(BVPS-1 and 2) - Request for Additional Information (RAI) - Reactor Trip System (RTS) and Engineered Safeguards Features Actuation System (ESFAS) Instrumentation
ML043370287
Person / Time
Site: Beaver Valley
Issue date: 12/14/2004
From: Colburn T
NRC/NRR/DLPM/LPD1
To: Pearce L
FirstEnergy Nuclear Operating Co
Colburn T, NRR/DLPM, 415-1402
References
TAC MC3404, TAC MC3405
Download: ML043370287 (4)


Text

December 14, 2004 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -

REQUEST FOR ADDITIONAL INFORMATION (RAI) - REACTOR TRIP SYSTEM (RTS) AND ENGINEERED SAFEGUARDS FEATURES ACTUATION SYSTEM (ESFAS) INSTRUMENTATION (TAC NOS. MC3404 AND MC3405)

Dear Mr. Pearce:

The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your June 2, 2004, license amendment application to increase the surveillance test interval from monthly to quarterly for the subject RTS and ESFAS instrumentation channel functional tests. The NRC staff has determined that the additional information contained in the enclosure to this letter is needed to complete its review. As discussed with your staff, we request your response within 45 days of receipt of this letter, in order for the NRC staff to complete its scheduled review of your submittal.

Sincerely,

/RA/

Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

RAI cc w/encl: See next page

December 14, 2004 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -

REQUEST FOR ADDITIONAL INFORMATION (RAI) - REACTOR TRIP SYSTEM (RTS) AND ENGINEERED SAFEGUARDS FEATURES ACTUATION SYSTEM (ESFAS) INSTRUMENTATION (TAC NOS. MC3404 AND MC3405)

Dear Mr. Pearce:

The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your June 2, 2004, license amendment application to increase the surveillance test interval from monthly to quarterly for the subject RTS and ESFAS instrumentation channel functional tests. The NRC staff has determined that the additional information contained in the enclosure to this letter is needed to complete its review. As discussed with your staff, we request your response within 45 days of receipt of this letter, in order for the NRC staff to complete its scheduled review of your submittal.

Sincerely,

/RA/

Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

RAI cc w/encl: See next page DISTRIBUTION:

PUBLIC MO'Brien ACRS PDI-1 R/F TColburn DLPM/DPR OGC RLaufer GMatakas, RGN-I SRhow EMarinos HGarg ACCESSION NO. ML043370287 OFFICE PDI-1/PM PDI-2/LA EEIB/SC PDI-1/SC NAME TColburn MOBrien EMarinos RLaufer DATE 12/09/04 12/09/04 12/09/04 12/14/04 OFFICIAL RECORD COPY

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION RELATED TO FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2)

REACTOR TRIP SYSTEM (RTS) AND ENGINEERED SAFEGUARDS FEATURES ACTUATION SYSTEM (ESFAS) INSTRUMENTATION DOCKET NOS. 50-334 AND 50-412 By letter dated June 2, 2004, FENOC (the licensee) proposed changes to BVPS-1 and 2 Technical Specifications (TSs) to change the surveillance interval for RTS and ESFAS instrumentation from monthly to quarterly for channel functional tests. The staff has determined that it will need the additional information identified below to complete its review.

(1) The procedure for conducting an RTS surveillance shouId require an evaluation of any RTS channel test failure to determine if that failure could result in a common-cause failure. The Nuclear Regulatory Commission (NRC) staff would need to verify this by reviewing the licensees procedure or have the licensee demonstrate how the licensee's procedure determines if the failure could be a common-cause failure.

(2) The licensee evaluated the setpoint drift for these relays using data from past calibrations and surveillances in a year-2000 study. The NRC staff requests that the licensee provide its year-2000 study and supporting analysis and justification that concludes that the extended surveillance is adequately accounted for in the instrument setpoint drift calculations for undervoltage and underfrequency RTS relays and undervoltage and degraded voltage ESFAS relays. If the proposed extended surveillance is based on any new setpoint calculations not previously approved, the NRC staff requests the licensee provide the methodology and calculations for review or otherwise confirm that no new setpoint methodologies or calculations form the basis for the requested surveillance extension.

(3) Regarding applicability of the generic analysis to BVPS-1 and 2, the licensee stated that the remaining changes have been analyzed by Westinghouse using the methodology employed by WCAP-10271. The NRC staff requests the licensee discuss in greater detail the applicability of WCAP-10271 to its facilities.

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077