MONTHYEARML0429903842004-10-28028 October 2004 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0433802212004-11-30030 November 2004 Technical Specifications - Issuance of Amendment Changes to Safety Limit Minimum Critical Power Ratio S111396 Project stage: Approval ML0433501522004-11-30030 November 2004 License Amendment Safety Limit Minimum Critical Power Ratio Project stage: Other ML0506205452005-03-0909 March 2005 3/9/05, Fermi 2, Withholding from Public Disclosure TAC No. MC4748 Project stage: Other ML0507004112005-03-10010 March 2005 RAI on TS Amendment Nos. MC4410, MC4413, MC4745, MC4746 and MC4747 Project stage: RAI ML0526203312005-09-15015 September 2005 Tech Spec Pages for Amendments 288 and 226, Technical Specification Changes Associated with the Consolidated Quality Assurance Program Description Project stage: Other ML0522100392005-09-15015 September 2005 Issuance of License Amendments 288 and 226, Technical Specification Changes Associated with the Consolidated Quality Assurance Program Description Project stage: Approval ML0927803352009-10-14014 October 2009 Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI 2005-03-10
[Table View] |
Similar Documents at Fermi |
|---|
|
Text
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10X rated core flow:
THERMAL POWER shall be
2.1.1.2 With flow the reactor steam dome pressure 2 785 psig and core k 10X rated core flow:
MCPR shall be k 1.08 or > 1.09 for single 2.1.1.3 Reactor vessel water of active irradiated for two recirculation loop operation I recirculation loop operation.
level shall be greater than the top fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be S 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
.7-FERMI -UNIT 2 2.0-1 Amendment No. #AK, #