ML043450250

From kanterella
Jump to navigation Jump to search

Technical Specifications, Revised Main Turbine System Requirements Technical Specifications,
ML043450250
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/03/2004
From: Richard Guzman
NRC/NRR/DLPM/LPD1
To:
References
TAC MC1596, TAC MC1597
Download: ML043450250 (4)


Text

PPL Rev. 1 Main Turbine Bypass System 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Main Turbine Bypass System LCO 3.7.6 The Main Turbine Bypass System shall be OPERABLE.

OR Apply the following limits for an inoperable Main Turbine Bypass System as specified in the COLR:

a.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," and

b.

LCO 3.2.3, 'LINEAR HEAT GENERATION RATE (LHGR)."

APPLICABILITY:

THERMAL POWER > 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Main Turbine Bypass System A.1 Satisfy the requirements of the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable.

LCO or restore Main Turbine Bypass System to OPERABLE status.

AND Requirements of LCO 3.2.2 not met.

OR Requirements of LCO 3.2.3 not met.

B. Required Action and B.1 Reduce THERMAL POWER to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion Time

< 25% RTP.

not met.

SUSQUEHANNA - UNIT 1 TS /3.7-15 Amendment 17

2 0 2 118

PPL Rev. 1 Main Turbine Bypass System 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify one complete cycle of each required main 31 days turbine bypass valve.

SR 3.7.6.2 Perform a system functional test.

24 months SR 3.7.6.3 Verify the TURBINE BYPASS SYSTEM 24 months RESPONSE TIME is within limits.

SUSQUEHANNA - UNIT 1 TS /3.7-16 Amendment 17/,,

2 2 ft

PPL Rev. 1 Main Turbine Bypass System 3.7.6 3.7 PLANT SYSTEMS Main Turbine Bypass System 3.7.6 LCO 3.7.6 The Main Turbine Bypass System shall be OPERABLE.

OR Apply the following limits for an inoperable Main Turbine Bypass System as specified in the COLR:

a.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," and

b.

LCO 3.2.3, "LINEAR HEAT GENERATION RATE (LHGR)."

APPLICABILITY:

THERMAL POWER > 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Main Turbine Bypass A.1 Satisfy the requirements of the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> System inoperable.

LCO or restore Main Turbine Bypass System to OPERABLE status.

AND Requirements of LCO 3.2.2 not met.

OR Requirements of LCO 3.2.3 not met.

B. Required Action and B.1 Reduce THERMAL POWER to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion Time

< 25% RTP.

not met.

SUSQUEHANNA - UNIT 2 TS /3.7-15 Amendmentl4i 1 5 1 f..31

PPL Rev. 1 Main Turbine Bypass System 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify one complete cycle of each required main 31 days turbine bypass valve.

SR 3.7.6.2 Perform a system functional test.

24 months SR 3.7.6.3 Verify the TURBINE BYPASS SYSTEM 24 months RESPONSE TIME is within limits.

SUSQUEHANNA - UNIT 2 TS / 3.7-16 Amendment Ai

-193 193