|
---|
Category:Technical Specifications
MONTHYEARML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22318A2152022-12-27027 December 2022 Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank ML21148A2742021-07-12012 July 2021 Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20352A3492021-01-0808 January 2021 Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML19176A4212019-08-29029 August 2019 Issuance of Amendment No. 203 Adoption of 10 CFR 50.69 ML19162A0932019-07-30030 July 2019 Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - Operating ML18291B2142018-11-26026 November 2018 Issuance of Amendment Adoption of TSTF-551 Revise Secondary Containment Surveillance Requirements L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.12018-11-12012 November 2018 License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements2018-07-0303 July 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML17346A0852017-12-12012 December 2017 Final Pre-App TS Markups ML17250A8712017-09-0707 September 2017 MNGP TSTF-542 TS Draft Markups ML17250A8702017-09-0707 September 2017 MNGP TSTF-542 Draft Variations ML17172A4312017-06-23023 June 2017 Correction of Amendment No. 194, Issuance of Amendment to Adopt F Tstf 545, Revision 3, Ts Inservice Testing Program Removal & Clarify Sr Usage Rule Application to Section 5.5 Testing ML17123A3212017-06-16016 June 2017 Issuance of Amendment Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing ML15335A4932015-11-20020 November 2015 Technical Requirements Manual, Revision 17 L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-09-0202 September 2015 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure ML15072A1412015-06-0505 June 2015 Issuance of Amendment No. 188 Regarding Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methods L-MT-15-043, Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-05-29029 May 2015 Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure ML15110A2802015-04-15015 April 2015 Operating License and Technical Specifications ML14323A0332015-01-0808 January 2015 Issuance of Amendment No. 187 Regarding Revision to TS 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing ML14281A3182014-11-25025 November 2014 Issuance of Amendment Regarding Reduction in Steam Dome Pressure Safety Limit L-MT-14-088, Areva Atrium 10XM Fuel Transition License Amendment Request Supplement2014-11-11011 November 2014 Areva Atrium 10XM Fuel Transition License Amendment Request Supplement ML14246A4492014-11-0303 November 2014 Issuance of Amendment to Revise TS 3.5.1, ECCS - Operating L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification2014-05-30030 May 2014 License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification ML14035A2482014-03-28028 March 2014 Issuance of Amendment No. 180 to Implement Maximum Extended Load Line Limit Analysis Plus (Mellla+) Operating Domain ML14072A3902014-03-13013 March 2014 License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification ML13218A0612014-01-28028 January 2014 Issuance of Amendment No. 178 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML13316B2982013-12-0909 December 2013 Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate ML13168A3732013-08-28028 August 2013 Issuance of Amendment No. 175 to Make Minor Corrections and Editorial Changes, Clarify Fuel Storage Capacity, and Remove Obsolete Information ML13168A2192013-08-0909 August 2013 Issuance of Amendment No. 174 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology2013-07-15015 July 2013 License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology ML13189A1942013-06-27027 June 2013 Operating License and Technical Specifications Updating Instructions L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2013-04-19019 April 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs L-MT-12-076, License Amendment Request for Fuel Storage Changes2012-10-30030 October 2012 License Amendment Request for Fuel Storage Changes L-MT-12-071, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2012-09-18018 September 2012 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. L-MT-12-055, License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial Changes2012-08-21021 August 2012 License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial Changes L-MT-12-051, License Amendment Request: Remove Degraded Voltage Transfer to the 1AR Transformer2012-05-25025 May 2012 License Amendment Request: Remove Degraded Voltage Transfer to the 1AR Transformer L-MT-12-028, License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass Timer2012-04-0505 April 2012 License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass Timer ML12083A2522012-03-22022 March 2012 Enclosure 2 - Monticello Nuclear Generating Plant Technical Requirements Manual Revision 10 L-MT-11-022, 002 Monticello - Technical Requirements Manual, Revision 72011-04-27027 April 2011 002 Monticello - Technical Requirements Manual, Revision 7 L-MT-09-047, Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff Comments2009-08-31031 August 2009 Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff Comments L-MT-09-020, License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation2009-05-29029 May 2009 License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation L-MT-09-041, Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function2009-04-0202 April 2009 Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function ML0834406812009-01-30030 January 2009 (Mngp), License Amendment No. 159 Regarding the Power Range Neutron Monitoring System L-MT-08-012, License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-04-22022 April 2008 License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process L-MT-08-013, License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2008-04-0404 April 2008 License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0810101932008-03-31031 March 2008 Monticello, License Amendment Request: Extended Power Uprate ML0802806012008-01-30030 January 2008 Technical Specifications 2024-10-01
[Table view] |
Text
Table 3.2.1 Instrumentation That Initiates Primary Containment Isolation Functions Function Trip Settings Total No. of Instrument Min. No. of Operable Required Channels Per Trip System or Operating Instru- Conditions*
ment Channels Per Trip System (1, 2)
- 1. Main Steam and Recirc Sample Line (Group 1)
- a. Low Low Reactor Water Level ;-48" 2 2 A
- b. High Flow In Main Steam Line 5140% rated 8 8 A
- c. High temp. in Main Steam Line s200OF 8 2 of 4 in each A Tunnel of 2 sets
- d. Low Pressure in Main Steam 2 825 psig 2 2 B Line (3)
- 2. RHR System, Drywell, Sump, TIP (Group 2)
- a. Low Reactor Water Level 7"2 2 C 3.2/4.2 49 Amendment No. 83,-102, 128, 140
Table 3.2.1 (Continued)
NOTES: (Continued)
- Required conditions when minimum conditions for operation are not satisfied.
