Core Operating Limits Report (Colr), Unit 3- Revision 14
ML043200227
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/03/2004
From: Bauer S
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-05172-SAB/TNW/JAP
Download: ML043200227 (28)


Text

Scott A. Bauer Department Leader Regulatory Affairs Tel: 623/393-5978 Mail Station 7636 Palo Verde Nuclear Fax: 6231393-5442 P.O. Box 52034 Generating Station e-mail: sbauer~apsc.com Phoenix, AZ 85072-2034 102-05172-SAB/TNW/JAP November 3, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket Nos. STN 50-530 Core Operating Limits Report (COLR), Unit 3- Revision 14 Pursuant to PVNGS Technical Specifications, Section 5.6.5.d, enclosed is Unit 3 Revision 14 COLR which was made effective on October 30, 2004. This revision of the COLR consists of revising Azimuthal Power Tilt (Section 3.2.3) to allow the tilt to be s 10% when power is > 20% and 5 50%. Figure 3.2.3-1, "Azimuthal Power Tilt versus Thermal Power," has been added to reflect these limit changes. Additionally, this revision implements changing the wording for full/part length control element assemblies (CEAs) to full/part strength CEAs. The change for "full/part length" to "full/part strength" CEAs are associated with the implementation of PVNGS Operating License Amendment No.152 for Unit 3. This revision replaces the previous Unit 3, Revision 13, COLR.

By copy of this letter and the enclosure, this COLR revision is being provided to the NRC Region IV Administrator and the PVNGS Senior Resident Inspector.

This letter does not make any commitments to the NRC.

Please contact Thomas N. Weber at (623) 393-5764 if you have any questions or require additional information.

Sincerely, SAB/TNW/JAP

Enclosure:

Core Operating Limits Report for PVNGS Unit 3 - Revision 14 cc: B. S. Mallett NRC Region IV Regional Administrator M. B. Fields NRC NRR Project Manager N. L. Salgado NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance AC 01 Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

V Enclosure Core Operating Limits Report for PVNGS Unit 3 - Revision 14

I Revision 14 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 3 Revision 14 Responsible Engineer Digitally signed by: Bodnar, Walter S Date (ZA8570)

Date: 10/15/2004 14:34:42 Reason: I am the author of this document Location: PVNGS Independent Reviewer Digitally signed by: Webb, James R Date (V97187)

Date: 10/15/2004 14:54:35 Reason: I have reviewed this document Location: PVNGS Responsible Section Leader Digitally signed by: Cannon, Thomas C Date (Z20485)

Date: 10/15/2004 15:26:01 Reason: I am approving this document Location: PVNGS Page 1 of 26

Revision 14 PVrNGS UNIT 3 CORE OPERATING LIMITS REPORT Table of Contents Description Revision # Page Cover Page 14 1 Table of Contents 14 2 List of Figures 14 3 List of Tables 11 4 Affected Technical Specifications 14 5 Analytical Methods 14 6 CORE Operating Limits 3.1.1 Shutdown Margin (SDM) - Reactor Trip Breakers Open 14 8 3.1.2 Shutdown Margin (SDM) - Reactor Trip Breakers Closed 14 8 3.1.4 Moderator Temperature Coefficient (MTC) 14 8 3.1.5 Control Element Assembly (CEA) Alignment 14 8 3.1.7 Regulating CEA Insertion Limits 14 8 3.1.8 Part Strength CEA Insertion Limits 14 9 3.2.1 Linear Heat Rate (LHR) 14 9 3.2.3 Azimuthal Power Tilt (Tq) 14 9 3.2.4 Departure From Nucleate Boiling Ratio (DNBR) 14 9 3.2.5 Axial Shape Index (ASI) 11 10 3.3.12 Boron Dilution Alarm System (BDAS) 11 10 3.9.1 Boron Concentration 11 10 Page 2 of 26

Revision 14 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT List of Figures Description Revision # Page Figure 3.1.1-1 Shutdown Margin Versus Cold Leg Temperature 11 11 Reactor Trip Breakers Open Figure 3.1.2-1 Shutdown Margin Versus Cold Leg Temperature 11 12 Reactor Trip Breakers Closed Figure 3.1.4-1 MTC Acceptable Operation, Modes 1 and 2 11 13 Figure 3.1.5-1 Core Power Limit After CEA Deviation 11 14 Figure 3.1.7-1 CEA Insertion Limits Versus Thermal Power 12 15 (COLSS in Service)

