ML042990112
| ML042990112 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/10/2002 |
| From: | - No Known Affiliation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2003-0224 CR 02-01523 | |
| Download: ML042990112 (2) | |
Text
NOP LP-2001-01 Davis-Besse CON DITION REPORT 02-01523r
.0200D523 TITLE: RCP 1-1 AND RCP 1-2 LEAKAGE AT GASKET DRAIN LINES DISCOVERY DATE TIME I EVENT DATE TIME SYSTEM I ASSET#
211612002 2100 2116/02 2100 064-03 P36-1, P36-2 EQUIPMENT DESCRIPTION Reactor Coolant Pump 1 and 2 DESCRIPTION OF CONDITION and PROBABLE CAUSE (if known) Summarize any attachments. Identify what, when, where, why, how.
O During the performance of DB-PF-03065, Pressure and Augmented Leakage Test, inner casing R
gasket leakage was observed from RCP I and ROP 2 via the respective casing gasket collection system. This is a drain line between the inner and outer casing gaskets. The intent of the pressure G;
test is to verify an operable leakage collection system. This was acceptable, however leakage was I
observed.
N Inner gasket leakage on RCP 1-1 was.01 gpm and on RCP 1-2 was.03 gpm. This condition does A
not reflect actual leakage because a visual examination of all RCP casing bolting indicated no T
6xternal leakage or boric acid residue. Note: This test occurred at a RCS pressure of 893 psig I
during RCS shutdown. The system was in a temperature transient See Work Order 01 -01308, O
performed on 2125102, for documentation of visual examination. Similar leakage via the leakage N
collection pathway was observed in 12RFO.
This correction report Is being generated to ensure adequate review of this leakage, to address operational readiness issues, and to justify/plan RCP inner and outer gasket replacement. To date, there are no operability issues associated with this leakage.
IMMEDIATE ACTIONS TAKEN I SUPV COMMENTS (Discuss CORRECTIVE ACTIONS completed, basis for closure.)
N/A QUALITY ORGANIZATION USE ONLY IDENTIFIED BY (Check one)
G Self-Revealed ATTACHMENTS Quality Org. Initiated L] Yes 6
Individual/Work Group Li Internal Oversight Quality Org. Follow-up
] Yes O No
[]
Supervision[Management 0 Extemal Oversight
- i.
!Yes N"! No O6RIGINATOR ORGANIZATION IDATEE-SUPERVISOR i
DQAT-PHO'NE'EX'T.
SENIUK, P 1
PE J4/1012002 1GALLATIN, B l
4110/2002 j7846 S RO EQ UI PM E NT E VA L UA TI ON IM ME DI ATE OR GA NI ZA TI ON I M OD EC HA N GE P
REVIEW OPERABLE REQUIRED INVESTIGATION REQUIRED NOTIFIED RESTRAINT L
E3Yes l No L Yes I No D NIA Yes I No Li Yes R No NIA l E
]Yes L No A
MODE ASSOCIATED TECH SPEC NUMBER(S)
ASSOCIATED LCO ACTION STATEMENT(S)
T
- 2 O
DECLARED INOPERABLE REPORTABLE?
One Hour N/A I APPLICABLE UNIT(S)
(Date I Time) 1 e
3 Fbii e
E 4/101021800 Right Hour F/d U1 R
--EVal Required otttf-i A
COMMENTS T
This is a Mode 4 restraint and will be tracked under Tech Spec 3.4.6.2.
Current Mode - Unit 1 Power Level - Unit jI Current Mode-Unit 2 Power Level - Unit 2 S
6 0%
SRO - UNIT I SRO - UNIT 2 DATE Patrick, R Baldwin. J 4/10/2002 Page 1 of 2 C,
/
NOP-LP-2001 01 Davis-Besse CON DITION REPO RT CRNme TITLE:
RCP 1-1 AND RCP 1-2 LEAKAGE AT GASKET DRAIN LINES CATEGORY IEVAL ASSIGNED ORGANIZATION DUE DATE R REPORTABLE?
CA CH 2/2812003 E
Ys I3 No L LER No.
CRPA TREND CODES Comp Type I ID Cause U REPORTABILIlY REVIEWER I
Process I Activity I Cause Code(s)
(If Cause T or W)
Org A Wolf. G SUPV HDW 0575 TOO M
68 NONE.-
r I
R 'DATE MRB-.
Y-04/15102 INVESTIGATION OPTIONS CLOSED BY IDATE
- -JGeneric Implicatloris
[iPart 21 EMaintRule R3OEEvaluation l
Page 2 of 2