Summary of Meeting Regarding the Status of Browns Ferry Unit 1 Restart Project
ML042880274
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/09/2004
From: Jabbour K
NRC/NRR/DLPM/LPD2
To:
Jabbour K, NRR/DLPM, 415-1496
Shared Package
ML042880292 List:
References
TAC MC4035
Download: ML042880274 (21)


Text

TENNESSEE VALLEY AUTHORITY l -BROWNS FERRY NUCLEAR PLANT

. , . *....-. Roc.v.I.e.Md W, e ... .

-AA

- '2004

'Vep eM, pr

~- e . . .

.. ,chm r

M - A 2- ae a I I- I Kj 2 I a 2 ELJ L-i L3 L-- t a ' h -- -m TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNIT 1 STATUS Rockville, Md.

September 9, 2004

.m- - in 4j Ri . . W-- - I I I--- - -

Agenda

  • Introduction J. Rupert
  • Unit 1 Organizational Changes J. Rupert
  • Regulatory Status T. Abney
  • Unit 1 Overview and Schedule J. Rupert J. Valente R. Drake
  • Operations R.G. Jones
  • Nuclear Assurance R. Baron
  • Open Discussion Jon Rupert 2

fL C -' *' Lt LA: L L-- i 3 1f - -M Introduction

  • Welcome to the Fourth Periodic Status Meeting for the Unit 1 restart project
  • Purpose

{ - Status of project

- Upcoming activities

- Solicit feedback J. Rupert 3

Unit 1 Organizational Changes Changes highlighted.

Jon Rupert 4

JO- is- X-1 Z C--..j 1- 1 1- 1 L----Z L-1 L- i f---% 1 -

Regulatory Status Unit 1 License Amendments

- 20 amendments identified

- 17 of the 20 have or will have been previously submitted and/or approved on Units 2 and 3

- 12 submitted to date o Includes Extended Power Uprate - submitted June 28, 2004

- 1 approved by NRC

  • Relief Requests

- 5 relief requests submitted

- 4 approved by NRC

- Risk informed ISI to be submitted

- Other relief requests may be identified as a result of inspections

- Submitted December 31, 2003 Tim Abney 5

_____r. &- -. - ~ .

L....Z 1L..- 1 Z. . n L-... - - a Regulatory Status Status of Technical Specifications and Relief Requests 30*-

c 151- ______________

' _ l O X --

5 0

M < C- C-

' w C- C- w s o a Z C- c-nC Z C- C-= (n z

\ O w La LO L 4..

S -O vO Ln o~ Ol on °n o z )

SUBMITTAL DATE Actual Number Remaining - - - - Scheduled

- NRC Approvals Remaining Tim Abney 6

d- M- r- Z- L- Q-- Q- t L---a i;. t- 1-% I-Si -0 M Regulatory Status Other Unit 1 Submittals

- 82 programmatic and completion submittals identified

- From overall Regulatory Framework o Submitted December 2002 o Approved August 2003

- Agreed to notify NRC upon the completion of Bulletins, Generic Letters, TMI Action Plan Items, or Nuclear Performance Plan Special Programs

- 12 submitted to date

- None NRC approved Tim Abney 7

6 -. 6- - - - -. - -- - a Regulatory Status Status of Other Submittals 100 I --I 90 Pr I-.

cI z 70 1 --

0

-j 60 -

50 -

n 0 a 0 IL 0

CL z

40" en a 30 -_

E m

<: _ 20 - --

cc:=

101 -- '

D 3) c c / C o w1 ) 1 i UCt) 9)CC 0 0 Ct) 0) CD D C t>() O Z ao °3 C ° ° -

°3 oT-.7.<M owCC2° o o °T o ° uV °o Ln 00 0 00000 SL 0 DATE00 C SUBMITTAL DATE Actual Number Remaining - - - -Scheduled NRC Approvals Remaining Tim Abney 8

