October 5, 2004
Carolina Power & Light Company
ATTN: Mr. J. W. Moyer
Vice President
H. B. Robinson Steam Electric Plant Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT- NRC EXAMINATION REPORT
NO. 050000261/2004301
Dear Mr. Moyer:
During the period August 30 - September 3, 2004, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for
licenses to operate the H.B. Robinson Steam Electric Plant. At the conclusion of the
examination, the examiners discussed the examination questions and preliminary findings with
those members of your staff identified in the enclosed report. The written examination was
administered by your staff on August 27, 2004.
All applicants passed both the written and operating examinations. There were no post
examination comments.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC Web site
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4638.
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket No. 50-261
License No. DPR-23
Enclosure: (See page 2)
2
Enclosure:
Report Details
cc w/encl:
William G. Noll
Director, Site Operations
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Daniel G. Stoddard
Plant General Manager
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Chris L. Burton, Manager
Performance Evaluation and
Regulatory Affairs CPB 9
Electronic Mail Distribution
C. T. Baucom, Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
J. F. Lucas, Manager
Support Services - Nuclear
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Henry J. Porter, Director
Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental
Control
Electronic Mail Distribution
R. Mike Gandy
Division of Radioactive Waste Mgmt.
S. C. Department of Health and
Environmental Control
Electronic Mail Distribution
Beverly Hall, Acting Director
Division of Radiation Protection
N. C. Department of Environment,
Health and Natural Resources
Electronic Mail Distribution
Steven R. Carr
Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC
Electronic Mail Distribution
John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC 20037-1128
Peggy Force
Assistant Attorney General
State of North Carolina
Electronic Mail Distribution
Chairman of the North Carolina
Utilities Commission
c/o Sam Watson, Staff Attorney
Electronic Mail Distribution
Robert P. Gruber
Executive Director
Public Staff - NCUC
4326 Mail Service Center
Raleigh, NC 27699-4326
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
Mr. Greg Ludlam, Training Manager
Progress Energy Carolinas, Inc.
H. B. Robinson Steam Electric Plant Unit 2
3581 West Entrance Road
Hartsville, SC 29550
3
Distribution w/encl:
C. Patel, NRR
C. Evans (Part 72 Only)
L. Slack, RII EICS
RIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
NAME
RAiello:pmd
MErnstes
PFredrickson
DATE
9/23/04
9/23/04
10/4/04
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
PUBLIC DOCUMENT
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042800138.wpd
Enclosure
NUCLEAR REGULATORY COMMISSION
REGION II
Docket No.:
50-261
License No.:
Report No.:
050000261/2004301
Facility:
H. B. Robinson Steam Electric Plant
Location:
3581 West Entrance Road
Hartsville, SC 29550
Dates:
Operating Tests - August 30 - September 3, 2004
Written Examination - August 27, 2004
Examiners:
R. Aiello, Chief License Examiner
T. Kolb, Operations Examiner
D. Muller, Senior License Examiner
Approved by:
M. Ernstes, Chief
Operator Licensing and Human Performance Branch
Division of Reactor Safety
SUMMARY OF FINDINGS
ER 050000261/2004301; 8/30/2004 - 9/3/2004 and 8/27/2004; H. B. Robinson Steam Electric
Plant; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the
guidance of NUREG-1021, Draft Revision 9, Operator Licensing Examination Standards for
Power Reactors. This examination implemented the operator licensing requirements identified
in 10 CFR §55.41, §55.43, and §55.45.
The NRC administered the operating test August 30 - September 3, 2004. The Robinson
training staff administered the written examination on August 27, 2004. All of the outlines, the
written examination, Job Performance Measures (JPMs) and scenarios were developed by the
Robinson training staff. All applicants, four Reactor Operators (RO) and seven Senior Reactor
Operators (SRO), passed both the operating and written examinations. All applicants were
issued operator licenses commensurate with the level of examination administered.
No significant issues were identified.
Report Details
4.
OTHER ACTIVITIES (OA)
4OA5 Operator Licensing Initial Examinations
a.
Inspection Scope
The licensee developed operating tests and written examinations in accordance with
NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Draft
Revision 9. The NRC examination team reviewed the proposed examinations.
Examination changes agreed upon between the NRC and the licensee were made
according to NUREG-1021 and incorporated into the final version of the examination
materials.
The examiners reviewed the licensees examination security measures while preparing
and administering the examinations to ensure examination security and integrity
complied with 10 CFR 55.49, Integrity of examinations and tests.
The examiners evaluated four RO and seven SRO applicants who were being assessed
under the guidelines specified in NUREG-1021. The examiners administered the
operating tests during the period of August 30 - September 3, 2004. Members of the
H. B. Robinson Steam Electric Plant training staff administered the written examination
on August 27, 2004. The evaluations of the applicants and review of documentation
were performed to determine if the applicants, who applied for licensees to operate the
H. B. Robinson Steam Electric Plant, met requirements specified in 10 CFR Part 55.
b.
Findings
No findings of significance were identified.
The licensees final examination submittal was within the range of acceptability expected
for a proposed examination. Four RO and seven SRO applicants passed both the
operating and written examinations. The RO and SRO written examinations and answer
keys, and combined RO/SRO examination and examination references may be
accessed in the ADAMS system (ADAMS Accession Numbers, ML04600124).
4OA6 Meetings
Exit Meeting Summary
On September 3, 2004, the examination team discussed generic issues with Mr. John
Moyer and members of his staff. The inspectors asked the licensee whether any
materials reviewed during the examination should be considered proprietary. No
proprietary information was identified.
2
PARTIAL LIST OF PERSONS CONTACTED
Licensee personnel
J. Arsenault, Western Technical Services, Inc.
C. Bach, Manager, Environment & Chemistry
C. Baucom, Supervisor, Licensing/Regulatory Programs
T. Bonnette, Emergency Preparedness
E. Caba, Superintendent, Design Engineering
G. Cheatham, Manager Radiation Control
C. Church, Manager, Engineering
B. Clark, Manager, Nuclear Assessment
D. Coates, PES
B. Guthrie, Superintendent, Security
J. Huegel, Manager, Maintenance
R. Ivey, Manager, Operations
J. Lucas, Manager, Support Services - Nuclear
G. Ludlam, Manager, Training
K. Kruger, Supervisor, Operator Initial Training
D. Martrano, Superviser, Reactor Systems
S. Michaud, Supervisor, Nuclear Information Technology
M. Milbee, Operator Training
C. Moon, Superintendent, Operator Training
J. Moyer, Site Vice President
J. Stanley, Superintendent, Technical Services
D. Stoddard, Plant General Manager
T. Tovar, Manager, Shift Operations
J. Valentino, Licensing
B. Vine, Supervisor, Materials Acquisition
D. Winters, Superintendent, Plant Support Group
NRC personnel
P. Fredrickson, Branch Chief, Division of Reactor Projects
B. Hagar, Senior Resident Inspector
D. Jones, Resident Inspector