Request for Extension of Time to Reply to November 5, 2004, Order Imposing Requirements for Protecting Certain Safeguards Information
ML050280062
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/11/2005
From: Dyer J
Office of Nuclear Reactor Regulation
To: Nunn D
Southern California Edison Co
Tate T, NRR/DLPM, 415-8474
References
EA-04-190
Download: ML050280062 (4)


Text

EA-04-190 April 11, 2005 Mr. Dwight E. Nunn Executive Vice President Southern California Edison Company P.O. Box 128 San Clemente, CA 92674

SUBJECT:

SAN ONOFRE NUCLEAR STATION, UNITS 2 AND 3 - REQUEST FOR EXTENSION OF TIME TO REPLY TO NOVEMBER 5, 2004, ORDER IMPOSING REQUIREMENTS FOR PROTECTING CERTAIN SAFEGUARDS INFORMATION

Dear Mr. Nunn:

By letter dated November 22, 2004, you requested an extension of time to respond to the above referenced Order. You requested the extension until 20 days after receiving clarifications from the U.S. Nuclear Regulatory Commission (NRC) regarding differences between the implementation of the SAFEGUARDS information - MODIFIED HANDLING (SGI-M) requirements provided in the November 5, 2004, Order, and the SAFEGUARDS Information program carried out by your facility for handling SAFEGUARDS information (SGI) pertaining to special nuclear material under the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Part 73.21. In your extension request, you indicated that the SGI-M designated information transmitted with the Order would be managed during the extension period under the provisions of the 10 CFR Part 73 SAFEGUARDS Information program currently being used at your facility.

Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21 may use that program to control SGI-M, as designated by Commission Orders.

The NRC considers that 10 CFR Part 73 SAFEGUARDS Information programs are adequate for protection of SGI-M. As a general matter, an acceptable response to the November 5, 2004, Order, is that the designated SGI-M will be handled under the same provisions as the current 10 CFR Part 73 SAFEGUARDS Information program.

Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21 will find it necessary to ensure that their program adequately addresses the following circumstances associated with SGI-M:

D. E. Nunn 1.

When information is transmitted, whether by letter or electronic means, to a licensee who only has an SGI-M program, the handling provisions described in the November 5, 2004, Order, must be followed to prevent the receiving licensee from potentially violating the provisions of the Order. Specifically, licensees with approved 10 CFR Part 73 SAFEGUARDS Information programs should ensure that the provisions of the November 5, 2004, Order, associated with double wrapping, electronic transfer, portion marking, and top and bottom SGI-M page designations on each page are carried out when information is transmitted to a licensee who has an SGI-M program.

These SGI-M handling provisions need only be applied to SGI-M which is received or generated after the date of the November 5, 2004, Order. It should not be construed that SGI documents administered under the 10 CFR Part 73 SAFEGUARDS Information program are to be retroactively modified to conform to the SGI-M marking designations.

2.

SGI-M may be stored in a key-locked filing cabinet, whereas 10 CFR Part 73 SGI must be stored in an approved security container. Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21, and respond that all SGI-M will be managed under the 10 CFR Part 73 program, could either: (a) store SGI-M in accordance with its SAFEGUARDS Information program under 10 CFR Part 73; or (b) modify their procedures to allow SGI-M storage in a key-locked filing cabinet, in compliance with the November 5, 2004, Order. This modification, if adopted, would help to avoid potential inadvertent violations of the facilitys SAFEGUARDS Information program, if the SGI-M is not stored in a security container approved for SGI.

This letter clarifies the issues you raised, which constituted good cause for an extension, and grants your request for an extension of time to respond to the November 5, 2004, Order, until 20 days from the date of this letter.

Please contact the NRC licensing project manager if you have any questions regarding these clarifications.

Sincerely,

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: See next page

D. E. Nunn 1.

When information is transmitted, whether by letter or electronic means, to a licensee who only has an SGI-M program, the handling provisions described in the November 5, 2004, Order, must be followed to prevent the receiving licensee from potentially violating the provisions of the Order. Specifically, licensees with approved 10 CFR Part 73 SAFEGUARDS Information programs should ensure that the provisions of the November 5, 2004, Order, associated with double wrapping, electronic transfer, portion marking, and top and bottom SGI-M page designations on each page are carried out when information is transmitted to a licensee who has an SGI-M program.

These SGI-M handling provisions need only be applied to SGI-M which is received or generated after the date of the November 5, 2004, Order. It should not be construed that SGI documents administered under the 10 CFR Part 73 SAFEGUARDS Information program are to be retroactively modified to conform to the SGI-M marking designations.

2.

SGI-M may be stored in a key-locked filing cabinet, whereas 10 CFR Part 73 SGI must be stored in an approved security container. Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21, and respond that all SGI-M will be managed under the 10 CFR Part 73 program, could either: (a) store SGI-M in accordance with its SAFEGUARDS Information program under 10 CFR Part 73; or (b) modify their procedures to allow SGI-M storage in a key-locked filing cabinet, in compliance with the November 5, 2004, Order. This modification, if adopted, would help to avoid potential inadvertent violations of the facilitys SAFEGUARDS Information program, if the SGI-M is not stored in a security container approved for SGI.

This letter clarifies the issues you raised, which constituted good cause for an extension, and grants your request for an extension of time to respond to the November 5, 2004, Order, until 20 days from the date of this letter.

Please contact the NRC licensing project manager if you have any questions regarding these clarifications.

Sincerely,

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: See next page DISTRIBUTION:

PUBLIC DNS R/F RZimmerman JDyer AGiantelli RFoster SYoung OGC ACRS PDIV ADAMS Accession No. ML050280062 OFFICE SC:MTWS/DNS PD:NSPPD/DNS OGC D:DNS/NSIR D:NSIR D:NRR NAME MLayton:jph*

MLayton for JWShea JGoldberg DDorman for GTracy RZimmerman JDyer DATE 12/23/04 12/29/04 12/30/04 12/30/04 1/05/05 4/9/05 OFFICE DLPM/PM DLPM/LA DLPM/SC DLPM/PD DLPM/D NAME BPham LFeizollahi RGramm HBerkow LMarsh DATE 3/10/05 3/10/05 3/11/05 3/11/05 4/8/05 OFFICIAL FILE COPY

San Onofre Nuclear Generating Station, Units 2 and 3 cc:

Mr. Daniel P. Breig, Plant Manager Nuclear Generation Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA 92674-0128 Mr. Douglas K. Porter Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Mr. David Spath, Chief Division of Drinking Water and Environmental Management P. O. Box 942732 Sacramento, CA 94234-7320 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Eileen M. Teichert, Esq.

Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Mr. Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA 92504 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Michael Olson San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services Post Office Box 997414 (MS7610)

Sacramento, CA 95899-7414 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission Post Office Box 4329 San Clemente, CA 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 Mr. Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 Mr. Ray Waldo, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128 Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899