ML043070283

From kanterella
Jump to navigation Jump to search

TS Pages 3/4 7-6 as Modified by Amendment 156
ML043070283
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/29/2004
From:
NRC/NRR/DLPM
To:
References
TAC MC1653
Download: ML043070283 (1)


Text

PLANT SYSTEMS 3/4.7.2 CONTROL ROOM EMERGENCY FILTRATION SYSTEM LIMITING CONDITION FOR OPERATION 3.7.2 Two independent control room emergency filtration system subsystems shall be OPERABLE with each subsystem consisting of:

a) One control room supply unit, b)

One filter train, and c)

One control room return air fan.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3, and *.

ACTION:

a.

In OPERATIONAL CONDITION 1, 2 or 3, with one control room emergency filtration subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

In OPERATIONAL CONDITION *:

I

1.

With one control room emergency filtration subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 7 days or initiate and maintain operation of the OPERABLE subsystem in the pressurization/recirculation mode of operation.

2.

With both control room emergency filtration subsystems inoperable, suspend handling of recently irradiated fuel in the secondary containment and operations with a potential for draining the reactor vessel.

c.

The provisions of Specification 3.0.3 are not applicable in Operational Condition *.

SURVEILLANCE REQUIREMENTS 4.7.2 Each control room emergency filtration subsystem shall be demonstrated OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air temperature is less than or equal to 85'F.

b.

At least once per 31 days on a STAGGERED TEST BASIS by initiating, from the control room, the control area chilled water pump, flow

'This does not require starting the non-running control emergency filtration subsystem.

HOPE CREEK 3/4 7-6 Amendment No. 156 Corrected by letter dated O c t o b e r 2 9, 2 0 0 4