ML042660540
| ML042660540 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/21/2004 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MC0837 | |
| Download: ML042660540 (1) | |
Text
PPL Rev. 0 SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow
< 10 million Ibm/hr:
THERMAL POWER shall be *25% RTP.
2.1.1.2 With the reactor steam dome pressure > 785 psig and core flow
> 10 million Ibm/hr:
MCPR shall be 2 1.08 for two recirculation loop operation or Ž 1.09 for single recirculation loop operation.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
I 2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be < 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
SUSUQUEHANNA - UNIT 2 TS / 2.0-1 Amendmrnt 1 1
- 114, 84 191