QOOL(.I.A/b From:
<DSTRAKA@ap
.com>
To:
<atg@nrc.gov>
Date:
6/29/04 2:20PM A'
Subject:
AlT2004.xls Revised asd 6/29/2004 @ 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> Action #
NRC Requester PV Respondent Request Closed With Request Date Status I
Gody Straka Phone list of Entrance Attendance roster Phone numbers provided 6/15/2004 CLOSED 2
Gody Oakes Provide Copies of documents requested by N.
Salgado Raw Data Copies provided 6/15/2004 @ 3:30 PM by Vogt 6/15/2004 CLOSED 3
Gody STA-D. Fan Trip time lines for all three units(Taylor) and offisite activities (Mueller) Drafts Provided 6/15/2004 CLOSED 4
Gody Taylor Names of crews on shift in all three Units and their availability for being interviewed All crew members are available until Thursday 6/15/2004 CLOSED 5
Gody Leake Copy of the Electric ISO both hard copy and electronic Closed to #12 6/15/2004 CLOSED 6
Gody Crozier Timeline for e-plan activities Provided 6/15/2004 CLOSED 7
Gody Straka 90DP-01P06 - provide copy Copy provided 6/15/2004 6/15/2004 CLOSED 8
Gody & Team Leake Preliminary briefing of Offsite failure Briefing held 6/15/@ 12:30 pm 6/15/2004 CLOSED 9
Skinner Paramithas Digital pictures of the failed bell string insulator string, especially any failure areas. If potential sabotage is suspected (or is obvious) such as a gun shot, have the proper authorities been conducted?
pictures provide hard copy and electronically -6/16/2004 6/15/2004 CLOSED 10 Skinner Paramithas Digital pictures of the failed AR relay, especially any failure areas (the open contacts, etc.). Any apparent cause and past maintenance, etc.
pictures provide hard copy and electronically -6/16/2004 6/15/2004 CLOSED 11 Skinner Paramithas Traces showing time steps of failures Not Needed 6/15/2004 CLOSED 12 Gody Leake Copies of switch yard and connecting systems schematics-Electronic Copies Provided Copies provided 6/15/2004 hard copy 6/15/2004 CLOSED 13 Skinner Paramithas 3 line diagram for switchyard and Need Hassayampa liberty line/WestWing Switchyard copies provided -6/16/2004 & Dwg G 33417 sheet 2 6/15/2004 CLOSED 0, Zit
14 Skinner Paramithas Breaker Schematic HassayampalLiberty/Westwing Typical is OK Package Provided 6/15/2004 CLOSED 15 Skinner Paramithas Breaker Schematic Switchyard Typical is OK Need Electronic Copy copies provided - 6/16/2004 Electronic Copy Provided 6/15/2004 CLOSED 16 Skinner Paramithas Graph(s) of the current flowing through each of the main lines and (hopefully, if available) each phase.
West Wing, etc. In other words current vs. time info for the lines out of Palo Verde.
Not Needed 6/15/2004 CLOSED 17 Skinner Paramithas The time of the Bay 7 mod implementation.
