

Therefore, I remain concerned that the reliability of the existing towers will be significantly compromised by the modifications that have been proposed for Vermont Yankee's cooling towers. In my opinion, the board should require structural certification by an Independent NECISD# 35

Professional Engineer of Vermont Yankee's towers to assure that Ecodyne's "wounded knee" design will withstand the additional horsepower increase in the fans and the asymmetrical load cause by the one dissimilar fan.

It was Entergy who initially proposed the 200 Horsepower fans on all tower cells without exception. Since the cooling tower design was part of Entergy's original application, I fail to understand their inability to comply with the Board's order. In my opinion the alternative design asked for by Entergy is simply a cost-cutting measure, and may, in my opinion, reduce cooling tower integrity and therefore the overall reliability of the plant.

NEC1SDH 36

Date: Mon, 23 Aug 2004 21:41:00 -0400 To: Shadis Raymond <shadis(ime.net>

From: Arnie Gundersen <arniegundersen~adelphia.net>

X-ASG-Orig-Subj: msiv

Subject:

msiv Begin forwarded message:

From: "Paul Blanch" <pmblanch~comcast.net>

Date: April 14, 2004 9:56:24 PM EDT To: <vob~nrc.gov>

Subject:

NRC questions to Duane Arnold Section 10.4, of your submittal, NEDC-32980P, stated that DAEC does not intend to perform tests involving automatic scram from high power, because Duane Arnold's operating history, the transient analysis performed at uprated condition and comparable uprate test performed at other stations such as Hatch, all demonstrate the unit can withstand these test. You pointed out that high power test will subject the unit to unnecessary plant transients. You added that as Duane Arnold experiences a Main Steam Isolation Valve closure of Generator Load reject at the uprates RTP, you will analyze the data available and confirm that the unit responded as expected. You concluded that you have verified that the data to assess the plants response to the transient.

The NRC-approved ELTR-1 requires the MSIVC test to be performed if the power uprate is more than 10% above previously recorded MSIV closure transient data. The topical report also requires the GLR test to be performed if the uprate is more than 15%of previously recorded transient data.

Please provide further clarifications, information and answers to the following questions 5)

You cited uprated test performed at Hatch as an example of industry experience that indicate Duane Arnold could also withstand isolation transients form high power. For the Hatch Unit 1 and 2 uprate test, compare the units actual response with the applicable transient analyses. Discuss how this industry experience demonstrates that Duane Arnold power uprate, the cycle-specific limiting transient analysis would provide equivalent protection compared to startup test.

10.04 NEC1SDH 37

Date: Mon, 23 Aug 2004 21:41:36 -040 To: Shadis Raymond <shadiseime.net>

From: Arnie Gundersen <amiegundersen~adelphia.net>

Subject:

Fwd: JUSTIFICATION FOR EXCEPTION TO LARGE TRANSIENT TESTING Begin forwarded message:

From: "Paul Blanch" <pmblanchgcomcast.net>

Date: April 14, 2004 9:36:01 PM EDT To: <vobenrc.gov>

Subject:

JUSTIFICATION FOR EXCEPTION TO LARGE TRANSIENT TESTING BVY 03-80 / Attachment 7/ Page 1 JUSTIFICATION FOR EXCEPTION TO LARGE TRANSIENT TESTING

Background

The basis for the Constant Pressure Power Uprate (CPPU) request was prepared following the guidelines contained in the NRC approved, General Electric (GE) Company Licensing Topical Report for Constant Pressure Power Uprate (CLTR) Safety Analysis: NEDC-33004P-A Rev. 4, July, 2003. The NRC staff did not accept GEs proposal for the generic elimination of large transient testing (i.e., Main Steam Isolation Valve (1SIV) closure and turbine generator load rejection) presented in NEDC-33004P Rev. 3. Therefore, on a plant specific basis, Vermont Yankee Nuclear Power Station (VYNPS) is taking exception to the large transient tests; MSIV closure and turbine generator load rejection.

The CPPU methodology, maintaining a constant pressure, simplifies the analyses and plant changes required to achieve uprated conditions. Although no plants have implemented an Extended Power Uprate (EPU) using the CLTR, thirteen plants have implemented EPUs without increasing reactor pressure.

1. Hatch Units 1 and 2 (105% to 113% of Original Licensed Thermal Power (OLTP))
2. Monticello (106% OLTP)
3. Muehleberg (i.e., KKM) (105% to 116% OLTP)
4. Leibstadt (i.e., KKL) (105% to 117% OLTP)
5. Duane Arnold (105% to 120% OLTP)

NEC1SD# 38

6. Brunswick Units 1 and 2 (105% to 120% OLTP)
7. Quad Cities Units 1 and 2 (100% to 117% OLTP)
8. Dresden Units 2 and 3 (100% to 117% OLTP)
9. Clinton (100% to 120%)

Data collected from testing responses to unplanned transients for Hatch Units 1 and 2 and KKL plants has shown that plant response has consistently been within expected parameters.