Figure 3.1.7-2 CEA Insertion Limits Versus Thermal Power 12 16 (COLSS Out of Service)

Figure 3.1.8-1 Part Strength CEA Insertion Limits Versus Thermal Power 14 17 Figure 3.2.3-1 Azimuthal Power Tilt Versus Thermal Power 14 18 (COLSS in Service)

Figure 3.2.4-1 COLSS DNBR Operating Limit Allowance for Both 11 19 CEACs Inoperable Figure 3.2.4-2 DNBR Margin Operating Limit Based on the Core 11 20 Protection Calculators (COLSS Out of Service, CEACs Operable)

Figure 3.2.4-3 DNBR Margin Operating Limit Based on the Core 11 21 Protection Calculators (COLSS Out of Service, CEACs Inoperable)

Page 3 of 26

Revision 11 PVINGS UNIT 3 CORE OPERATING LIMITS REPORT List of Tables Description Revision # Page Table 3.3.12-1 Required Monitoring Frequencies for Backup Boron 11 22 Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for Keffh 0.98 Table 3.3.12-2 Required Monitoring Frequencies for Backup Boron 11 23 Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for 0.98 > Keff> 0.97 Table 3.3.12-3 Required Monitoring Frequencies for Backup Boron 11 24 Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for 0.97 > Keff> 0.96 Table 3.3.12-4 Required Monitoring Frequencies for Backup Boron 11 25 Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for 0.96 > Keff> 0.95 Table 3.3.12-5 Required Monitoring Frequencies for Backup Boron 11 26 Dilution Detection as a Function of Operating Charging Pumps and Plant Operational Modes for Keff < 0.95 Page 4 of 26

Revision 11 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT This Report has been prepared in accordance with the requirements of Technical Specification 5.6.5. The Core Operating Limits have been developed using the NRC approved methodologies specified in Section 5.6.5 b of the Palo Verde Unit 3 Technical Specifications.

AFFECTED PVNGS TECHNICAL SPECIFICATIONS 3.1.1 Shutdown Margin (SDM) - Reactor Trip Breakers Open 3.1.2 Shutdown Margin (SDM) - Reactor Trip Breakers Closed 3.1.4 Moderator Temperature Coefficient (MTC) 3.1.5 Control Element Assembly (CEA) Alignment 3.1.7 Regulating CEA Insertion Limits 3.1.8 Part Strength CEA Insertion Limits 3.2.1 Linear Heat Rate (LHR) 3.2.3 Azimuthal Power Tilt (Tq) 3.2.4 Departure From Nucleate Boiling Ratio (DNBR) 3.2.5 Axial Shape Index (ASI) 3.3.12 Boron Dilution Alarm System (BDAS) 3.9.1 Boron Concentration Page 5 of 26

Revision 14 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT ANALYTICAL METHODS The COLR contains the complete identification for each of the Technical Specification referenced topical reports (i.e., report number, title, revision, date, and any supplements) that provide the NRC-approved analytical methods used to determine the core operating limits, described in the following documents:

Title Report No. Rev Date Supplement

1) CE Method for Control Element CENPD- N.A. January 1976 N.A.

Assembly Ejection Analysis 0190-A (13-NOO1-1301-01204-1)

2) The ROCS and DIT Computer CENPD- N.A. April 1983 N.A.

Codes for Nuclear Design 266-P-A (13-NOO1-1900-01412-0)

3) Modified Statistical Combination CEN- 01-P-A May 1988 N.A.

of Uncertainties 356(V)-P-A (ARI) (April 1996)

(13-N001-1303-01747-2)

4) System 8OTM Inlet Flow Distribu- Enclosure N.A. February 1993 1-P tion 1-P to LD-(13-NOO1-1301-01228-0)82-054
5) Calculative Methods for the CE CENPD- N.A. March 2001 4-P-A Large Break LOCA Evaluation 132 Model for the Analysis of CE and W Designed NSSS (13-NOO1-1900-01192-3)
6) Calculative Methods for the CE CENPD- N.A. April 1998 2-P-A Small Break LOCA Evaluation 137-P Model (13-NOO1-1900-01185-3)
7) Fuel Rod Maximum Allowable CEN-372- N.A. May 1990 N.A.

Pressure P-A (13-N001-0201-00026-1)

8) Arizona Public Service Company N.A. N.A. September N.A.