provided e-mail 6/1512004 CLOSED 18 Skinner Paramithas How many lines and distribution of estimated fault current feeds on Westwing Not Needed 6115/2004 CLOSED 19 Gody Paramithas Ownership, interface, and maintenance agreements on PVNGS Switch Yard Not Needed 6/15/2004 CLOSED 20 Skinner Leake Any 50.59s on the lines & isophase negative sequence modification Eval 00-00097 Modify Breaker Switches provided 6/15/2004 CLOSED 21 Koshy Kesler NRC meeting with APS Electric System Load Dispatcher Follow Up Meeting 6/18/2004 Meeting Held 6/18/2004 6/15/2004 CLOSED 22 Gody Taylor-Apparent cause for Unit 2 DG "A" see #38 6/15/2004 CLOSED 23 Gody Taylor List of quarantined equipment Unit I ADV-185 Unit 2 "E" Charging Pump (Released) Diesel "A" Unit 3 Steam Bypass Control Valve 1003 Steam Bypass Control System Cabinet 6/15/2004 CLOSED 24 Gody Winsor Product justifying Ul startup with the initiating offsite electrical power lost apparent cause NRC phone calls and data provided 6/15/2004 CLOSED 25 Skinner Straka Electronic copy of Time Line Still need final copy see #60 6/15/2004 CLOSED 26 Skinner Cooper Main Generator 3 line meter and relaying drawing Schematics for trips/alarms 2 copies provided &
Electronics 6/15/2004 CLOSED 27 Paulk Vogt Sequence of Events for unit trip does not go far enough back. Backup time line for grid issues. Negative Phase sequences sensed in house as a starting point Provided 6/15/2004 CLOSED 28 Skinner Leake Output from digital fault recorder for switch yard See RFI 11. This could be the same.
Provided 6/15/2004 CLOSED 29 Gody Kidd Copies of all CRDRs written since & just before the trip.
Copies provided to AIT 6/16/2004 6/15/2004 CLOSED 30 Alter Lee Copy of E-Plan table I for time to activate
ERO. Include who is required to activate. Lee Provided 6/15/2004 CLOSED 31 Alter Lee TSC Diesel operating procedure and PM task with last 2 PM's documentation. Lee Provided 6115/2004 CLOSED 32 Alter Leavitt Security Diesel operating procedure and PM task with last 2 PM's documentation. (Larry Leavitt)
Item complete, PM not required due to successful test run of DG 6/15/2004 CLOSED 33 Alter Leavitt Security Plan for description of Security Diesel and drawing. Leavitt Documents provided, discussions held to close questions -6/16/2004 6/15/2004 CLOSED 34 Alter Leavitt Security procedure for LOP. Leavitt Procedure provided and discussion held to cover questions - 6/16/2004.
6/15/2004 CLOSED 35 McConnell Straka Copies of 13-EMAA 001 Copies provided 6/16/2004 6/16/2004 CLOSED 36 Alter Leavitt/Lee Walkdown Diesels Security & TSC Walkdown 6/16/2004 AM 6/15/2004 CLOSED 37 Gody Straka e-mail Status Report - WAPA Liberty/Westwing and SRP Agua Fria/Westwing 230KV lines Copy provided 6/16/2004 6/16/2004 CLOSED 38 Paulk Holmes Briefing on U2 DGA trouble shooting. Was components recently replaced. Previous failures.
Meeting with Holmes/Payne. Failed diode. First time @ PVNGS. OE 1 1996 @ Grand Gulf.
Question on whether EWA pump that was sequenced on @ failure time was cause. Jim Moreland stated pump was sequenced on about 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after plant trips and operated satisfactorily.
6/16/2004 CLOSED 39 Paulk Bolf Scheduled @ 12:30 Meeting to discuss CH pump E U2 failure.
See new questions # 49 6/16/2004 CLOSED 40 McConnell Banks Numerous questions on UI & 3 trip data.
Questions answered during several interviews 6/16/2004 CLOSED 41 Paulk Oakes Numerous questions on U2 trip data. Include pressure plots for primary and secondary to determine if safeties lifted.
Information provided. New RFIs for additional information was opened 6/16/2004 CLOSED 42 Skinner Leake Walk through 3 line diagrams provided in item 26 above. This will satisfy both Skinner and Negative Sequencing crktltrip function questions from McConnell Meeting Holmes 6/17/2004 6/16/2004 CLOSED 43 Skinner Leake - Kessler Interconnection agreements &/or Letters of Understanding for managing electric loads in the PV area References 15 & 16 from 50.59 EOO-00097 2 Copies provided.
