|
---|
Category:License-Operator
MONTHYEARML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03
[Table view] |
Text
October 28, 2004 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -
VERMONT YANKEE
Dear Mr. Thayer:
In telephone conversations on October 26, 2004, between Mr. John Caruso, Senior Examiner/Inspector, and Mr. Mike Gosekamp, Superintendent of Operations Training, arrangements were made for the administration of licensing examinations at Vermont Yankee, during the week of January 31, 2005.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by November 17, 2004. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by approximately for the operating tests and by December 15, 2004 for the written examinations. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
Mr. Jay K. Thayer 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http:/www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Gosekamp has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact John Caruso at (610) 337-5389, or me at (610) 337-5183.
Sincerely,
/RA/ RCrlenjack for Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-271 License No. DPR-28
Mr. Jay K. Thayer 3 cc w/encl:
M. R. Kansler, President, Entergy Nuclear Operations, Inc.
G. J. Taylor, Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President and Chief Operating Officer D. L. Pace, Vice President, Engineering B. OGrady, Vice President, Operations Support J. M. DeVincentis, Manager, Licensing, Vermont Yankee Nuclear Power Station Operating Experience Coordinator - Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety Assurance M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
J. M. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.
S. Lousteau, Treasury Department, Entergy Services, Inc.
Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
D. R. Lewis, Esquire, Shaw, Pittman, Potts & Trowbridge G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)
D. Katz, Citizens Awareness Network (CAN)
R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Sniezek, PWR SRC Consultant R. Toole, PWR SRC Consultant M. Desilets, Manager - Training and Development
Mr. Jay K. Thayer 4 Distribution w/encl: (via E-mail)
S. Collins, RA J. Wiggins, DRA C. Anderson, DRP D. Florek, DRP J. Jolicoeur, RI OEDO J. Clifford, NRR R. Ennis, PM, NRR V. Nerses, Backup PM, NRR D. Pelton, DRP, Senior Resident Inspector A. Rancourt, DRP, Resident OA T. Kim, Director, DOC J. Caruso, DRS, Chief Examiner C. Bixler, DRS (OL Facility File)
R. Conte, DRS Region I Docket Room (with concurrences)
S. Glenn, INPO (GlennSG@Inpo.org)
DOCUMENT NAME:E:\Filenet\ML043020514.wpd ADAMS PKG: ML042440154 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBixler JCaruso RJConte DATE 10/28/04 10 /28/04 10/28/04 OFFICIAL RECORD COPY