ML042930826
| ML042930826 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse (NPF-003) |
| Issue date: | 03/10/2002 |
| From: | - No Known Affiliation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2003-0187, NOP-LP-2001-01 01-1191 | |
| Download: ML042930826 (1) | |
Text
C 4\\W-NOP-LP-2001-01 CONDITION REPORT CR Number TITLE: CROM NOZZLEJ -WELD CRAQKING INCONEL600 STRESS CORROSION IN0USTRYC 01-1191 DISCOVERY DATE TIME
,EENT DA TIME SYSTEM I ASSET#
5/2/2001 tiA 2
NIA 064-02 T1 EQUIPMENT DESCRIPTION Rect DESCRIPTION OF CONDITION and PROBABLE CAUSE (1f known) Summarize any attachments. Identify what, when, where, why, how.
The purpose of this CR is to identify the need to develop an Project Plan with team members and R
actions necessary to prepare Davis-Besse for a cracked CRDM J-groove weld. All three units at R
Oconee and and one unit at ANO have inspected for and found cracked J-groove welds arround their CRDM nozzles. These nozzles penetrate the reactor vessel head. This CR will provide the G
vehicle for formulating the inspection and repair plan for Davis-Besse during our next oulage. A i
Team will need to be put together to formulate the plan and implement the necessary actions to N
prepare Davis-Besse for this emerging industry issue. The Team should consist of Engineering, A
Maintenance, Outage Management, RP, Licensing and assigned a Project Manager to lead the T.. station through the necessary steps to be prepared for inspection and repair of the CRDM nozzles.
O SUPV COMMENTS IIMMEDIATE ACTIONS TAKEN (Discuss CORRECTIVE ACTIONS completed, basis for losure.)
N Recommend Outage Management take the lead on this CR. Outage Management can also integrate any actions the project team develops into the outage schedule.
QUALITY ORGANIZATION USE ONLY IDENTIFIED BY (Check one)
I2 SeHf-Revealed ATTACHMENTS Quatity Org. Initiated O Ys El IndiMdual/Work Group 0
Internal Oversight Quality Org. Follow-up Yes 0 No O Suwvslonfar4anagernent 0 External Oversight E Ye, El No ORIGINATOR ORGANIZATION I DATE SUPERV1SOR DATE PHONE EXT.
MCLAUGHLIN. M WC 5l22001 MCLAUGHLIN. M 52/2001 8295 P
L A
N T
0 P
E R
A T
N S
SRO EQUIPMENT EVALUATION I IMMEDIATE ORGAN ZATION MODE CHANGE REV7EW OPERABLE REQUIRED INVESTIGATION REQUIRED NOTIFIED RESTRAINT 13 Yos l No I Yes No W1 N/A El Yes No 1Yos Y.
No H.WA I
Y es2 No MODE ASSOCIATED TECH SPEC NUMBER(S)
ASSOCIATED LCO ACTION STATEMENT(S)
- 2 DECLARED REPORTABLE?
One Hour
/A APPLICABLE UNIT(S)
NOPERABLE (Date /7Tme) OY*s (No FRR N/A QEvatRequtrOd Other NA3 U1 0 U2 0 Borh COMMENTS This CR Identifies adminislrative actions that need to be taken for this concern. It doesnlt identify a known problem with the RCS Pressure Boundary, thus Tech Spec marked N/A.
Current Mode-Unit PowerLevel-Unit*
Current Mode-UnIt 2 Power Level-Unit 2 W
l o 00 n
N/A WNA SRO - UNIT I SRO - UNIT 2
_ Baldwin, J DATE 5/2001 Page 4 of 24 H84
\\~i