6/16/2004 CLOSED 44 Skinner Straka - Gregoire Provide any pending changes to the UFSAR chapter 8 Provided copy 6/16/2004 CLOSED
45 McConnell Vogt Scan frequency for PC alarm typer-printer Provided 6/16/2004 CLOSED 46 McConnell Vogt Provide Primary Pressure Plots for all 3 units Provided 6/16/2004 CLOSED 47 McConnell Leake See Item 42 above regarding negative sequencing Meeting Holmes 6/17/2004 6/16/2004 CLOSED 48 Paulk Straka Unit logs 0700-1000 hrs 6114/2004 copies of all three units provided -6/15/2004 6/16/2004 CLOSED 49 Paulk Bolf Effects of LOOP on CH Pump cooling system, Time pump was run with suction isolated, How long can pump run without suction, & performance testing performed to ensure pump is operable.
Four question response provided by B. Bolf.
6/16/2004 CLOSED 50 Alter Crozier 1/2 hour delay @ security headquarters during event. Delayed NRC and Operator response?
Issue discussed 6/16/2004 CLOSED 51 Gody Withers Did all three unit generators trip on negative sequence signals? Design of system and role in plant trips.
Meeting Holmes 6/17/2004 6/16/2004 CLOSED 52 Skinner Paramithas 4ODP-9OP34 Switchyard Administrative Control Copy provided 6/16/2004 CLOSED 53 McConnell Henry LOOP EOP & Gas Turbine emergency operation Copy provided 6/17/2004 CLOSED 54 Paulk Bolf Operation of Charging pump cooling and suction line up during this type of event Meetings with STA, Bolf &
Radspinner 6/16/2004 CLOSED 55 Paulk Grigsby Why was the CH Pump E U2 removed from quarantine list without an operability test or ST?
Meetings with STA, Bolf & Radspinner 6/17/2004 CLOSED 56 Paulk Samuels/Gouvier DG Sequencer loading discussion and DG loading calcs Meeting held 12:30 6/17 6/17/2004 CLOSED 57 Paulk Payne DG A U2 total run time 2325 hours0.0269 days <br />0.646 hours <br />0.00384 weeks <br />8.846625e-4 months <br /> 6/17/2004 CLOSED 58 McConnell Bolf Letdown fumes U1, fire? Source of fumes Post walkdown package provided See new 83 & 74 6/17/2004 CLOSED 59 McConnell Smyers Game Plan and any results for Ul ADV 185 Game plan provided. Results and apparent cause needed.
Residents 6/17/2004 OPEN 60 Skinner Paramithas Updated time line for off site events electronic Word Copy Due Monday or Tuesday AIT Team update electronic timeline provided 6/17/2004 CLOSED 61 McConnell Vogt Current bus voltages for all three units values provided 6/17/2004 CLOSED 62 Paulk Grigsby CRDR initiated on log entry on evaluation for not securing RCPs on low amps 6/15/2004 4:00 am CRDR 2716562 provided 6/17/2004 CLOSED 63 Gody Taylor Complete Post Trip data packages for all three
units.
Due Monday or Tuesday AlT Team - Copies of all three units sent 6/23/2004 by e-mail Straka to Gody 6/17/2004 CLOSED 64 Paulk Vogt Time line of specified equipment in U2 copies provided 6/17/2004 CLOSED 65 McConnell Vogt Time line of specified equipment in Ul
& 3 Information provided 6/17/2004 CLOSED 66 McConnell Shanker LOCV Chapter 15 event numbers vs. Ul & U3 actuals Copies provided.-
6/17/2004 CLOSED 67 Paulk Straka What recording systems do we use for Post Trip Data Data Provided 6/17/2004 CLOSED 68 Paulk Grigsby Why didn't OPS follow 40EP-9EO07 when lining up U2 CH pumps Per Jim Taylor this will be evaluated under CRDR 2716521 6/17/2004 CLOSED 69 Paulk Gaffney 10 minutes hold up of AO on CH pump U2 recovery. Why ? CRDR 2716521 Tim Heir RP CRDR 2716806 provided 6/17/2004 CLOSED 70 Koshy Kesler Meeting on operations interface with APS SRP Transmission meetings held on 6/17/ and 6/18 6/17/2004 CLOSED 71 McConnell Coppock Basis of GT starting for switch yard batteries, dwgs, Information Provided 6/17/2004 CLOSED 72 Gody Kidd CRDRs for Wednesday, Thursday, and Friday CRDRs provided 6/17/2004 CLOSED 73 McConnell Bolf Letdown line isolation failure 201 P/Q Radspinner held meeting with McConnell on 6/17/2004 Need evaluation of softparts subjected to high temperatures. Residents e-mail sent to N Salgado and Tony Gody 6/17/2004 CLOSED 74 Alter Crozier Potential for Fire response team to be held up during LOOPs in sally port Meeting held 6/18/2004 with L.
