November 17, 2004 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION

Dear Mr. Spina:

By letter dated May 26, 2004, Constellation Energy Group Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for the Nine Mile Point Nuclear Station (NMP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.

Based on discussions with Mr. Peter Mazzaferro of your staff, a mutually agreeable date for your response is within 30 days from the date of this letter. If you have any questions regarding this letter or if circumstances result in your need to revise the response date, please contact me at 301-415-1458 or by e-mail at nbl@nrc.gov.

Sincerely,

/RA/

N. B. (Tommy) Le, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-220 and 50-410

Enclosure:

As stated cc w/encl: See next page

ML043220665 DISTRIBUTION: See next page Document Name: E:\\Filenet\\ML043220665.wpd OFFICE RLEP:PM RLEP:SC-A NAME N. Le S. Lee DATE 11/17/04 11/17/04

DISTRIBUTION: Ltr to J. Spina, RAI Re: Nine Mile Point Nuclear Station, Units 1 and 2 Dated: November 17, 2004 Accession No.: ML043220665 HARD COPY RLEP RF N. Le (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski S. Miranda RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)

T. Smith M. Lemoncelli M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Holden R. Laufer P. Tam B. Fuller, RI E. Knutson, RI J. Trapp, RI T. Mensah OPA

NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 (NMP1 and NMP2)

LICENSE RENEWAL APPLICATION (LRA)

REQUEST FOR ADDITIONAL INFORMATION (RAI)

RELATED TO:

RAIs from Reactor Systems Branch [Reviewer: S Miranda]

RAI-1. For NMP1, please indicate whether the thermal sleeves for core spray and recirculation inlet nozzles or the liquid poison and core differential pressure lines are considered part of the reactor pressure vessel nozzles, safe ends, attachments and instrument penetrations requiring an AMR.

RAI-2. For NMP1, please indicate whether low-pressure coolant injection couplings ought to be included in the scope of license renewal. Please provide details explanation.

RAI-3. For NMP1, please indicate whether the nozzles connecting the reactor recirculation system to the connecting piping should be identified as reactor recirculation system components requiring AMR. Please provide details explanation.

RAI-4. For both units, the steam separator assembly consists of a base into which are welded an array of standpipes, with a steam separator located at the top of each standpipe.

Are these standpipes included in the two plants scopes of license renewal? Please provide details explanation.

RAI-5. For both units, please indicate where the feedwater sparger is identified as a reactor vessel internal component requiring AMR.

RAI-6. For NMP1, please indicate whether the liquid poison sparger should be identified as a reactor vessel internal component requiring AMR. Please provide details explanation.

RAI-7. For NMP1, please indicate whether the core shroud stabilizers should be identified as reactor vessel internal components requiring AMR. Please provide details explanation.

RAI-8. For NMP1, please indicate whether the core shroud vertical weld repair should be identified as a reactor vessel internal component requiring AMR. Please provide details explanation.

RAI-9. For NMP1, please provide dwg no. LR-18000-C, sheets 1 and 2 RAI-10. For NMP1, please indicate whether access hole covers should be identified as reactor vessel internal components requiring AMR. Please provide details explanation.

RAI-11. For NMP1, please indicate whether incore instrumentation guide tubes should be identified as reactor vessel internal components requiring AMR. Please provide details explanation.

RAI-12. For NMP1, please indicate whether restriction orifices, radiation collars, or vacuum breakers should be identified as reactor pressure vessel instrumentation system components requiring AMR. Please provide details explanation.

RAI-13. For NMP2, please indicate whether temperature equalizing columns should be identified as reactor pressure vessel instrumentation system components requiring AMR.

Please provide details explanation.

RAI-14. For NMP2, please indicate whether pump seal flanges should be identified as reactor recirculation system components requiring AMR. Please provide details explanation.

RAI-15. For NMP1, please indicate whether restriction orifices, radiation collars, or seal coolers should be identified as reactor recirculation system components requiring AMR. Please provide details explanation.

RAI-16. For NMP1, please indicate whether CRD hydraulic control units, flow elements and indicators, pumps, and rupture discs should be identified as control rod drive system components requiring AMR. Please provide details explanation.

RAI-17. For NMP1, please indicate whether floor and equipment drain system components should be identified as components requiring AMR. Please provide details explanation.

RAI-18. For NMP2, please indicate whether sampling system components should be identified as components requiring AMR. Please provide details explanation.

RAI-19. For NMP2, please indicate whether heat exchangers and nozzles should be identified as core spray system components requiring AMR. Please provide details explanation.

RAI-20. For NMP1, please indicate whether filters or strainers, flow elements, and temperature elements, should be identified as liquid poison system components requiring AMR. Please provide details explanation.

RAI-21. For NMP1, please indicate whether bellows should be identified as neutron monitoring system components requiring AMR. Please provide details explanation.

End of RAIs

Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Kathryn M. Sutton, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group, Inc.

750 East Pratt Street Baltimore, MD 21202 Mr. James M. Petro, Jr., Esquire Counsel Constellation Energy Group 750 East Pratt Street, 5th Floor Baltimore, MD 21202 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Fred Emerson Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708 Mr. Mark Flaherty Manager - Fleet Licensing R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Ontario, NY 14519 Mr. M. Steven Leonard General Supervisor - Nuclear Regulatory Matters Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc:

Mr. Peter Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Mike Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401