SAFEGULJ.ARDS INIFORMATION Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 Mike D. Skaggs Vice President, Browns Ferry Nuclear Plant November 24, 2004 EA-03-086 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop:
OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
Docket Nos. 50-259 50-260 50-296 In the Matter of Tennessee Valley Authority
)
BROWNS FERRY NUCLEAR PLANT (BFN) -
UNITS 1, 2, AND 3 -
RESPONSE
TO NRC REQUEST FOR INFORMATION REGARDING RELAXATION OF SECTION III.A OF ORDER EA-03-086 (TAC NOS. MC2892, MC2893, AND MC2894)
This letter responds to NRC's October 29, 2004, letter, regarding TVA's compliance with Order EA-03-86 addressing the revised design basis threat.
Specifically, NRC required that TVA specify the date by which full compliance with the Order would be established and to provide a detailed explanation for any activities that were not completed by October 29, 2004, in order to mitigate potential enforcement action.
TVA's detailed response is provided in the Enclosure to this letter.
This response contains Safeguards Information as defined in 10 CFR 73.21.
TVA, therefore, requests the Enclosure be withheld from public disclosure.
There are no new regulatory commitments in this letter.
If have any questions about this response, please contact T. E. Abney at (256) 729-2636.
IREVIEWED CL=A TSPAEs FOMTHE AT NAME L DLLT~EDATCED TITLE bc1 n Cac ORGANI BATION SAFEGUARDS INFORMAAT ION DATE I1i241zeA
- yo~ps SSIFICAITON L
IV A A
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 2 November 24, 2004 I declare under penalty of perjury that the information contained in this letter and its Enclosure is true and correct.
Executed this November 24, 2004.
Sincerely, M. D. Skaggs ' -
Site Vice President Enclosure cc: See page 3 WHEN SEPARATED FROM THE ATTACHED.
THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
'U.S. Nuclear Regulatory Commission Page 3 November 24, 2004 cc: (w/o Enclosure)
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 WHENSEPARATED FROM THE ATTACHED, THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION