MONTHYEARML0428802742004-09-0909 September 2004 Summary of Meeting Regarding the Status of Browns Ferry Unit 1 Restart Project Project stage: Meeting ML0428900402004-10-0505 October 2004 Summary of Meeting Regarding the Status of Browns Ferry Unit 1 Restart Project Project stage: Meeting 2004-10-05
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24032A2752024-02-0707 February 2024 Pre-Pre-Submittal Meeting for Proposed License Amendment Regarding Hydrologic Analysis Updates (Slides) ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML23130A0912023-05-11011 May 2023 TVA Browns Ferry Nuclear Plant Safety Pre-Application Public Meeting Slides 05/11/2023 ML23130A0922023-05-11011 May 2023 NRC Browns Ferry Nuclear Plant, Units 1, 2, and 3, Subsequent License Renewal Application, Public Meeting Slides ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23025A0472023-01-25025 January 2023 Pre-Submittal Meeting for Proposed License Amendment Request Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves - January 25, 2023 ML22285A1902022-10-13013 October 2022 October 13, 2022 Public Meeting on 5th Interval Alternative Planned Requests - Licensee Slides ML22279A8992022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October 6, 2022-TVA Slides ML22277A6562022-10-0606 October 2022 Subsequent License Renewal Application - SAMA Pre-Application Meeting October, 2022 (TVA Slides) ML22264A2332022-09-22022 September 2022 Slides for Pre-Submittal Meeting for Request to Use a Later Edition of the ASME OM Code for the Fifth Inservice Testing (IST) 10-Year Interval ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21270A0322021-09-27027 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting September 27, 2021 ML21265A0422021-09-21021 September 2021 Presentation Slides for Browns Ferry Pre-submittal Public Meeting 09/22/2021 ML21250A3012021-09-0707 September 2021 TVA Slides for September 7, 2021, Presubmittal Meeting to Discuss Planned Browns Ferry TSTF-505 License Amendment Request ML21152A1872021-06-0101 June 2021 TVA Slides for June 1, 2021, Presubmittal Meeting to Discuss Planned Control Bay Chiller Cross-Tie License Amendment Request ML24019A1322020-11-0909 November 2020 ANP-3874NP, Revision 1, Browns Ferry Atrium 11 Control Rod Drop Accident Analysis with the AURORA-B CRDA ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20156A2812020-06-0808 June 2020 TVA Slides for June 8, 2020, ATRIUM-11 Presubmittal Meeting ML20092F5742020-04-0202 April 2020 TVA Slides for Browns Ferry 50.69 License Amendment Request Presubmittal Meeting ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML24019A1482019-01-28028 January 2019 Surveillance Procedure 2-SR-3.1.6.1, BPWS Compliance Verification, Revision 006 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18239A2522018-08-27027 August 2018 Proposed Changes to NFPA 805 License Conditions ML18158A2862018-06-0707 June 2018 May 30, 2018 Summary of Public Meeting with Browns Ferry Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17034A3322017-02-0303 February 2017 Presentation Slides for Public Meeting Regarding Browns Ferry Extended Power Uprate License Amendment Request Transmission System Update Supplements ML16356A0342017-01-0404 January 2017 Pre-app Meeting Mellla+ LAR Final ML16341A7422017-01-0404 January 2017 Presentation Slides for Browns Ferry Pre-application Meeting Regarding Mellla+ ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16200A2592016-07-19019 July 2016 July 19, 2016: NRC Public Meeting on Browns Ferry Nuclear Plant Extended Power Uprate License Amendment Request ML16189A3482016-07-19019 July 2016 Presentation Slides for July 19, 2016, Public Meeting ML16028A0962016-02-0101 February 2016 Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal Logic, and Unit Priority Re-Trip Logic License Amendment Request ML15308A1002015-11-10010 November 