Leavitt 6/17/2004 CLOSED 75 McConnell Radspinner Potential for RCP Thermal Trip for lift pump motor Custudio held meeting Thermal Curve provided 6/17/2004 CLOSED 76 McConnell Clifton LPSI check valve V217 failure Meeting Held 6/17/2004 6/17/2004 CLOSED 77 McConnell Holmes Magna Blast Breakers S05D/S06K Apparent cause of failure Schroeder Residents 6/17/2004 OPEN 78 McConnell Coppock U3 SBCV 1003 & Cabinet failure Apparent Cause Coppock briefed McConnel On 6/17/2004. Residents.
6/17/2004 CLOSED 79 Alter Crozier interviews results for security access team Meeting on 6/17/2004 6117/2004 CLOSED 80 Alter Crozier System description of TSC diesel Meeting on 6/17/2004 6/17/2004 CLOSED 81 Alter Crozier Unit 2 Emergency coordinator procedures used on 6/14/2004 - need copy Meeting on 6/17/2004 6117/2004 CLOSED
82 Alter Crozier Copy of Instructions for SallyPort vehicle arm operations both old and New Meeting on 6117/2004 6/17/2004 CLOSED 83 Alter Crozier Response report on Smoke seen on the 134 foot valve gallery Scott Dodd to provide See 74 also.
Information provided. 6/17/2004 CLOSED 84 Alter Crozier Copy of the revised Auto Dialer procedure Meeting on 6/17/2004 6/17/2004 CLOSED 85 Skinner Cooper copies of one line diagrams of DI1 &
D12 back to power source and what are power sources to D1i & D12 and panel drawings for DII & D12 Copies Provided by Cooper 6/17/2004 CLOSED 86 Paulk Oakes Unit 2 PMS typer printout 0730 to 0930 4/14/2004 Documents provided, discussions held to close questions
- 6/18/2004 6/18/2004 CLOSED 87 Paulk Oakes ERFDADS Unit 2 neg Sequencer Provided 6/18/2004 CLOSED 88 Paulk Oakes U2 VCT Level Provided 6/18/2004 CLOSED 89 Paulk Coxon Did AO performing CH Pump U2 alternate suction actions have pages 1&2 of Appendix 10 See #68 Yes, # 68 covers procedure issue 6/18/2004 CLOSED 90 Paulk Oakes MAYS14 ERFDADS Reports Copy provided 6/18/2004 CLOSED 91 Gody Brutcher Effect of overflow condition of RCPs on core components Residents - Copy of Westinghouse letter dated 6/1812004 "PV04-107" provided to N. Salgado via e-mail 6/18/2004 CLOSED 92 Paulk Glover U3 Turbine overspeed Trip: Set points Mech &
Electrical overspeed trips, last time overspeed ST performed (E&M),
Testing time intervals, Copy of ST Meeting held 6/18/2004 6/18/2004 CLOSED 93 Paulk Schroeder Effect and evaluation of components that were connected & subjected to 67 Hz and plan to evaluate the equipment AIT Team 6/18/2004 OPEN 94 Paulk Vogt Did we have a DNBR trip on Unit 3 versus VOPT Meeting held FlodinNogt/Coppock Had VOPT trip 6/18/2004 CLOSED 95 Paulk Schroeder/ Flodin Data that determined 67 hz &
the 100 RPM RCP speed over nominal DFR data for Frequency plot provided CPC Buffer Data for Unit 3 provided for RCP speed 6/18/2004 CLOSED 96 McConnell Vogt Magna blast breakers failed to shut from the control room. How many attempts were made to close S06K 5 attemps to cycle remotely S05D 3 attemps to cycle remotely 6/18/2004 CLOSED 97 McConnell Holmes Magna blast breakers-Last maintenance performed See Engineering White Paper Rev. 1 6/18/2004 CLOSED 98 McConnell Smyers 5 A/B RK panels in unit 2 were all
lite. Apparent cause trouble shooting results Maner & Reynolds Unregulated power supply caused spiking. Readjust the power supply and possibly do a permanent mod.