Entergy believes that additional MSIV closure and generator load rejection tests are not necessary. If performed, these tests would not confirm any new or significant aspect of performance that is not routinely demonstrated by component level testing. This is further supported by industry experience which has demonstrated plant performance, as predicted, under EPU conditions. VYNPS has experienced generator load rejections from 100% current licensed thermal power (see VYNPS Licensee Event Reports (LER)91-005, 91-009, and 91-014). No significant anomalies were seen in the plants response to these events. Further testing is not necessary to demonstrate safe operation of the plant at CPPU conditions. A Scram from high power level results in an unnecessary and undesirable transient cycle on the primary system. In addition, the risk posed by intentionally initiating a MSIV closure transient or a generator load rejection, although small, should not be incurred unnecessarily.

NEC1SDII 39

Date: Mon, 23 Aug 2004 21:42:03 -0400 To: Shadis Raymond <shadis~ime.net>

From: Arnie Gundersen <arniegundersen(adelphia.net>

Subject:

Fwd: Letter from VY to NRC September 2003 Begin forwarded message:

From: "Paul Blanch" <pmblanch(comcast.net>

Date: April 14, 2004 9:29:16 PM EDT To: <vobgnrc.gov>

Subject:

Letter from VY to NRC September 2003 BVY 03-10827] / Attachment 1 / Page 2 analyses and evaluations performed specifically for the VYNPS EPU. The PUSAR contains information which GE considers to be proprietary.

GE requests that the proprietary information in this report be withheld from public disclosure in accordance with 10 CFR 9.17(a)(4), 2.790(a)(4), and 2.790(d)(1). An affidavit supporting this request is provided in Attachment 5. The NRC may duplicate this submittal, including the PUSAR, for the purpose of internal review. A non-proprictary version of NEDC-33090 is included as Attachment 6. As part of the power ascension test plan, V1Y is not planning to conduct certain large transient testing which requires an automatic scram from high power (e.g., main steam isolation valve (MISIV) closure). provides justification for not performing this testing.

This request for license amendment, while not being submitted as a risk informed licensing action, as defined by Regulatory Guide 1.1744, was evaluated from a risk perspective. As demonstrated in Section 10.5 of the PUSAR, when the guidelines established in Regulatory Guide 1.174 are applied, the calculated results from the Level 1 and 2 Probabilistic Safety Analyses represent a very small risk increase in core damage frequency (CDF) and small risk increase in large early release frequency (LERF). The best estimate of the risk increase for at-poNwer internal events due to the EPU is a delta CDF of 3.3 E-7/year (i.e., an increase of 4.2% over the base CDF of 7.77 E-6/year. The best estimate for at-powver internal events results in a delta LERF of 1.1 E-7/year (i.e., an increase of 4.9% over the base LERF of NEC1SDH 40

Date: Mon, 23 Aug 2004 21:42:24 -0400 To: Shadis Raymond <shadis~ime.net>

From: Arnie Gundersen <arniegundersengadelphia.net>

Subject:

VY doesn't want to test MSIVs even though GE has a strong recommendation Begin forwarded message:

From: "Paul Blanch" <pmblanch(comcast.net>

Date: April 14, 2004 9:16:50 PM EDT To: "'Veronica 0. Bucci"' <VOB~nrc.gov>

Subject:

VY doesn't want to test MSIVs even though GE has a strong recommendation STP 19 Core Performance Evaluation Yes N/A-Test will be performed for CPPU STP 21 Flux Response to Rods No This test is to demonstrate stability in the power-reactivity feedback loop with increasing reactor power and determine the effect of control rod movement on reactor stability. This initial plant startup test was performed at 17% and 52% CLTP power. Operation at CPPU increases the upper end of the power operating domain. These changes in the higher end do not significantly or directly affect the manner of operating or response of the reactor at these lower power levels.

Therefore, this test is not required.

STP 22 Pressure Regulator Yes N/A-Test will be performed for CPPU.

STP 23 Feedwater System Yes Control system test performed for CPPU-(Notes 6,&7)

STP 24 Bypass Valves Yes N/A- Test will be performed for CPPU STP 25 Main Steam Isolation Valves No See Justification for Exception to Large Transient Testing Requirements, MSIV Closure Testing.

STP 26 Relief Valves No This initial startup test is performed at 25% CLTP...