2015 Public Meeting Presentation Slides Extended Power Uprate License Amendment Request NRC Public Meeting ML15195A1252015-07-14014 July 2015 July 14, 2015 - Public Meeting Slides on Browns Ferry Seismic Risk Insights ML15293A4582015-07-14014 July 2015 Slides for July 14, 2015 Public Meeting on Browns Ferry Seismic Risk Evaluations (MF3764 Through MF3766) CNL-15-122, Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request2015-07-0808 July 2015 Presentation Slides for Closed Meeting Extended Power Uprate (EPU) License Amendment Request ML15146A2792015-05-21021 May 2015 Bf EOC Meeting Summary 2015 ML15099A2912015-04-22022 April 2015 4/22/2015, Enclosure 2, Slides for TVA Presentation to the NRC in Support of Steam Dryer Replacement ML14147A3222014-05-27027 May 2014 Public Meeting Summary 05/21/2014 to Present Annual Assessment ML14101A1522014-04-11011 April 2014 Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14036A3872014-02-0505 February 2014 Summary of Meeting with Public to Discuss the Results of the Follow-up Inspection of the Items Identified in Confirmatory Action Letter (ML13232A105) of August 22, 2013, and the Status of Nrc'S Performance Assessment of Browns Ferry Unit 1 IR 05000260/20132012013-07-30030 July 2013 07/24/2013 Summary of Public Conference Meeting With Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater Than Green Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000260 ML13212A0842013-07-30030 July 2013 Summary of Public Conference Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000260/20132012 ML13199A4522013-07-17017 July 2013 Summary of Meeting with Browns Ferry 2024-02-07
[Table view] |
Text
TENNESSEE VALLEY AUTHORITY l -BROWNS FERRY NUCLEAR PLANT
. , . *....-. Roc.v.I.e.Md W, e ... .
-AA
- '2004
'Vep eM, pr
~- e . . .
.. ,chm r
M - A 2- ae a I I- I Kj 2 I a 2 ELJ L-i L3 L-- t a ' h -- -m TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNIT 1 STATUS Rockville, Md.
September 9, 2004
.m- - in 4j Ri . . W-- - I I I--- - -
Agenda
- Unit 1 Organizational Changes J. Rupert
- Regulatory Status T. Abney
- Unit 1 Overview and Schedule J. Rupert J. Valente R. Drake
- Nuclear Assurance R. Baron
- Open Discussion Jon Rupert 2
fL C -' *' Lt LA: L L-- i 3 1f - -M Introduction
- Welcome to the Fourth Periodic Status Meeting for the Unit 1 restart project
{ - Status of project
- Upcoming activities
- Solicit feedback J. Rupert 3
Unit 1 Organizational Changes Changes highlighted.
Jon Rupert 4
JO- is- X-1 Z C--..j 1- 1 1- 1 L----Z L-1 L- i f---% 1 -
Regulatory Status Unit 1 License Amendments
- 20 amendments identified
- 17 of the 20 have or will have been previously submitted and/or approved on Units 2 and 3
- 12 submitted to date o Includes Extended Power Uprate - submitted June 28, 2004
- 1 approved by NRC
- 5 relief requests submitted
- 4 approved by NRC
- Risk informed ISI to be submitted
- Other relief requests may be identified as a result of inspections
- Submitted December 31, 2003 Tim Abney 5
_____r. &- -. - ~ .
L....Z 1L..- 1 Z. . n L-... - - a Regulatory Status Status of Technical Specifications and Relief Requests 30*-
c 151- ______________
' _ l O X --
5 0
M < C- C-
' w C- C- w s o a Z C- c-nC Z C- C-= (n z
\ O w La LO L 4..
- S -O vO Ln o~ Ol on °n o z )
SUBMITTAL DATE Actual Number Remaining - - - - Scheduled
- NRC Approvals Remaining Tim Abney 6
d- M- r- Z- L- Q-- Q- t L---a i;. t- 1-% I-Si -0 M Regulatory Status Other Unit 1 Submittals
- 82 programmatic and completion submittals identified
- From overall Regulatory Framework o Submitted December 2002 o Approved August 2003
- Agreed to notify NRC upon the completion of Bulletins, Generic Letters, TMI Action Plan Items, or Nuclear Performance Plan Special Programs
- 12 submitted to date
- None NRC approved Tim Abney 7
6 -. 6- - - - -. - -- - a Regulatory Status Status of Other Submittals 100 I --I 90 Pr I-.