A. Group 1 isolation valves closed.
B. Reactor Power on IRM range or below and reactor in startup, refuel, or shutdown mode.
C. Isolation Valves closed for: Shutdown Cooling System.
I D. Comply with Condition C. above.
E. Isolation Valves closed for: Reactor Cleanup System.
F. HPCI steam line isolated. (See specification 3.5 for additional requirements.)
G. RCIC steam line isolated.
- Function changed from Low Reactor Water Level to Low Low Reactor Water Level following completion of design change.
Function changed from 5150,000 lb/hr, *60 second delay, and *300,000 lb/hr, instantaneous, isolation to 5300/000 lb/hr, *7 second delay, isolation following completion of design change.
3.2/4.2 51 a Amendment No. 44, 140
Table 3.2.4 Instrumentation That Initiates Reactor Building Ventilation Isolation And Standby Gas Treatment System Initiation Minimum No. of Total No. of Min. No. of Operable or Operable or Operating Instrument Channels Operating Instrument Required Function Trip Settings Trip Systems Per Trip System Channels Per Trip System Conditions*
- 1. Low Low Reactor Water 2 -48" 2 2 2 (Notes 1, 2, 3) A. or B.
Level
- 2. High Drywell Pressure s 2 psig 2 2 2 (Notes 1, 2, 3) A. or B.
- 3. Reactor Building Plenum S1 00 mR/hr 2 2 2 (Notes 1, 2) A. or B.
Radiation Monitors
- 4. Refueling Floor S1 00 mR/hr 2 2 2 (Notes 1, 2) A. or B.
Radiation Monitors Notes:
(1) There shall be two operable or tripped Trip Systems for each function. An Instrument Channel may be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for performance of required surveillances without placing the Trip System in the tripped condition provided that at least one other OPERABLE Channel in the same Trip System is monitoring that parameter.
(2) Upon discovery that minimum requirements for the number of operable or operating Trip Systems or Instrument Channels are not satisfied action shall be initiated as follows:
(a) With one Instrument Channel per Trip System inoperable:
- 1) For Functions 1 or 2, place the inoperable Channel or Trip System in the tripped condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
- 2) For Functions 3 or 4, place the inoperable Channel in a downscale trip condition, or place the Trip System in the tripped condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
--OR--
3.2/4.2 59 Amendment No. 10, 71, 91, 103, 128, 140
Notes: (cont'd)
(b) With more than one Instrument Channel per Trip System inoperable:
- 1) For Functions 1 or 2, immediately satisfy the requirements by placing the appropriate Channels or Trip Systems in the tripped condition,
- 2) For Functions 3 or 4, immediately proceed to Note 2c
--OR --
(c) If (a) or (b) cannot be met, then place the plant under the specified required conditions using normal operating procedures.
(3) Need not be operable when primary containment integrity is not required.
- Required Conditions when minimum conditions for operation are not satisfied.
A. The reactor building ventilation system isolated and the standby gas treatment system operating.
B. Establish conditions where secondary containment is not required.
3.2/4.2 59a Amendment No. 403, 140