NECISD# 41

Date: Mon, 30 Aug 2004 06:23:44 -0400 To: Shadis Raymond <shadis(ime.net>

From: Arnie Gundersen <arniegundersen~sailchamplain.net>

Subject:

condenser leakage Begin forvarded message:

From: "Dave Lochbaum" <dlochbaumeucsusa.org>

Date: August 23, 2004 5:32:44 PM EDT To: <shadis(prexar.com>

Cc: <pmblanch~comcast.net>, <arniegundersengsailchamplain.net>

Subject:

Minor mod MM-2003-026, AST Component Mod Hello Pnv:

1 IULZ Dave NEC1SD# 42

Date: Tue, 14 Sep 2004 12:28:02 -0400 To: Raymond Shadis <shadis~prexar.com Cc: Dave Lochbaum <dlochbaum(ucsusa.org>, Paul Blanch <pmblanchgcomcast.net>

From: Arnie Gundersen <arniegundersen(adelphia.net>

Subject:

Re: Fire LER At 10:21 AM 9/13/04, you wrote:

THE FIRE AT VY COULD HAVE BEEN PREVENTED, BUT VY IGNORED INDUSTRY ADVICE FOR 14 YEARS!!!

The following are direct quotes from the VY LER.

"The root causes of the event were determined to be inadequate preventative maintenance for cleaning and inspections during outages and failure to monitor age related degradation.

Additional inspections to evaluate the condition of the bus (including its flexible connectors) would have detected the degraded flexible connectors or the presence of loose/foreign material with the potential to ground the bus.

The need for inspecting the flexible connectors was identified during a recent review of industry operating experience (OE). This OE is being included as recommended preventative maintenance for future outages; however, it was not included in the preventative maintenance inspection performed during RFO-24.

Industry experience has revealed that surge arrestors degrade over time due to a combination of age, service environment and service conditions ...... The "A" surge arrester failure was the result of the combination of a ground occurring on the 'B" iso-phase bus that caused an increase in voltage on the UA' iso-phase bus and not performing preventative maintenance necessary to monitor age related degradation of the "A could have detected degradation and allowed replacement prior to failure.

A contributing cause to both of the conditions previously described was identified by the investigation team as a failure to effectively use industry OE to prevent similar events from occurring at VY. Specifically, it was noted that; the actions taken by VY in response to recommendations provided within the INPO Significant Operating Experience Report (SOER) 90-01 for"Ground Faults on AC Electrical Distribution" were inadequate. In addition to the SOER, guidance provided within EPRI's Isolated Phase Bus Maintenance Guide" TR-1 12784 (1999) for the 22 kV flexible connectors and periodic inspections/testing was not utilized."

_~ The INPO report which VY references but ignored by is 14 Years old! !!!

Yet during the Uprate hearings, Mr. Sherman states, in my experience I have observed that when Vermont Yankee knows about an issue, it manages it in a manner that results in safe and reliable NEC1SD# 43

operation (Sherman, page 19, line 1). How can VY ignore INPO for 14 years and still get rave reviews from the State's Nuclear Engineer?

And Mr. Thayer said ( 186 out of 332: June 16, 2003):

3 THE WITNESS: I guess if you have -- if 4 you look at the regulatory process, and you 5 dissect the regulatory process, and you look 6 at the amount of inspection that occurs on a 7 regular basis, and then you look at the amount 8 of independent inspection that occurs on a 9 regular basis, you look at the history of 10 Vermont Yankee's operation, you look at the 11 Vermont Yankee's regulatory history, you 12 really can be quite satisfied in looking at 13 that record, that there is an ongoing safety 14 assessment of considerable breadth and 15 considerable depth as far as the safe 16 operation of that plant.

Not the State of Vermont, not Entergy, not the NRC, but New England Coalition identified the problem at VY ahead of time.

NEC Uprate testimony: As recounted in my October 2003 testimony on Page 18, line 5-14 Q. (To Mr. Gundersen)- Based on your observations of nationwide experience, should this provide assurance to the board regarding performance of these components and systems under uprate?

A. No. Mr. Thayer claims that the NRC has approved his aging management program for important systems, structures, and components. Adequate aging management means that the condition of equipment is monitored and it is repaired or replaced before it fails. Indian Points broken steam generator tube (2000), Summers leaking hot leg pipe (2000), Oconees broken control rod drive mechanism nozzles (2001), Quad Cities broken jet pump (2002), and Davis-Besses broken reactor vessel head are but a sampling of growing evidence that aging management programs arent working.

NECISD# 44

Date: Mon, 20 Sep 2004 22:01:17 -0400 To: Paul Blanch <pmblanchgcomcast.net>, Peter Alexander

<PeterAlexander~antiochne.edu>, Shadis Raymond <shadis(ime.net Cc: Lochbaum David <dlochbaum~ucsusa.org>

From: Arnie Gundersen <arniegundersen(sailchamplain.net>

Subject:

liar,liar, pants on fire!

