Response to Withdrawal of Request for Amendments
ML043010514
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/20/2004
From: Rosalyn Jones
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MB5361, TAC MB5362, TAC MB5363
Download: ML043010514 (7)


Text

Duke RON A. JONES Powere Vice President Oconee Nuclear Site A Duke Energy Company Duke Power ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3158 October 20, 2004 864 885 3564 fax U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Duke Energy Corp6ration Oconee Nuclear StMion, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 Response to Withdrawal of Request for Amendments (TAC NOS.

MB5361, MB5362, and MB5363)

References:

(1) Letter from Ronald A. Jones (Duke) to U. S. Nuclear Regulatory Commission," Oconee Nuclear Station, Units 1, 2, and 3; Docket Numbers 50-269, 50-2V0, and 50-287; Withdrawal of License Amendment Request to Fully Credit the Standby Shutdown Facility and to Eliminate Crediting the Spent Fuel Pool to High Pressure Injection System Flow Path for T~rnado Mitigation," dated September 9, 2004 (2) Letter from Leonard O

Qlshan (NRC) to Ronald A. Jones (Duke),

"Oconee Nuclear Station, Units 1, 2, and 3 - Withdrawal of Request for Amendments (TAC NOS.,MB5361, MB5362, and MB5363)," dated September 22, 2004 In Reference 1, Duke Energy Corporatic n (Duke) withdrew a license amendment request (LAR) that proposed to revise th`e Updated Final Safety Analysis Report to eliminate crediting the Spent Fuel Pool to High Pressure Injection pump flow path as one of the sources of primary system makeup following a tornado event. In addition, the LAR proposed to fully protect the Standby Shutdown Facility (SSF) by hardening vulnerable areas of the West Penetratiori (WP) and Cask Decontamination (CD) room walls from tornado missiles.

By letter dated September 22, 2004 (Reference 2), the NRC requested that within 30-days of the letter, Duke provide its plans, including a proposed schedule, to the issues outlined in the letter. In the letter, the Staff noted that this additional information was necessary in order to determine whetherithe plans and actions to correct the tornado mitigation strategy would be appropriate bnd timely.

The primary reason for the withdrawal was attributed to cost estimate uncertainties associated with the hardening of the WP/CD room walls. These significant cost estimate increases rendered this option very unattractive due to its high cost and low risk benefit.

As a result, it was decided to withdraw the current LAR and to place this modification "on hold" in order to work through all of the existing structure design limitations and to obtain more realistic implementation costs. The hardening of the WP/CD room walls remains an option, however, in conjunction with the modification, Duke is also evaluating the use www. dukepower. corn

U. S. Nuclear Regulatory Commission October 20, 2004 / Page 2 of the TORMIS methodology which, if found acceptable by the Staff, would significantly reduce the magnitude of the fortification required to harden the structure. NRC approval of the TORMIS option would be required prior to completion of the conceptual study (see proposed schedule in the enclosure).

Duke is also developing and considering options that would have a higher risk reduction benefit to cost ratio than the originally proposed changes. If possible, plant changes will be bundled to produce a significant reduction in risk across a number of design basis events. A list of options will be developed by mid-November 2004. See the "other options" column in the enclosure for additional information.

In addition, Duke's PRA group has continued to identify conservatisms and incorporate improvements to the PRA model since the original submission of the LAR in June 2002.

Incorporation of these improvements have resulted in a decrease in the tornado core damage frequency (CDF) compared with the LAR results. Current PRA tornado results are consistent with the level of risk reported in earlier Rev. 2 Oconee PRA and Oconee IPEEE studies (specific details are given in the Enclosure). These activities further demonstrate Duke's continuing commitment and efforts toward improved nuclear safety and addressing uncertainties associated with the assessment of tornado risk. Oconee's current risk contribution is acceptably\\low with additional analysis improvements planned.

It is important to note that the original SFP-HPI flowpath white finding (subsequently closed as a result of the LAR submittal) was limited to a Unit 1 reactor coolant pump (RCP) seal LOCA event. This condition also existed for Units 2 and 3, but because these RCP seals had already been upgraded with more reliable seals, the NRC determined these findings to be green.- Consequently, since the Unit 1 RCP seals were upgraded in late 2000, the risk condition associated with the white finding condition no longer exists. Therefore, Duke asserts that the unresolved issues associated with this function are of very low safety significance and do not warrant reopening the original white finding as a result of the LAR withdrawal.

