ML041340738

From kanterella
Jump to navigation Jump to search

Supplemental Response to the April 29, 2003, Orders Modifying Licenses for Revised Design Basis Threat
ML041340738
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/20/2004
From: John Nakoski
NRC/NRR/DLPM/LPD2
To: Venable J
Entergy Operations
Chernoff, M H, NRR/DLPM, 301-415-4041
References
EA-03-086, TAC MC2987
Download: ML041340738 (4)


Text

May 20, 2004 Mr. Joseph E. Venable Vice President, Operations Entergy Operations, Inc.

17265 River Road Killona, LA 70066

SUBJECT:

WATERFORD STEAM ELECTRIC GENERATING STATION, UNIT 3 -

SUPPLEMENTAL RESPONSE TO THE APRIL 29, 2003, ORDERS MODIFYING LICENSES FOR REVISED DESIGN BASIS THREAT (TAC NO. MC2987)

Dear Mr. Venable:

On April 29, 2003, the Nuclear Regulatory Commission (NRC) issued an Order modifying the operating license for Waterford Steam Electric Generating Station, Unit 3 to: (1) require compliance with a revised Design Basis Threat (DBT); (2) implement new security force personnel training and physical fitness requirements; and (3) prescribe compensatory measures related to fitness-for-duty enhancements applicable to security force personnel.

Section III.A.1 of EA-03-086 (DBT Order) required that all licensees submit revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, based on the revised DBT, to the NRC for review and approval no later than April 29, 2004. The DBT Order further requires licensees to implement the revised physical security plans, revised safeguards contingency plans, and revised security force personnel training and qualification plans no later than October 29, 2004.

By letter dated April 29, 2004, you submitted a supplemental response to the DBT Order for Waterford Steam Electric Generating Station, Unit 3.

J. E. Venable The NRC staff will review your physical security plan in the months of May and June, your training and qualification plan during July, and your contingency plan during August. Should further information regarding your submittal be necessary to support our review, you will be notified promptly.

The NRC staff plans to complete the review of your supplemental response by October 29, 2004.

Sincerely,

/RA/

John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382 cc: See next page

ML041340738 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR/SSC SPRT/NSIR SPRT/NRR/SC NAME MChernoff CHawes PPeduzzi JPeralta JNakoski DATE 5/19/04 5/20/04 5/20/04 5/20/04 5/20/04

Waterford Steam Electric Station, Unit 3 cc:

Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Vice President, Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751