__-- - -- ---- -. -__ t S q. - a Unit 1 Overview and Schedule

  • Project Schedule (Attached)

- On schedule for start-up May 2007 Jon Rupert 9

... .... X _

Unit 1 Overview and Schedule Engineering

- Current status o Design Change Notices issued o Overall 75 percent complete

- Ongoing activities o Primarily in a field support role o Closures o Completing System Plant Acceptance Evaluations (SPAE) and System Pre-operability Checklists (SPOCs)

- Extended Power Uprate Analyses o Steam dryer o Main steam lines a Vessel internals Joe Valente 11


- ^ - -- -I - -a a Unit 1 Overview and Schedule

  • Modifications and Maintenance Status
  • Major Accomplishments

- Replaced o Drywell structural steel o Core Spray piping o Reactor Pressure Vessel safe ends o Condenser tubes o Turbine cross-over and cross-under piping o Extraction Steam piping o Flow assisted corrosion susceptible piping (Carbon steel with chrome-moly)

- RCIC turbine reassembly Rick Drake 12

- - - - - -- -S -

Unit 1 Overview and Schedule Major Work In-progress

- Cable tray, conduit and support installation

- Large and small bore pipe replacement

- Pipe hanger installation

- Large pump and motor refurbishment

- Torus coating

- Control Room Design Review modifications

- Turbine generator rewind

- Main Bank transformers

  • Challenges

- Industrial safety

- Welding Rick Drake 13

- :-- I I U U

% a Unit 1 Overview and Schedule

  • Status of Major Commodities COMMODITY INSTALLED TOTAL Piping - Large Bore 5, 948 feet 12,466 feet Hangers - Large Bore 524 1,586 Piping - Small Bore 2,527 feet 24,177 feet Hangers - Small Bore 755 5,461 Conduit 25,540 feet 152,187 feet Conduit Supports 3,984 16,251 Cable Tray 7,695 feet 9,101 feet Cable Tray Supports 1,310 1,430 Rick Drake 14

- -_ -a Operations Access Control

- Barriers

- Personnel identification

- Physical access accommodations

- Training

- Unit color codes

- Unit 1 equipment required for Unit 2/3 operation identified

- No trips or power reductions caused by Unit 1 work

  • Work Control

- Comprised of qualified and site experienced personnel

- Coordination with operating units Work Control and Operation

  • Completing System Pre-operability Checklists (SPOCs)

- Process flow chart attached R.G. Jones 15

Operations

  • Preparing for Baseline, Restart and Power Ascension Test Programs
  • Operations Department

- Staffing / training to support three unit operations

  • 1 - Adding a second simulator
  • Dose Reduction Activities

- Decontaminated Drywell, Reactor and Turbine Buildings

- Gamma scan to identify and system flushing to reduce hot spots

- Replacement of CRD and low pressure turbine blades and 77 other components containing stellite

- Electro-polish and chrome plate 17 valves and 2 RWCU pumps

- Electro-polish and pre-oxidize Recirc. and RWCU piping and RWCU regenerative heat exchangers R.G. Jones 17

Nuclear Assurance Shift in Emphasis

- Established and filled a new QA Manager position

- Increased QC staffing, including Level Ill technical support

- Established QC Level Ill oversight support

- QA staffing and skill set strengthened

- Dedicated resources to corrective action program oversight

  • Reinforced Expectations and Strengthened Approach

- Quality Assurance

- Quality Control Raul Baron 18

- U Nuclear Assurance

  • Focus Areas

- Nuclear Performance Plan Special Programs (DBVP, seismic issues, electrical issues, etc.)

- Vendor performance / source surveillance

, - Modification / Construction field activities

- SPAE/SPOC Raul Baron 19

I r -

US. I I f I_

I V-L I

- ;A_ ...=

V-

  • C

- S -V S I

Ir I s--

I X,~ A I

I I I I

I I

  • la I

,I-, ^

l I

Open Discussion

'i 20