Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] |
See also: IR 05000261/2004009
Text
December 13, 2004
Carolina Power & Light Company
ATTN: Mr. John W. Moyer
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
3851 West Entrance Road
Hartsville, SC 29550
SUBJECT: NOTIFICATION OF H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2
SUPPLEMENTAL INSPECTION - NRC INSPECTION REPORT 50-261/2004-
009
Dear Mr. Moyer:
In a telephone conversation between Mr. C. T. Baucom of your staff and me on December 10,
2004, we were informed that the Reactor Coolant System Leakage Performance Indicator (PI)
has crossed the Green/White threshold during the current quarter (4th quarter of calendar year
2004). The reason for this PI becoming White is packing leakage from valve RC-525,
pressurizer spray bypass valve, which exceeded the PI threshold during October 2004. As
such, Robinson will enter the Regulatory Response Column of the NRC Action Matrix in this
quarter.
Based on this transition, Mr. Baucom was informed that we planned to conduct a Supplemental
Inspection of Robinson the week of December 13, 2004. The inspection will be conducted by
Mr. Bob Hagar, the Senior Resident Inspector at Robinson, accompanied by Mr. David Jones,
the Robinson Resident Inspector. Mr. Baucom informed me that there were no scheduling
conflicts or personnel unavailabilties to be resolved in advance of this inspection. In
accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment
Program, the inspection will be conducted using NRC Inspection Procedure 95001, Inspection
For One Or Two White Inputs In A Strategic Performance Area.
Thank you for your cooperation in this matter. If you have any questions regarding the
inspection, please contact Mr. Hagar at (843) 383-4571 or me at (404) 562-4530.
CP&L 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by G. MacDonald for/
Paul Fredrickson
Reactor Projects Branch 4
Division of Reactor Projects
Docket No.: 50-261
License No.: DPR-23
cc w/encl: (See page 3)
CP&L 3
cc w/encl:
William G. Noll Steven R. Carr
Director, Site Operations Associate General Counsel - Legal Dept.
Carolina Power & Light Company Progress Energy Service Company, LLC
H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Electronic Mail Distribution
John H. O'Neill, Jr.
Daniel G. Stoddard Shaw, Pittman, Potts & Trowbridge
Plant General Manager 2300 N. Street, NW
Carolina Power & Light Company Washington, DC 20037-1128
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution Peggy Force
Assistant Attorney General
Chris L. Burton, Manager State of North Carolina
Performance Evaluation and Electronic Mail Distribution
Regulatory Affairs CPB 9
Electronic Mail Distribution Chairman of the North Carolina
Utilities Commission
C. T. Baucom, Supervisor c/o Sam Watson, Staff Attorney
Licensing/Regulatory Programs Electronic Mail Distribution
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant Robert P. Gruber
Electronic Mail Distribution Executive Director
Public Staff - NCUC
J. F. Lucas, Manager 4326 Mail Service Center
Support Services - Nuclear Raleigh, NC 27699-4326
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant Public Service Commission
Electronic Mail Distribution State of South Carolina
P. O. Box 11649
Henry J. Porter, Director Columbia, SC 29211
Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental Distribution w/encl: (See page 4)
Control
Electronic Mail Distribution
R. Mike Gandy
Division of Radioactive Waste Mgmt.
S. C. Department of Health and
Environmental Control
Electronic Mail Distribution
Beverly Hall, Acting Director
Division of Radiation Protection
N. C. Department of Environment,
Health and Natural Resources
Electronic Mail Distribution
CP&L 4
Distribution w/encl:
C. Patel, NRR
RIDSNRRDIPMLIPB
PUBLIC
OFFICE DRP/RII DRP/RII
SIGNATURE GTM GTM for per phone
NAME GMacdonald:as RHagar
DATE 12/13/2004 12/13/2004
E-MAIL COPY? YES NO YES NO
PUBLIC DOCUMENT YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML043490018.wpd