Duke remains fully committed and focused on improving tornado defense-in-depth at Oconee and recognizes that clarifications to the current licensing basis will also be necessary to remove ambiguities. As such, Duke plans to discuss our current plans in more detail with the Staff at a meeting scheduled for November 16, 2004, and to provide periodic updates to the Staff, on a quarterly basis, as additional information becomes available.

U. S. Nuclear Regulatory Commission October 20, 2004 / Page 3 Please de ny questions or requests for additional information to Stephen C.

New n, 0 nee Regulatory Compliance Group, at (864) 885-4388.

nal Jones Site Vice President Enclosure

U. S. Nuclear Regulatory Commission October 20, 2004 / Page 4 xc:

W. D. Travers, Regional Administrator U.S. NRC, Region II Atlanta Federal Center 61 Forsyth St., SW., Suite 23T85 Atlanta, GA 30303 Leonard N. Olshan, Sr. Project Manager, Division of Licensing Project Management U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 M. C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station

Enclosure Response to Withdrawal of Request for Amendments (TAC NOS. MB5361, MB5362, and MB5363)

U. S. Nuclear Regulatory Commission October 20, 2004 / Enclosure / Page 2

1.

NRC Review Issues As described in the NRC's September 22, 2004 withdrawal letter (Reference 2), the issues raised during the Staff s LAR review are generally specific to the proposed change from the withdrawn amendment request. If applicable, these issues will be addressed in the subsequent LAR.

II.

Proposed schedule WP/CD' Date Harden WPICD Wall TORMIS' Other Options Option

'Evaluation October 25 -

Comprehensive November 5, design basis 2004:

review meeting November RFQ submitted 2004 December Award study contract Complete Concepts 2004 TORMIS presentation to analysis plant mgmt.

January 2005 Concept approved by plant mgmt.

April 2005 Complete concept study TORMIS LAR submitted July 2005 Feasibility study completed March 2006 Detailed scoping and cost estimate completed June 2006 LAR submitted for this option July 2006 Detailed scoping and cost estimate completed October 2006 LAR submitted for this option Ill.

Current Status of Tornado Risk:

Since the June 2002 LAR submittal, Duke has continued work on several important analysis improvements and physical plant upgrades. First, an updated Oconee tornado missile (TORMIS) model was developed to evaluate the missile damage frequency of the Unit 3 Control Room North Wall. This model update also incorporated a more detailed and less conservative treatment of the Borated Water Storage Tank (BWST) than used in the IPE model. This change resulted in a significantly lower estimate of the

U. S. Nuclear Regulatory Commission October 20, 2004 / Enclosure / Page 3 BWST failure frequency (approximately a factor of 5 lower) as compared to earlier results presented to the Staff (

Reference:

Duke response to NRC Request for Additional Information, Question No. 3, dated January 29, 2003).

Therefore, the perceived importance of the spent fuel pool to high pressure injection pump suction path has decreased significantly.

Second, Oconee has replaced its original Steam Generators with new replacement steam generators. Unit 1 replacement was completed in December 2003 and Unit 2 replacement was completed in June 2004. Unit 3 replacement outage began October 9, 2004 with completion expected in December 2004. Important improvements with the new steam generators are increased capacity to withstand compressive tube loads and additional secondary-side coolant volume. Updated thermal-hydraulic analysis has shown that the additional coolant volume provides significantly longer time to recover emergency feedwater or standby shutdown facility auxiliary service water (SSF ASW) prior to liquid relief on the pressurizer safety valves (or power operated relief valves),

and more time prior to core uncovery. This additional time has resulted in a significant reduction in the human error probabilities for recovery of the turbine-driven emergency feedwater pump (manual start) and recovery of secondary side heat removal using the SSF ASW system. This change produces a significant reduction in tornado CDF as well as overall plant CDF.

Third, Duke has also recently incorporated a human error dependency analysis model for the Oconee PRA. This was a major analysis effort that addresses a key PRA quality issue for the Oconee PRA identified in the Oconee PRA Peer Review. Incorporation of this methodology produces a higher overall CDF, but reduces a significant source of modeling uncertainty with earlier PRA results.

The overall effect of the changes described above is a net decrease in the Oconee tornado CDF. The current unit 3 tornado CDF is 1.4E-05 compared to the previous value of 2.1 E-05 reported in the withdrawn LAR and a value of 1.4E-05 from Revision 2 of the Oconee PRA.

It is also noteworthy that additional risk reduction will be achieved in the Oconee PRA results by incorporating the Combustion Engineering Owners Group Seal loss-of-coolant model which is applicable to the current Oconee reactor coolant pump seal design.

From recent discussions with the Staff on this subject, approval of this analysis methodology is nearly complete.