PWR Reactor Physics Methodology 1999 Using CASMO-4/SIMULATE-3 (NFM-002)

Page 6 of 26

Revision 13 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Title Report No. Rev Date Supplement

9) Technical Description Manual for CE-NPD 1 April 2004 N.A.

the CENTS Code 282-P-A (13-N001-1303-02349-2 for Vol. 1-4) Vols. 1-4

10) Implementation of ZIRLO0M CENPD- 0 November N.A.

Cladding Material in CE Nuclear 404-P-A 2001 Power Fuel Assembly Designs (13-N001-1900-01329-0)

Page 7 of 26

Revision 14 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT The cycle-specific operating limits for the specifications listed are presented below.

3.1.1 - Shutdown Margin (SDM) - Reactor Trip Breakers Open The Shutdown Margin shall be greater than or equal to that shown in Figure 3.1.1 -

1.

3.1.2 - Shutdown Margin (SDM) - Reactor Trip Breakers Closed The Shutdown Margin shall be greater than or equal to that shown in Figure 3.1.2-1.

3.1.4 - Moderator Temperature Coefficient (MTC)

The moderator temperature coefficient (MTC) shall be within the area of Acceptable Operation shown in Figure 3.1.4-1.

3.1.5 - Control Element Assembly (CEA) Alignment With one or more full-strength or part-strength CEAs misaligned from any other CEAs in its group by more than 6.6 inches, the minimum required MODES 1 and 2 core power reduction is specified in Figure 3.1.5-1.

3.1.7 - Regulating CEA Insertion Limits One or more CEACs OPERABLE: With COLSS IN SERVICE, regulating CEA groups shall be limited to the withdrawal sequence and to the insertion limits1 shown in Figure 3.1.7-12; with COLSS OUT OF SERVICE, regulation CEA groups shall be limited to the withdrawal sequence and to the insertion limits1 shown in Figure 3.1.7-2.2 1A reactor power cutback will cause either (Case 1) Regulating Group 5 or Regulating Group 4 and 5 to be dropped with no sequential insertion of additional Regulating Groups (Groups 1, 2, 3, and 4) or (Case 2) Regulating Group 5 or Regulating Group 4 and 5 to be dropped with all or part of the remaining Regulating Groups (Groups 1, 2, 3, and 4) being sequentially inserted. In either case, the Transient Insertion Limit and withdrawal sequence specified in the CORE OPERATING LIMITS REPORT can be exceeded for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

2 The Separation between Regulating Groups 4 and 5 may be reduced from the 90 inch value specified in Figures 3.1.7-1 and 3.1.7-2 provided that each of the following conditions are satisfied:

Page 8 of 26

Revision 14 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT a) Regulating Group 4 position is between 60 and 150 inches withdrawn.

b) Regulating Group 5 position is maintained at least 10 inches lower than Regulating Group 4 position.

c) Both Regulating Group 4 and Regulating Group 5 positions are maintained above the Transient Insertion Limit specified in Figure 3.1.7-1 (COLSS In Service) or Figure 3.1.7-2 (COLSS Out of Service).

3.1.8 - Part Strength CEA Insertion Limits One or more CEACs OPERABLE: The part strength CEA groups shall be limited to the insertion limits shown in Figure 3.1.8-1.

3.2.1 - Linear Heat Rate (LHR)

The linear heat rate limit of 13.1 kW/ft shall be maintained.

3.2.3 - Azimuthal Power Tilt (Tq)

The AZIMUTHAL POWER TILT (Tq) shall be less than or equal to 10% with COLSS IN SERVICE when power is greater than 20% and less than or equal to 50%. AZIMUTHAL POWER TILT (Tq) shall be less than or equal to 5% with COLSS IN SERVICE when power is greater than 50%. See Figure 3.2.3-1.

3.2.4 - Departure From Nucleate Boiling Ratio (DNBR)

COLSS IN SERVICE and Both CEACs INOPERABLE - Maintaining COLSS calculated core power less than or equal to COLSS calculated core power operation limit based on DNBR decreased by the allowance shown in Figure 3.2.4-1.

COLSS OUT OF SERVICE and Either One or Both CEACs are OPERABLE -

Operating within the region of acceptable operation of Figure 3.2.4-2 using any operable CPC channel.

