ML043270534

From kanterella
Jump to navigation Jump to search

Correction to Safety Evaluation Dated October 28, 2004, Regarding Revision to Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
ML043270534
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/19/2004
From: John Nakoski
NRC/NRR/DLPM/LPD2
To: Venable J
Entergy Operations
Chernoff, M H, NRR/DLPM, 301-415-4041
References
TAC MC2987
Download: ML043270534 (5)


Text

SAFEGUARDS INFORMATION November 19, 2004 Mr. Joseph E. Venable Vice President, Operations Entergy Operations, Inc.

Waterford 3 Steam Electric Station 17265 River Road Killona, LA 70066

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - CORRECTION TO SAFETY EVALUATION DATED OCTOBER 28, 2004, REGARDING REVISION TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2987)

Dear Mr. Venable:

By letter dated October 28, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative change to the Waterford Steam Electric Station, Unit 3, Facility Operating License (NPF-38) to incorporate the reference to the recently-revised physical security plan, training and qualification plan, and safeguards contintency plan. Your staff identified three errors in the Safety Evaluation provided in the October 28, 2004, letter.

Therefore, the NRC is issuing corrected pages 14, 15, and 43 of the Safety Evaluation, which contain Safeguards Information. The revised Safety Evaluation pages for Waterford Steam Electric Station, Unit 3, are enclosed. We regret any inconvenience this may have caused.

Sincerely,

/RA/

John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosures:

As stated cc w/o encl: next page cc w/encl: Mr. Scott Anders, Site Security Manager SAFEGUARDS INFORMATION NOTICE: The Enclosure to this letter contains Safeguards Information.

Upon separation from the Enclosure, this letter is DECONTROLLED.

SAFEGUARDS INFORMATION November 19, 2004 Mr. Joseph E. Venable Vice President, Operations Entergy Operations, Inc.

Waterford 3 Steam Electric Station 17265 River Road Killona, LA 70066

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - CORRECTION TO SAFETY EVALUATION DATED OCTOBER 28, 2004, REGARDING REVISION TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2987)

Dear Mr. Venable:

By letter dated October 28, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative change to the Waterford Steam Electric Station, Unit 3, Facility Operating License (NPF-38) to incorporate the reference to the recently-revised physical security plan, training and qualification plan, and safeguards contintency plan. Your staff identified three errors in the Safety Evaluation provided in the October 28, 2004, letter.

Therefore, the NRC is issuing corrected pages 14, 15 and 43 of the Safety Evaluation, which contain Safeguards Information. The revised Safety Evaluation pages for Waterford Steam Electric Station, Unit 3, are enclosed. We regret any inconvenience this may have caused.

Sincerely,

/RA/

John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosures:

As stated cc w/o encl: next page cc w/encl: Mr. Scott Anders, Site Security Manager DISTRIBUTION:

PUBLIC SPRT R/F OGC ACRS DJohnson NKalyanam RGramm HBerkow GHill (2)

DLPM DPR TBoyce AHowell, RIV Accession No.: ML043270534 OFFICE SPRT/TL SPRT/PM DLPM/LA PDIV/PM SPRT/PL NRR/SC NAME PPeduzzi MChernoff CRaynor NKalyanam JPeralta JNakoski DATE 11-15-2004 11-18-2004 11-19-2004 11-19-2004 11-18-2004 11-18-2004 OFFICIAL RECORD COPY SAFEGUARDS INFORMATION NOTICE: The Enclosure to this letter contains Safeguards Information.

Upon separation from the Enclosure, this letter is DECONTROLLED.

Waterford Steam Electric Station, Unit 3 cc w/o encl.:

Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Vice President Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697

WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties Safeguards information determination made by:

Name/Title: J. Peralta/Sr. Program Manager Organization: NSIR/DNS Basis DBT Order Signature Date SAFEGUARDS INFORMATION CORRECTION TO SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION AND THE OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE RELATED TO ORDER EA-03-086 TO FACILITY OPERATING LICENSE NPF-38 ENTERGY OPERATIONS, INC.

WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382 Replace the following pages of the October 28, 2004, Safety Evaluation with the enclosed revised pages as indicated. The revised pages are identified by marginal lines indicating the area of change.

Remove Page Insert Page 14 14 15 15 43 43 Enclosure SAFEGUARDS INFORMATION