cI z 70 1 --
0
-j 60 -
50 -
n 0 a 0 IL 0
CL z
40" en a 30 -_
E m
<: _ 20 - --
cc:=
101 -- '
D 3) c c / C o w1 ) 1 i UCt) 9)CC 0 0 Ct) 0) CD D C t>() O Z ao °3 C ° ° -
°3 oT-.7.<M owCC2° o o °T o ° uV °o Ln 00 0 00000 SL 0 DATE00 C SUBMITTAL DATE Actual Number Remaining - - - -Scheduled NRC Approvals Remaining Tim Abney 8
__-- - -- ---- -. -__ t S q. - a Unit 1 Overview and Schedule
- Project Schedule (Attached)
- On schedule for start-up May 2007 Jon Rupert 9
... .... X _
Unit 1 Overview and Schedule Engineering
- Current status o Design Change Notices issued o Overall 75 percent complete
- Ongoing activities o Primarily in a field support role o Closures o Completing System Plant Acceptance Evaluations (SPAE) and System Pre-operability Checklists (SPOCs)
- Extended Power Uprate Analyses o Steam dryer o Main steam lines a Vessel internals Joe Valente 11
- ^ - -- -I - -a a Unit 1 Overview and Schedule
- Modifications and Maintenance Status
- Replaced o Drywell structural steel o Core Spray piping o Reactor Pressure Vessel safe ends o Condenser tubes o Turbine cross-over and cross-under piping o Extraction Steam piping o Flow assisted corrosion susceptible piping (Carbon steel with chrome-moly)
- RCIC turbine reassembly Rick Drake 12
- - - - - -- -S -
Unit 1 Overview and Schedule Major Work In-progress
- Cable tray, conduit and support installation
- Large and small bore pipe replacement
- Pipe hanger installation
- Large pump and motor refurbishment
- Torus coating
- Control Room Design Review modifications
- Turbine generator rewind
- Main Bank transformers
- Industrial safety
- Welding Rick Drake 13
- :-- I I U U
% a Unit 1 Overview and Schedule
- Status of Major Commodities COMMODITY INSTALLED TOTAL Piping - Large Bore 5, 948 feet 12,466 feet Hangers - Large Bore 524 1,586 Piping - Small Bore 2,527 feet 24,177 feet Hangers - Small Bore 755 5,461 Conduit 25,540 feet 152,187 feet Conduit Supports 3,984 16,251 Cable Tray 7,695 feet 9,101 feet Cable Tray Supports 1,310 1,430 Rick Drake 14
- -_ -a Operations Access Control
- Barriers
- Personnel identification
- Physical access accommodations
- Training
- Unit color codes
- Unit 1 equipment required for Unit 2/3 operation identified
- No trips or power reductions caused by Unit 1 work
- Comprised of qualified and site experienced personnel
- Coordination with operating units Work Control and Operation
- Completing System Pre-operability Checklists (SPOCs)
- Process flow chart attached R.G. Jones 15
Operations
- Preparing for Baseline, Restart and Power Ascension Test Programs
- Staffing / training to support three unit operations
- 1 - Adding a second simulator
- Dose Reduction Activities
- Decontaminated Drywell, Reactor and Turbine Buildings
- Gamma scan to identify and system flushing to reduce hot spots
- Replacement of CRD and low pressure turbine blades and 77 other components containing stellite
- Electro-polish and chrome plate 17 valves and 2 RWCU pumps
- Electro-polish and pre-oxidize Recirc. and RWCU piping and RWCU regenerative heat exchangers R.G. Jones 17
Nuclear Assurance Shift in Emphasis
- Established and filled a new QA Manager position
- Increased QC staffing, including Level Ill technical support
- Established QC Level Ill oversight support
- QA staffing and skill set strengthened
- Dedicated resources to corrective action program oversight
- Reinforced Expectations and Strengthened Approach
- Quality Assurance
- Quality Control Raul Baron 18
- U Nuclear Assurance
- Nuclear Performance Plan Special Programs (DBVP, seismic issues, electrical issues, etc.)
- Vendor performance / source surveillance
, - Modification / Construction field activities
- SPAE/SPOC Raul Baron 19
I r -
US. I I f I_
I V-L I
- ;A_ ...=
V-
- S -V S I
Ir I s--
I X,~ A I
- I I I I
I I
,I-, ^
l I
Open Discussion