SBK-L-04049, Response to Request for Additional Information Regarding License Amendment Request 03.02

From kanterella
(Redirected from ML042660100)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding License Amendment Request 03.02
ML042660100
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/13/2004
From: Warner M
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-04049
Download: ML042660100 (9)


Text

FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 SEP 1 3 2004 Docket No. 50-443 SBK-L-04049 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Reference:

FPL Energy Seabrook Letter NYN-03061, Seabrook Station License Amendment Request 03-02,"Implementation of Alternate Source Term,"

dated October 6, 2003.

Seabrook Station "Response to Request for Additional Information Regarding License Amendment Request 03-02" Enclosed is the FPL Energy Seabrook, LLC (FPL Energy Seabrook) response to request for additional information associated with License Amendment Request (LAR) 03-02 received on August 6, 2004.

Should you have any questions concerning this response, please contact Mr. James M. Peschel, Regulatory Programs Manager, at (603) 773-7194.

Very truly yours, FPL Energy Seabrook, LLC Mark. Warner Site Vice President 4DCA an FPL Group company

U. S. Nuclear Regulatory Commission SBK-L-04049/Page 2 cc:

S. J. Collins, NRC Region I Administrator S. P. Wall, NRC Project Manager, Project Directorate I-2 G. T. Dentel, NRC Senior Resident Inspector Mr. Bruce Cheney, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301 OATH AND AFFIRMATION I, Mark E. Warner, Site Vice President of FPL Energy Seabrook, LLC, hereby affirm that the information and statements contained within this response to the Request for Additional Information to License Amendment Request 03-02 are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

Sworn and Subscribed before me this (3

dayof

, 2004 Nbtary Public Mark E. Warner Site Vice President

'N

Enclosure to SBK-L-04049

Response to Request for Additional Information associated with License Amendment Request (LAR) 03-02 received on August 6, 2004

1. Regulatory Guide 1. 183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," provides assumptions acceptable to the NRC staff for evaluating the radiological consequences of a design basis accidents at pressurized water reactors and states the following:

"The density used in converting volumetric leak rates (eg, gpm) to mass leak rates (eg, Ibm/hr) should be consistent with the basis of surveillance tests used to show compliance with leak rate technical specifications. These tests are typically based on cool liquid.

Facility instrumentation used to determine leakage is typically located on lines containing cool liquids. In most cases, the density should be assumed to be 1.0 gm/cc (62.4 Ibm/ft3)."

Provide the density values to be used for the event analyses discussed in Section 2, "Radiological Consequences - Event Analyses," of Enclosure 2 of the October 6, 2003 submittal. Explain the basis for these values (i.e. based on cool versus hot liquid).

FPLE Response:

Based on an NRC comment and Seabrook Station's review of prior design bases and testing methods, Seabrook is providing calculation revisions to include dose analysis cases with a 1.0 gm/cc (62.4 lbs/fl3) conversion density for primary to secondary leakage. The current surveillance tests used to show compliance with leak rate technical specifications is based on cool liquids.

Note that the Control Room unfiltered inleakage was reduced to the limiting LOCA value (of 150 cfm) for the RCCA Ejection (with Secondary Side Release), Main Steam Line Break (both pre-accident and concurrent iodine spike cases) and Locked Rotor events. Also, note that the (limiting) 0-2 hour EAB atmospheric dispersion factor (i.e., X/Q) was applied for the entire duration of the event.

The following tables present the results of the revised analyses.

Results of New Cases with Cold Density (1.0 gm/cc or 62.4 IbsIft.) for Primary to Secondary Leakage Flow Conversion SGTR with Pre-accident Iodine Spike (ASDV Case 1)

TEDE Dose (rem)

Dose Contribution EAB -

LPZ - 30 CR -30 worst day day 2 hr Noble Gas 2.7996E-01 1.4170E-01 6.2233E-02 RCS and Iodine Spike 3.4875E+00 1.7075E+00 1.5044E+00 Activity Secondary Activity 1.0164E-02 5.4074E-03 8.0378E-03 Control Room Shine Dose 0.45 Total 3.78 1.85 2.02 Acceptance Criteria 25 25 5

Control Room Unfiltered Inleakage = 300 cfm SGTR with Concurrent Iodine Spike (ASDV Case 1)

TEDE Dose (rem)

Dose Contribution EAB -

LPZ - 30 CR -30 worst 2 hr day day Noble Gas 2.7996E-01 1.4170E-01 6.2233E-02 Iodine Spike Activity 1.2846E+00 6.3686E-01 5.4245E-01 RCS Activity (non-iodine) 6.3783E-01 3.1241E-01 2.8366E-01 Secondary Activity 1.0164E-02 5.4074E-03 8.0378E-03 Control Room Shine Dose 0.45 Total 2.21 1.10 1.35 Acceptance Criteria 2.5 2.5 5