6/18/2004 CLOSED 99 McConnell Flodin Graph of Plant Power vs RCP RPM Copy provided 6/18/2004 CLOSED 100 Koshy Kesler Could also provide me the frequency and voltage plot of the 500 KV system at the palo verde switchyard. (you gave me hard copy) Please give me an electronic version.
AIT TEAM Electronic version sent via e-mail from Kesler on 6/22/2004 6/22/2004 CLOSED 101 McConnell Clifton Provide CRDR 2715768 Copy provided 6/23/2004 6/23/2004 CLOSED 102 McConnell Clifton Provide Alarm Response procedure 40AL-9RK2B Copy provided 6/23/2004 6/23/2004 CLOSED 103 Gody Straka Provide copies of the Standard Post Trip reports for all three Units Copies e-mailed to Gody on 6/23/2004 6/22/2004 CLOSED 104 Gody Straka Teleconference for 6/24/2004 topics, Unit 3 SOE up to VOPT Trip and Borg Warner SI check valve seating quesitons Conference set for 0830 on 6/24/2004 Call completed-additional action RRI to follow 6/23/2004 CLOSED 105 Gody Straka Determine if 7/13/2004 is an acceptable date to hold Public Exit of AIT, location TBD APS finds 7/13/2004 acceptable 6/24/2004 CLOSED 106 Gody Straka Need copy of unit trips timelines - e-mail to Tony Gody Sent via e-mail 6/24/2004 6/24/2004 CLOSED 107 Gody Straka Provide latest version of RFI List to AIT Team, conduct call to re-zero list of action items called AIT -
Gody on 6/28/2004 left voice mail Review @1230 6/29/2004 suggested Meeting set-Management to attend as weill 6/24/2004 CLOSED 108 Gody Straka Set up teleconference call with Gary Andrews and Dan Holland to discuss Steam Bypass response in Unit 3 - would like call to be held 6/24/2004 Call held on 6/24/2004 at 8:30 6/24/2004 CLOSED 109 McConnell Hypse FSAR 10.2.2.3.1.4 Power/Load Unbalance.
Associated with the load control unit is a rate sensitive power/load unbalance circuit whose purpose is to initiate control valve fast closing action under load rejection conditions that might lead to rapid rotor acceleration and consequent over speed.
I am curious to find out if a power/load unbalance signal occurred, and if the system reacted as expected per the FSAR.
6/24/2004 OPEN 110 Paulk Hypse
- 1. In the original (initial) plant configuration what were the power sources for Steam Bypass Control for the preferred (non-vital) power to alternate, and was the alternate
power source vital (class) or another non-vital bus?
- 2. Under the Plant mod, the SBCS was changed from ABTs to static switches, were the power sources for the preferred and the alternate changed as well?
- 3. Are all three Units SBCS configurations the same, provide dates when the SBCS ABTs/static switches were installed in all three units?
E-mail sent 6/25/20041. The NORMAL power source at NNNDI1 (D12) has always been from NHNM13 (MID) and the EMERGENCY from PHAM31 (M32). At one time there was confusion as to which source was more reliable and the units were aligning the panels differently. Some were units had the ABT aligned to the Emergency source while others were aligned to the Normal. After the "Ring-Tailed cat" event in Unit 1 we decided to replace the switches and to align them to the Normal source since PVNGS had experienced several loss of off-site power events to either S05 or SOB.
