June 10, 2004 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
SUBJECT:
FPL ENERGY SEABROOK, LLC - STRETCH POWER UPRATE ACCEPTANCE REVIEW FOR SEABROOK STATION, UNIT NO. 1 (TAC NO. MC2364)
Dear Mr. Warner:
By letter dated March 17, 2004, as supplemented by a second letter dated March 17, 2004, and letters dated April 1, and May 26, 2004, FPL Energy Seabrook, LLC (FPLE), submitted its application to increase the licensed thermal power level at Seabrook Station, Unit No. 1. The proposed amendment would allow the maximum authorized power level to increase by approximately 5.2 percent, from 3411 megawatts thermal (MWt) to 3587 MWt.
On April 27, 2004, the Nuclear regulatory Commission (NRC) staff conducted a conference call with representatives from FPLE to discuss the basic content and supporting information contained in the March 17, 2004, application. Additionally, on May 20, 2004, we conducted a public meeting on the issues discussed in the conference call. In response to the discussions, FPLE supplemented its application by letter dated May 26, 2004.
The purpose of this letter is to provide the results of the NRC staffs acceptance review of your stretch power uprate application. The acceptance review determines whether or not there is sufficient detail to allow the staff to proceed with its detailed technical review. The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant.
Based on the review of the information provided in the submittals mentioned above, the NRC staff has determined that FPLE has provided the necessary information for the staff to begin a detailed technical review. Additionally, the staff has determined that your application meets the criteria for a stretch power uprate as the requested power increase is less than 7 percent, and there are no major modifications required to support the uprate. In the May 26, 2004, submittal, FPLE provided additional clarifying and supporting information for balance-of-plant and reactor systems impacted by the power uprate to assist the staff with its detailed review. The NRC staff expects to complete its detailed review by your requested date of February 28, 2005.
Mark E. Warner Verbal notification of the NRCs acceptance of your application was provided to Mr. Michael OKeefe of your staff on June 9, 2004. If you have any questions, please contact me at (301) 415-2855 or via electronic mail at spw@nrc.gov.
Sincerely,
/RA/
Scott P. Wall, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page
Mark E. Warner Verbal notification of the NRCs acceptance of your application was provided to Mr. Michael OKeefe of your staff on June 9, 2004. If you have any questions, please contact me at (301) 415-2855 or via electronic mail at spw@nrc.gov.
Sincerely,
/RA/
Scott P. Wall, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page DISTRIBUTION:
PUBLIC PDI-1 Reading BSheron TMarsh/ELeeds CHolden JClifford LRaghavan SWall AMcMurtray MShuaibi CRaynor JJolicoeur TJ Kim CBixler, RGN-I JCalvo EImbro WBateman JWermeil MTschiltz JHannon WBeckner EMarinos RJenkins MMitchell TChan LLund DTerao TMensah KManoly DSolorio SWeerakody MRubin RDennig JUhle TBoyce DTrimble PLoeser NTrehan NRay ZFu PKlein SBailey NLe JBongarra JCai SImboden JTatum NIqbal MStutzke RLobel SLaVie KDensai FOrr OGC OPA ACRS Accession Number:
ML041590157 OFFICE PDI-2/PM PDI-2/LA PDIII-1/LPM PDI-1/SC NAME SWall CRaynor AMcMurtray JClifford DATE 6/8/04 6/8/04 6/9/04 6/10/04 OFFICIAL RECORD COPY
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Mr. Dan McElhinney Federal Emergency Management Agency Region I J.W. McCormack P.O. &
Courthouse Building, Room 401 Boston, MA 02109 Mr. Jack Devine Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 Mr. Stephen McGrail, Director ATTN: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Philip T. McLaughlin, Attorney General Steven M. Houran, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Donald Bliss, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301 Mr. Gene F. St. Pierre Station Director Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 James M. Peschel Regulatory Programs Manager Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
Seabrook Station, Unit No. 1 cc:
David Moore Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004