Control Room Unfiltered Inleakage = 300 cfm

SGTR with Pre-accident Iodine Spike (ASDV Case 2)

TEDE Dose (rem)

Dose Contribution EAB -

LPZ -30 CR -30 rworst day day 2 hr day day Noble Gas 2.7996E-01 1.4170E-01 6.2233E-02 RCS and Iodine Spike 3.4922E+00 1.7074E+00 1.5030E+00 Activity Secondary Activity 9.9918E-03 5.3225E-03 8.1246E-03 Control Room Shine Dose 0.45 Total 3.78 1.85 2.02 Acceptance Criteria 25 25 5

Control Room Unfiltered Inleakage = 300 cfm SGTR with Concurrent Iodine Spike (ASDV Case 2)

TEDE Dose (rem)

Dose Contribution EAB -

LPZ - 30 CR -30 worst 2 hr day day Noble Gas 2.7996E-01 1.4170E-01 6.2233E-02 Iodine Spike Activity 1.0983E+00 5.4251E-01 4.6257E-01 RCS Activity (non-iodine) 6.3762E-01 3.1186E-01 2.8312E-01 Secondary Activity 9.99188E-03 5.3225E-03 8.1246E-03 Control Room Shine Dose 0.45 Total 2.03 1.00 1.27 Acceptance Criteria 2.5 2.5 5

Control Room Unfiltered Inleakage = 300 cfm

RCCA Ejection with Secondary Side Release TEDE Dose (rem)

Dose Contribution EAB -

LPZ - 30 CR - 30 day worst 2 hr day DNB Fuel Failure - Noble Gas 9.6444E-01 8.2715E-01 1.1644E-01 FCM Fuel Failure - Noble Gas 2.4102E-01 2.0671E-01 2.9100E-02 DNB Fuel Failure - Iodine and 1.2406E+00 8.6321E-01 2.3900E+00 Aerosols FCM Fuel Failure - Iodine and 1.1188E-01 7.85801-02 2.1529E-01 Aerosols Initial RCS - Noble Gas 1.1738E-03 1.3738E-03 2.4703E-04 Initial RCS & SG - Iodine &

1.0382E-02 1.1891E-02 2.3877E-02 Aerosols Control Room Shine Dose 0.45 Total 2.57 1.99 3.22 Acceptance Criteria 6.3 6.3 S.0 Control Room Unfiltered Inleakage = 150 cfm MSLB with Pre-accident Iodine Spike Base Case TEDE Dose (rem)

Dose Contribution EAB -

LPZ - 30 CR -30 worst 2 hr day day Noble Gas 1.2901E-03 1.5106E-03 6.5965E-04 RCS and Spike Activity 4.9500E-02 1.3051E-01 4.3406E-01 Secondary Activity 3.3136E-02 1.6565E-02 1.111 3E-01 Control Room Shine Dose 0.45 Total 0.08 0.15 1.00 Acceptance Criteria 25 25 5

Control Room Unfiltered Inleakage = 150 cfm

MSLB with Concurrent Iodine Spike Base Case TEDE Dose (rem)

Dose Contribution EAB -

LPZ - 30 CR - 30 day worst 2 hr day Noble Gas 1.2901E-03 1.5106E-03 6.5965E-04 Iodine Spike Activity 3.4855E-01 7.7199E-01 2.5768E+00 RCS non-iodine Activity 9.4882E-03 2.6760E-02 8.6570E-02 Secondary Activity 3.3136E-02 1.6565E-02 1.11133E-01 Control Room Shine Dose 0.45 Total 0.39 0.82 3.23 Acceptance Criteria 2.5 2.5 5

Control Room Unfiltered Inleakage = 150 cfm Locked Rotor (10% DNB)

TEDE Dose (rem)

Dose Contribution EAD -

LPZ - 30 CR - 30 day worst 2 hr day DNB Fuel Failure - Noble Gas 3.2148E-01 2.7573E-01 3.8817E-02 DNB Fuel Failure - Non-Noble Gas 6.7665E-01 4.6646E-01 1.3152E+00 Initial RCS Activity -Noble Gas 1.1738E-03 1.3738E-03 2.4703E-04 Initial RCS & SG Activity-Iodine &

1.0382E-02 1.1891E-02 2.3877E-02 Aerosol Control Room Shine Dose 0.45 Total 1.01 0.76 1.83 Acceptance Criteria 2.5 2.5 5

Control Room Unfiltered Inleakage = 150 cfm

Small Line Break Outside of Containment TEDE Dose (rem)

Dose Contribution EAB -

LPZ - 30 CR - 30 day worst 2 hr day Iodine Spike Activity 2.4988E-01 1.7343E-01 8.6226E-01 RCS Activity 2.0905E-01 1.0913E-01 3.4414E-01 Control Room Shine Dose 0.45 Total 0.46 0.28 1.66 Acceptance Criteria 2.5 2.5 5

Control Room Unfiltered Inleakage = 300 cfm