COLSS OUT OF SERVICE and CEACs INOPERABLE - Operating within the region of acceptable operation of Figure 3.2.4-3 using any operable CPC channel.

Page 9 of 26

Revision 11 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT 3.2.5 - Axial Shape Index (ASI)

The core average AXIAL SHAPE INDEX (ASI) shall be maintained within the following limits:

COLSS OPERABLE

-0.18 <ASI< 0.18 forpower>50%

-0.28 < ASI < 0.18 for power < 50%

COLSS OUT OF SERVICE (CPC)

-0.10< ASI <0.10 3.3.12 - Boron Dilution Alarm System (BDAS)

With one or both start-up channel high neutron flux alarms inoperable, the RCS boron concentration shall be determined at the applicable monitoring frequency specified in Tables 3.3.12-1 through 3.3.12-5.

3.9.1 - Boron Concentration The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained at a uniform concentration Ž 3000 ppm.

Page 10 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORTReion1 Revision II FIGURE 3. 1. 1-1 SHUTDOWN MARGIN VERSUS COLD LEG TEMPERATURE REACTOR TRIP BREAKERS OPEN 7 ...........................................................

6 ...........................................

5 ........ (500,5 REGION OF A CCEPTABLE OPERATION 4 -- - - --------

i 0

.......- ..------------/-- -

3 ------------- ------------------

9 V) GlON::OF UNACCEPTABLE ------------- ------------

2 OPERATION 1 -------------

(35 Ot.0)

I i i . . . . I . . I 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

0 100 200 300 400 500 600 COLD LEG TEMPERATURE (-F)

Page I I of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Revision I I FIGURE 3.1.2-1 SHUTDOWN MARGIN VERSUS COLD LEG TEMPERATURE REACTOR TRIP BREAKERS CLOSED I

...... .1 . . . . . . r.... . .I.........

I (500,6.5) 6 REGION OF .................. ....... ..........  ;........ .......................... ... ,;........

ACCEPTABLE 5 .......OPERATION ..... .. . . . . . . . . .

3504.0 a

0 4 I -

3 CO) REGION OF UNACCEPTABLE 2 ..............

OPERATION 1 . . . .. . .... ..... I.

I.... I....... i .........

0 0 100 200 300 400 500 600 COLD LEG TEMPERATURE (F)

Page 12 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Revision I I FIGURE 3.1.4-1 MTC ACCEPTABLE OPERATION, MODES 1 AND 2 0.5 - 016 sons. I . . . .

aaaaaa so (0%,0.5) fteft"'ao: ...... 000%,0 0.0 ............. ....... - ........... ------- ------- ..............

Mae ... a (50%,O.O)

(100%,-0.2

-0.5 ............. ....... -......... - ------------- ------------- -------------- -------------- ...........

C 0.e_

- 1.0 ............ ------------------------------------------------------------- ---------- ----------------------------- -----------

w U -1.5 ------------- M TC -ARE & O F ------------ _- _--_--------

E 0U ACCEPTABLE

-2.0 --------- --------- ------- ............. .......... O PER A TION ,-.- ------ ........ .............. ......

P

-2.5 -------------- ---------- ------ --

w R ---------- -----------... ....

-3.0 wce Im 0 (0%,-3.4) n -3.5 ------------- .............. -.7 ...........

-4.0 - ------------- ------------- ------- ---------- ------- ------

-4.5 -------------------------------------------------

0 10 20 30 40 50 60 70 80 90 100 CORE POWER LEVEL

(% OF RATED THERMAL POWER)

End of Cycle Limit Beginning of Cycle Limit MOMMOM TECH SPEC 3.1.4 Maximum Upper Limit None.

Page 13 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Revision 11 FIGURE 3.1.5-1 CORE POWER LIMIT AFTER CEA DEVIATION*

30 ......... .I... ..... .. . .. -.-.-.

(60 MIN, 20.0%)

20 . .-....................

E 15; . . ... <-

e 10 _ ........

0 s,. ...

,,,,,.. . ... ... .. . .. .. .. . ... . ... .. .. .. .... I . .. .. .. - - - - - ---, .........-- - - - -

0 10 20 30 40 50 60 TIME AFTER DEVIATION, MINUTES

  • WHEN CORE POWER IS REDUCED TO 55% OF RATED THERMAL POWER PER THIS LIMIT CURVE, FURTHER REDUCTION IS NOT REQUIRED.

