MONTHYEARML0504200152005-02-15015 February 2005 2/15/05 Palo Verde Nuclear Generating Station, Unit 2 - Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections Project stage: Other 2005-02-15
[Table View] |
|
---|
Category:Letter
MONTHYEARML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24157A3392024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24144A2772024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24089A1892024-03-28028 March 2024 Present Levels of Financial Protection ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML24066A0472024-03-0606 March 2024 Response to Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown and TS IR 05000528/20240122024-03-0404 March 2024 Age-Related Degradation Inspection Report 05000528/2024012, 05000529/2024012 and 05000530/2024012 IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24053A3972024-02-22022 February 2024 License Renewal - Alloy 600 Management Program Plan ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 2024-09-27
[Table view] |
Text
February 15, 2005 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 - RESPONSE TO GENERIC LETTER 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MC4838)
Dear Mr. Overbeck:
On August 30, 2004, the NRC issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the Nuclear Regulatory Commission (NRC) staff to determine whether licensees steam generator (SG) tube inspection programs comply with the existing tube inspection requirements (the plant technical specifications in conjunction with Appendix B to Title 10 of the Code of Federal Regulations Part 50 (10 CFR Part 50, Appendix B)).
By letter dated October 28, 2004, Arizona Public Service Company responded to GL 2004-01 for Palo Verde Nuclear Generating Station (Palo Verde), Unit 2. The staffs review of your response to the GL did not identify any concerns with the inspection practices employed for the Palo Verde Unit 2 SGs, which contain Alloy 690 thermally treated tubing. The staff, therefore, concludes that your SG tube inspection practices related to the generic letter are in compliance with the existing tube inspection requirements. The reviews for Palo Verde Units 1 and 3, which contain Alloy 600 mill annealed tubing, are ongoing with a target date of August 2005.
If you have any questions regarding this matter, please contact me at (301) 415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No.: STN 50-529 cc See next page
Palo Verde Generating Station, Units 1, 2, and 3 cc:
Mr. Steve Olea Arizona Corporation Commission Mr. John Taylor 1200 W. Washington Street Public Service Company of New Mexico Phoenix, AZ 85007 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Douglas Kent Porter Senior Counsel Ms. Cheryl Adams Southern California Edison Company Southern California Edison Company Law Department, Generation Resources 5000 Pacific Coast Hwy Bldg DIN P.O. Box 800 San Clemente, CA 92672 Rosemead, CA 91770 Mr. Robert Henry Senior Resident Inspector Salt River Project U.S. Nuclear Regulatory Commission 6504 East Thomas Road P. O. Box 40 Scottsdale, AZ 85251 Buckeye, AZ 85326 Mr. Jeffrey T. Weikert Regional Administrator, Region IV Assistant General Counsel U.S. Nuclear Regulatory Commission El Paso Electric Company Harris Tower & Pavillion Mail Location 167 611 Ryan Plaza Drive, Suite 400 123 W. Mills Arlington, TX 76011-8064 El Paso, TX 79901 Chairman Mr. John Schumann Maricopa County Board of Supervisors Los Angeles Department of Water & Power 301 W. Jefferson, 10th Floor Southern California Public Power Authority Phoenix, AZ 85003 P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency Brian Almon 4814 South 40 Street Public Utility Commission Phoenix, AZ 85040 William B. Travis Building P. O. Box 13326 Mr. M. Dwayne Carnes, Director 1701 North Congress Avenue Regulatory Affairs/Nuclear Assurance Austin, TX 78701-3326 Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004
February 15, 2005 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 - RESPONSE TO GENERIC LETTER 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MC4838)
Dear Mr. Overbeck:
On August 30, 2004, the NRC issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the Nuclear Regulatory Commission (NRC) staff to determine whether licensees steam generator (SG) tube inspection programs comply with the existing tube inspection requirements (the plant technical specifications in conjunction with Appendix B to Title 10 of the Code of Federal Regulations Part 50 (10 CFR Part 50, Appendix B)).
By letter dated October 28, 2004, Arizona Public Service Company responded to GL 2004-01 for Palo Verde Nuclear Generating Station (Palo Verde), Unit 2. The staffs review of your response to the GL did not identify any concerns with the inspection practices employed for the Palo Verde Unit 2 SGs, which contain Alloy 690 thermally treated tubing. The staff, therefore, concludes that your SG tube inspection practices related to the generic letter are in compliance with the existing tube inspection requirements. The reviews for Palo Verde Units 1 and 3, which contain Alloy 600 mill annealed tubing, are ongoing with a target date of August 2005.
If you have any questions regarding this matter, please contact me at (301) 415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No.: STN 50-529 cc See next page DISTRIBUTION PUBLIC RidsNrrPMMFields RidsNrrDlpmLpdiv2(RGramm)
PDIV-2 r/f RidsNrrLADBaxley RidsNrrDlpmDpr RidsNrrDlpmLpdiv (HBerkow) RidsAcrsAcnwMailCenter TBoyce RidsRgn4MailCenter (SSchwind) RidsOgcRp GHill (6)
PKlein JTerrell MYoder ACCESSION NO: ML050420015 NRR-106 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME MFields:sp DBaxley RGramm DATE OFFICIAL RECORD COPY