January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 2
ML050470120
Person / Time
Site: Beaver Valley
Issue date: 02/08/2005
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-05-024
Download: ML050470120 (3)


Text

FENO C

._~

Beaver Valley Power Station P. O.Box4 Shippingport, PA 15077 L-05-024 February 8, 2005 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating R ep ort U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report',.and Unit I and 2 Technical, Specification 6.9.4, the "Monthly Operating Report'" is submitted for Unit 1 and Unit 2 for the month of January, 2005. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System.

No regulatory commitments are contained in this submittal.

Respectfully, W. Pearce Vice-President BVPS DTJ/slp Encli cc:;

Dsures t

-~~ ~~~~

I' NRC.Regional Office King of Prussia, PA-l;o.

'*1**'.

I *

~

1,

frjvf/

OPERATING DATA REPORT DOCKET NO.

UNIT NAME

.DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-334 Beaver Valley 1 Febr-uary 01,2005.

David T. Jones 724-682-4962 January 2005

1.

Design Electrical Rating

2. Maximum Denendable Canacitv IMWe-Netl 835.00 R81.00 This Month Yr-to-Date Cumulative
3.

Number of Hours the Reactor was Critical 744.00 744.00 176,907.14

4. Number of Hours Generator On-line 744.00 744.00 174,361.14
5.

Reserve Shutdown Hours 0.00 0.00 0.00

6.

Net ectrcal Energy Generated (MWHrs) 627,660.00 627,660.00 131,947,579.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments NONE.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 1/24/05 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, the Unit began to reduce thermal power to less than 2652 MWt due to an inoperable Leading Edge Flow Meter (LEFM). A corresponding reduction in electrical output of approximately 8 MWe was achieved at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on 1/24/05. Upon repair and return of the LEFM to operable status, the Unit commenced to return to full electrical and thermal power at 0024 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on 1/28/05. Full power was achieved at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on 1/28/05. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1

I OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-412 Beaver Valle&y2 FebruaryT01, 2 5

David T. Jones 724-682-4962 January 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 836.00 831.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date Cumulative 744.00 744.00 127,136.48 744.00 744.00 126,392.38 0.00 0.00 0.00 627,916.00 627,916.00 99,762,146.00 UNIT SHUTDOWNS No.

Type Method of F: Forced Duration Shutting Date S Scheduled (Hours)

Reason 1 Down 2 Cause & Corrective Action Comments NONE.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.