Page 14 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORTRvion2 Rcvision 12 FIGURE 3.1.7-1 CEA INSERTION LIMITS VERSUS THERMAL POWER (COLSS IN SERVICE) 1.0 0.9 ............ ....... SE-E FOOTNOTE- IN- SECTION 3.1.7.-....

FOR APPLICABILITY FOLLOWING:

0.8 w 0.7 ------- GRP 4POS =(1j72.35x FRAC.~PWR)+ 25.5-GRP S POS =(172.5:x FRAC. PWR) - 64.5 0 0.6 U 0.5 I.

...-.. y vz

  • U. .. . . .. . . . . . . . . . .. . . . .. . . . .. . .. . . . . . .. . . . .. . . . . . . .

0.4 <3 F-0.3 -------------

o v..z.. . . . . . . . . . . . .. . . . . .. . . . . . . ... . . . . .. . . .. . . . ..

0.2 0.1 0.0 I

GROUP I I 5 a I I I I GROUP I I 3 I I I I GROUP I I I I I

I I I I I a I I I I I I I I I I I I 150 120 90 60 30 0 150 120 90 60 30 0 150 120 90 60 30 0 GROUP 4 GROUP 2 a I I I I I A I a I I

- I I 3~0 b CEA POSITION (INCHES WITHDRAWN)

Page 15 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORTReson1 Revision 12 FIGURE 3.1.7-2 CEA INSERTION LIMITS VERSUS THERMAL POWER (COLSS OUT OF SERVICE) 1.0 0.9 0.8 (SEE FOOTNOT-E-IN-SEC-TION 3.1.7 -

FOR APPLICABILITY FOLLOWING

.. . . . . .. . . . . . . . . . . . . . .. . . . .. . . .I . . . . . . . .. . .

0.7 04 RECOR-CUTB9 vFACK)

A.......G. PW)+

w 0.6 GRP 4POS= (250.9 iFRAC. PWR) +9.82 0 -- -- - - - - - -- - - . . - - - -- - - - - - - - - - - - - - - - -- - - - - - . . . . . . . .. . .

0.5 ------------------ (250.9-------R-C------------80.18-z 0.4 .... --- ---- ...........

0 5 -- - - -

0.3 a Z 0.2 -- - - - - - - - - - - -- - - -- - - -- - -

0.1 0.0 GROUP 5 GROUP 3 GROUPI1 i I g i i i i i i- - - I i 150 120 90 60 30 0 150 120 90 60 30 0 150 120 90 60 30 0 GROUP 4 GROUP 2 Ii A0 9+0 k 3+)0  !)I1tO I Z JO Jo3+0 t CEA POSITION (INCHES WITHDRAWN)

Page 16 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Revision 14 FIGURE 3.1.8-1 PART STRENGTH CEA INSERTION LIMITS VERSUS THERMAL POWER 0.0 10.0  :

20.0 30.0 40.0 _.... .......

z 50.0 60.0 0

70.0 _..... . ............... .. ..... . . . ...... . .......... ..... .... . ... ,......*....

TRANSIENT INSERTION LIMIT (750INCHES) 80.0 _. ... .... ..... I - -- - - - ...... .... ---- -- -- --- .. .. .. .. .. . -- - -- -- -- --- --- --- -- -- - - -- -- -- -- - -- ----- --....... ........

