Withdrawal of Relief Request to Extended Second Inservice Inspection Program 10-Year Interval
ML043170470
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/10/2004
From: Donohew J
NRC/NRR/DLPM/LPD4
To: Randolph G
Union Electric Co
Donohew J N, NRR/DLPM,415-1307
References
TAC MC3764
Download: ML043170470 (3)


Text

November 10, 2004 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - WITHDRAWAL OF RELIEF REQUEST TO EXTEND SECOND INSERVICE INSPECTION PROGRAM 10-YEAR INTERVAL (TAC NO. MC3764)

Dear Mr. Randolph:

By letter dated July 6, 2004 (ULNRC-05024), Union Electric Company requested relief from 10 CFR 50.55a to extend the current 10-year interval for the 10-year inservice inspection program to accommodate plans to replace the steam generators at the Callaway Plant in Refueling Outage 14, which is scheduled for the Fall of 2005. In the letter dated October 18, 2004 (ULNRC-05064), this request was withdrawn. In the letter, it was stated that Union Electric Company intended to take the one-year extension for the 10-year interval which is allowed by 10 CFR 50.55a and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code of record for the Callaway Plant. Any further requests for relief, if required, would be submited on a case-by-case basis.

Based on the letter of October 18, 2004, we have closed out our review of the above relief request and TAC No. MC3764 is closed.

Sincerely,

/RA/

Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page

November 10, 2004 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - WITHDRAWAL OF RELIEF REQUEST TO EXTEND SECOND INSERVICE INSPECTION PROGRAM 10-YEAR INTERVAL (TAC NO. MC3764)

Dear Mr. Randolph:

By letter dated July 6, 2004 (ULNRC-05024), Union Electric Company requested relief from 10 CFR 50.55a to extend the current 10-year interval for the 10-year inservice inspection program to accommodate plans to replace the steam generators at the Callaway Plant in Refueling Outage 14, which is scheduled for the Fall of 2005. In the letter dated October 18, 2004 (ULNRC-05064), this request was withdrawn. In the letter, it was stated that Union Electric Company intended to take the one-year extension for the 10-year interval which is allowed by 10 CFR 50.55a and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code of record for the Callaway Plant. Any further requests for relief, if required, would be submited on a case-by-case basis.

Based on the letter of October 18, 2004, we have closed out our review of the above relief request and TAC No. MC3764 is closed.

Sincerely,

/RA/

Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:

PUBLIC RidsNrrDlpmLpdiv (HBerkow) cc: See next page PDIV-2 Reading RidsNrrDlpmLpdiv2 (RGramm)

RidsNrrPMJDonohew RidsNrrLAEPeyton RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenter (DGraves)

TChan DNaujock ACCESSION NO.: ML043170470 NRR-106 OFFICE PDIV-2/PM PDIV-2/LA EMCB-B/SC PDIV-2/SC NAME JDonohew:mp EPeyton TChan RGramm DATE 11/9/04 11/9/04 11/9/04 11/10/04 DOCUMENT NAME: E:\\Filenet\\ML043170470.wpd OFFICIAL RECORD COPY

Callaway Plant, Unit 1 cc:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 Mr. Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. Chris Younie Manager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, MO 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Ronald A. Kucera Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Mr. Keith D. Young Manager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109