Table 3.2.1 Instrumentation That Initiates Primary Containment Isolation Functions Function Trip Settings Total No. of Instrument Min. No. of Operable Required Channels Per Trip System or Operating Instru- Conditions*

ment Channels Per Trip System (1, 2)

1. Main Steam and Recirc Sample Line (Group 1)
a. Low Low Reactor Water Level  ;-48" 2 2 A
b. High Flow In Main Steam Line 5140% rated 8 8 A
c. High temp. in Main Steam Line s200OF 8 2 of 4 in each A Tunnel of 2 sets
d. Low Pressure in Main Steam 2 825 psig 2 2 B Line (3)
2. RHR System, Drywell, Sump, TIP (Group 2)
a. Low Reactor Water Level 7"2 2 C 3.2/4.2 49 Amendment No. 83,-102, 128, 140

Table 3.2.1 (Continued)

NOTES: (Continued)

  • Required conditions when minimum conditions for operation are not satisfied.

A. Group 1 isolation valves closed.

B. Reactor Power on IRM range or below and reactor in startup, refuel, or shutdown mode.

C. Isolation Valves closed for: Shutdown Cooling System.

I D. Comply with Condition C. above.

E. Isolation Valves closed for: Reactor Cleanup System.

F. HPCI steam line isolated. (See specification 3.5 for additional requirements.)

G. RCIC steam line isolated.

    • Function changed from Low Reactor Water Level to Low Low Reactor Water Level following completion of design change.

Function changed from 5150,000 lb/hr, *60 second delay, and *300,000 lb/hr, instantaneous, isolation to 5300/000 lb/hr, *7 second delay, isolation following completion of design change.

3.2/4.2 51 a Amendment No. 44, 140

Table 3.2.4 Instrumentation That Initiates Reactor Building Ventilation Isolation And Standby Gas Treatment System Initiation Minimum No. of Total No. of Min. No. of Operable or Operable or Operating Instrument Channels Operating Instrument Required Function Trip Settings Trip Systems Per Trip System Channels Per Trip System Conditions*

1. Low Low Reactor Water 2 -48" 2 2 2 (Notes 1, 2, 3) A. or B.

Level

2. High Drywell Pressure s 2 psig 2 2 2 (Notes 1, 2, 3) A. or B.
3. Reactor Building Plenum S1 00 mR/hr 2 2 2 (Notes 1, 2) A. or B.

Radiation Monitors

4. Refueling Floor S1 00 mR/hr 2 2 2 (Notes 1, 2) A. or B.

Radiation Monitors Notes:

(1) There shall be two operable or tripped Trip Systems for each function. An Instrument Channel may be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for performance of required surveillances without placing the Trip System in the tripped condition provided that at least one other OPERABLE Channel in the same Trip System is monitoring that parameter.

(2) Upon discovery that minimum requirements for the number of operable or operating Trip Systems or Instrument Channels are not satisfied action shall be initiated as follows:

(a) With one Instrument Channel per Trip System inoperable:

1) For Functions 1 or 2, place the inoperable Channel or Trip System in the tripped condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
2) For Functions 3 or 4, place the inoperable Channel in a downscale trip condition, or place the Trip System in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

--OR--

3.2/4.2 59 Amendment No. 10, 71, 91, 103, 128, 140

Notes: (cont'd)

(b) With more than one Instrument Channel per Trip System inoperable:

1) For Functions 1 or 2, immediately satisfy the requirements by placing the appropriate Channels or Trip Systems in the tripped condition,
2) For Functions 3 or 4, immediately proceed to Note 2c

--OR --

(c) If (a) or (b) cannot be met, then place the plant under the specified required conditions using normal operating procedures.

(3) Need not be operable when primary containment integrity is not required.

  • Required Conditions when minimum conditions for operation are not satisfied.

A. The reactor building ventilation system isolated and the standby gas treatment system operating.

B. Establish conditions where secondary containment is not required.

3.2/4.2 59a Amendment No. 403, 140