z 90.0 OPERATION ------ - OPERATION --------

UNACCEPTABLE

~~~.....,.., ...... , ,..... . .. ...... -- - -

RESTRICTED 100.0 110.0 _ - ............... . ..... ....... ------- .......

LONG TERM STEADY STATE INSERTION:LIMITS. (I 12.5 INCHES) 120.0 130.0 OPERATION ACCEPTABLE 140.0 150.0 .............. ............ . ... .... ........I...... I .... I.... .I .....

1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 FRACTION OF RATED THERMAL POWER Page 17 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORTResin1 Revision 14 FIGjURE 3.2.3-1 AZIMUTHAL POWER TILT VERSUS THERMAL POWER (COLSS IN SERVICE) 20.0 - - - - -I -

15.0 . ....... _ ---------- ---------- REGION-Of .......-

UNACCEPTABLE OPERATION 10.0 ..............

5.0 ................... ... - -.... m ...-.....

REGION OF ACCEPTABLE OPERATION

.. I. - .-. . .- . .. i . .. I.. .. i. ..

0.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 CORE POWER LEVEL

(% OF RATED THERMAL POWER)

Page 18 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Revision I I FIGURE 3.2.4-1 COLSS DNBR OPERATING LIMIT ALLOWANCE FOR BOTH CEAC's INOPERABLE 25 z

0 20 P

15 Iic z

CZ vw Hi 0

2 10 U,

8 5 0

0 25 50 75 100 CORE POWER LEVEL

(% OF RATED THERMAL POWER)

Page 19 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Revisi on 11 FIGURE 3.2.4-2 DNBR MARGIN OPERATING LIMIT BASED ON THE CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEAC's OPERABLE)

-Z.3 z~l1wll....... .. .. ,,,.......

T~ mw~qY~m........ w. -. ....... ...

ANY POWER LEVEL MINIMUM OF 1:CEAC OPERABL 2.4 .. .

. . ~~~(0.1,2.38g)'

2.3 ......... .... .. ............. . ............... ._.... ............ ...... ..... ........... ... .. ............... ... ............._

(-0.1,2.29) :.

I& 2.2 . .............. .................. ................ ........ ........ . ..... ..... .. ......................

I.

ACCEPTABLE OPERATION CZ

' POWER AT OR ABOVE 90%

2.1 ........... ................................ ..........................

U9 MINIMUM S.

OF 1 CEAC OPERABLE:

(0.05,2.03) 2.0 *1 , mmminmim(0.1,2.03)

.- P R TO ,, ------- -------- '

(-0.1 ,1.96) UNA CCE PT.A BL E .

1.9

,... I. I. I. I.

1.8 - - - - - - - - - - - - - - -

-0.1A 20 -0.15 -0.10 -0.05 0.00 0.05 0.10 0.15 0.20 CORE AVERAGE ASI Page 20 of 26

PVNGS UNIT 3 CORE OPERATING LIMITS REPORT R evision I11 FIGURE 3.2.4-3 DNBR MARGIN OPERATING LIMIT BASED ON THE CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEAC's INOPERABLE) 3.6 3.5 ACCEPTABLE OPERATION ANY: POWER LEVEL ................

CEAC's INOPERABLE 3.4 .- - - - - - - - - - .. .. ... .... ... ... ... ..... .. .. .. ...

(0.1,3.32)

(003.32) ............

V 3.3 a

IIIOPBL .... .. .---- ..... ... .. ...

3.2 _ .

(-0. 1,3.19)

... I...........

UNACCEPTABLE 3.1 OPERATION I II 3.0 1 ****** A .J.&.A.l.J LL

-0.20 -0.15 -0.10 -0.05 0.00 0.05 0.10 0.15 0.20 CORE AVERAGE ASI Page 21 of 26

Revision 11 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Table 3.3.12-1 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR Keff > 0.98 OPERATIONAL Number of Operating Charging Pumps MODE 0 1 2 3 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA ONA 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA ONA 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA ONA 4& 5 onSCS ONA ONA ONA ONA Notes: SCS = Shutdown Cooling System ONA = Operation Not Allowed Page 22 of 26

Revision 11 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Table 3.3.12-2 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR 0.98 2 Keff > 0.97 OPERATIONAL Number of Operating Charging Pumps MODE 0 1 2 3 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA 4 & 5 on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA ONA Notes: SCS = Shutdown Cooling System ONA = Operation Not Allowed Page 23 of 26

Revision 11 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Table 3.3.12-3 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR 0.97 2 Keff> 0.96 OPERATIONAL Number of Operating Charging Pumps MODE 0 1 2 3 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ONA 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 & 5 on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> I hour ONA ONA Notes: SCS = Shutdown Cooling System ONA = Operation Not Allowed Page 24 of 26

Revision 11 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Table 3.3.12-4 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR 0.96 2 Keff> 0.9 5 OPERATIONAL Number of Operating Charging Pumps MODE 0 1 2 3 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> 4 & 5 on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Notes: SCS = Shutdown Cooling System ONA = Operation Not Allowed Page 25 of 26

Revision 11 PVNGS UNIT 3 CORE OPERATING LIMITS REPORT Table 3.3.12-5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR Keff < 0.95 OPERATIONAL Number of Operating Charging Pumps MODE 0 1 2 3 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> I hour 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 4 & 5 on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> ONA 6 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA ONA Notes: SCS = Shutdown Cooling System ONA = Operation Not Allowed Page 26 of 26