- 2. The sources remained the same but the alignment changed. The Normal source was now the preferred source and the Emergency was the back-up.
This change came out of the ring-tailed cat event in Unit 1.
- 3. All the NNND11 and D12 switches have been replaced under DMWO 740601.
1ENNND11 DIWO 740602 03/98 1ENNND12 DIWO 740603 03/98 2ENNND1 I DIWO 740604 09/97 2ENNND12 DIWO 740605 09/97 3ENNND1 1 DIWO 740606 03/97 3ENNND12 DIWO 740607 03/97 6/24/2004 CLOSED Ill Skinner Straka e-mail GEORGESG@cs.COM system description of main generator protective relaying scheme e-mail George a copy of the STM on 6/24/2004 -waiting to see if this meets his needs 6/24/2004 OPEN 112 McConnell Straka - Powlikowski (1) it became apparent that the lift oil pumps were replaced with a different model than the original manufacturer.
Can you have someone track down the date of the modification?
(2) are the lub oil lift pumps to be running to enable the starting of the RCP?
more clearly: is the lube oil lift pump an enabling system for the RCP start circuit?
e-mail sent reference FSAR section 5.4.1.3 and included elementary diagaram 02-E-RCB-001 date sent is 6/25/2004 6/25/2204 CLOSED 113 Koshy Kesler (1) What I requested was the voltage during the event. Could you get me that?
Frequency and the voltage?
(2) Second subject:
Any progress on APS decision to install Zone 2 or ground fault
protection between 230 and 500kv at West Wing ?
E-mail sent 6/25/2004 6/25/2004 CLOSED 114 McConnell Bolf requesting information with regards to the Unit 2 letdown line.
Mark Brutcher, Doug Berg and myself conducted a conference call with Mr. McConnel to discuss the stress analysis allowables and the max stress that was identified during the analysis for the increased letdown temperature. Mr. McConnell requested, and has been faxed a copy of the current CRDR (#2715667), the applicable pages of the stress calculation, and the [SI inspection reports for the subsequent inspection of the purification filter cask.
Mark Brutcher, Doug Berg and myself conducted a conference call with Mr.
McConnel to discuss the stress analysis allowables and the max stress that was identified during the analysis for the increased letdown temperature. Mr. McConnell requested, and has been faxed a copy of the current CRDR (#2715667), the applicable pages of the stress calculation, and the ISI inspection reports for the subsequent inspection of the purification filter cask.
Date 6/23/2004 6/23/2004 CLOSED 115 Paulk Payne DG run time/diode clarification e-mail forwared to Gody on 6/25/2004 6/24/2004 CLOSED 116 McConnell Holmes Do PVNGS strip loads on the PK bus to meet/extend capacity of the batteries?
No, PVNGS do not strip loads on the PK bus to meettextend capacity. The batteries are sized to adequately perform the load profile (2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) of the worst case scenario for the batteries, provided answer 6/25/2004 6/25/2004 CLOSED 117 McConnell Holmes - Samuels Procedure 40EP-9EO10, Appendix 52, page 3 of 23, states "The GTGs can not supply Units 2 and 3 simultaneously but can supply Units 1 and 2 or Units 1 and 3." Tim requested clarification of this statement.
After researching Various documents and then talking to John Holmes I was prepared to give my answer to Dave Loveless, however, I was unable to contact him. I left him a voicemail with my name and phone number and that I will contact him on Tuesday(6/29/2004) with the answer to this question.
6/25/2004 OPEN 118 Paulk Hypse They asked why chapter 15 of the UFSAR stated that the SBCS is unavailable after a loss of offsite power. This does not appear to be the case in Unit 3?
625/2004 OPEN 119 120 121 122 123 124 125 126 127 128