NEC1SD# 45

Date: Tue, 21 Sep 2004 20:31:34 -0400 To: "Paul" pmblanch@comcast.net Cc: "'Raymond Shadis"' <shadis~prexar.com>, "'Dave Lochbaum"' <dlochbaumnucsusa.org>

From:Arnie Gundersen amiegundersenesailchamplain.net

Subject:

It's a trap!

Ra v NECISD# 46

Date: Mon, 27 Sep 2004 08:23:48 -0700 (PDT)

From: Arnie Gundersen <arniegundersen(sailchamplain.net>

Reply-To: amiegundersen~sailchamplain.net

Subject:

Fwd: Re: Forced Outages To: 'Raymond Shadis' <shadis~prexar.com>, 'Arnie Gundersen'

<arniegundersen~sailchamplain.net>, 'Shadis Raymond' <shadis(ime.net>, 'Blanch Paul'

<pmblanch~attbi.com>, 'Lochbaum David'<dlochbaum~ucsusa.org>

--- Arnie Gundersen <arniegundersen~sailchamplain.net> wrote:

> Date: Mon, 27 Sep 2004 06:21:46 -0700 (PDT)

> From: Arnie Gundersen <arniegundersengsailchamplain.net>

Subject:

Re: Forced Outages

> To: Raymond Shadis <shadis~prexar.corn>, arniegundersengsailchamplain.net NEC1SD# 47

Date: Sun, 3 Oct 2004 11:04:05 -0400 To: Shadis Raymond <shadisgime.net>

From: Arnie Gundersen <arniegundersenesailchamplain.net>

Subject:

Fwd: idea Begin forwarded message:

From: Arnie Gundersen <arniegundersen~sailchamplain.net>

Date: September 30, 2004 6:38:33 AM EDT To: Shadis Raymond <shadis(ime.net>

Subject:

idea NECISD# 48

Date: Sun, 3 Oct2004 11:08:31 -0400 To: Shadis Raymond <shadis(ime.net>, Blanch Paul <pmblancheattbi.com>,

Lochbaum David dlochbaum~ucsusa.org Cc: Peter Alexander PeterAlexander(antiochne.edu From: Arnie Gundersen <amiegundersen~sailchamplain.net>

Subject:

Forced Outages Begin forwarded message:

Date: September 26, 2004 10:05:43 AM EDT From: Arnie Gundersen <arniegundersen(sailchamplain.net>

To: Shadis Raymond <shadis~ime.net>, Blanch Paul <pmblancheattbi.com>, Lochbaum David <dlochbaumeucsusa.org>

Subject:

Forced Outages When VY blew its recirc pump seals last September, VY said the component had been scheduled to be replaced "... at the next outage.."

When VY had its fire, VY said an inspection of the component had been scheduled "... for the next outage...'

Two forced outages in one year on components which were previously identified as needing attention, but that attention was scheduled "... at the next outage..."

NEC1SD# 49

- X Date: Fri, 8 Oct 2004 06:56:32 -0400 To: Blanch Paul <pmblanchgattbi.com>, Lochbaum David <dlochbaum(ucsusa.org>,

Peter Alexander <PeterAlexandereantiochne.edu>, Shadis Raymond <shadis(ime.net>

From: Arnie Gundersen <amiegundersen~sailchamplain.net>

Subject:

root cause found something NECISD# 50

Date: Sun, 10 Oct 2004 17:45:42 -0400 To: Lochbaum David <dlochbaumgucsusa.org> Cc: Peter Alexander

<PeterAlexander(antiochne.edu>, Blanch Paul <pmblanchgattbi.com>, Shadis Raymond shadisgime.net From: Arnie Gundersen <amiegunderseneadelphia.net>

Subject:

Uprate problems Dave NEC1SD# 51

Date: Mon, 11 Oct 2004 06:39:40 -0400 To: Lochbaum David <dlochbaumgucsusa.org>, Blanch Paul <pmblanch~attbi.com>,

Shadis Raymond <shadis(ime.net>, Peter Alexander <PeterAlexander~antiochne.edu>

From: Arnie Gundersen <arniegundersen~adelphia.net>

Subject:

fire NECISD# 52

Date: Thu, 14 Oct 2004 12:10:36 -0400 To: Arnie Gundersen <arniegundersen(adelphia.net>

From: Raymond Shadis <shadis~prexar.com>

Subject:

Re: should I be there?

NEC1SD# 53

10:14:30 -0400 Date: Sun, 17 Oct 2004 To: Arnie Gundersen <shadis(prexar.com>

From: Raymond Shadis

Subject:

Basis Info Needed Got to Run, Ray NECISD# 54