ML042600415

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - Nine Mile Point Nuclear Station, Unit 1 and Unit 2
ML042600415
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/16/2004
From: Conte R
NRC/RGN-I/DRS/OSB
To: Spina J
Nine Mile Point
Shared Package
ML040780740 List:
References
Download: ML042600415 (3)


Text

September 16, 2004 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION, UNIT 1 AND UNIT 2

Dear Mr. Spina:

In a telephone conversation on August 31, 2004, Mr. Stephen Barr, Examiner/Inspector, and Mr. Robert Brown, Nine Mile Point Unit 1 Requalification Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Nine Mile Point Nuclear Station, Unit 1 and Unit 2. The inspection is planned for the week of November 15, 2004. This week coincides with your regularly scheduled requalification examination cycles. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish for each unit: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection. Please provide these materials to the NRC by November 5, 2004. Mr. Brown has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

2 Mr. James Spina The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Stephen Barr at (610) 337-5316.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos.

50-220 & 50-410 License Nos. DPR-63 & DPR-69 cc:

M. J. Wallace, President, Constellation Generation M. Heffley, Senior Vice President and Chief Nuclear Officer J. M. Petro, Jr., Esquire, Counsel, Constellation Energy Group, Inc.

M. J. Wetterhahn, Esquire, Winston and Strawn P. R. Smith, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network J. R. Evans, LIPA C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board T. Evans, Manager - Nuclear Training

3 Mr. James Spina Distribution:

(via E-mail)

S. Collins, RA J. Wiggins, DRA J. Trapp, DRP N. Perry, DRP C. Miller, RI EDO Coordinator R. Laufer, NRR P. Tam, PM, NRR R. Clark, PM, NRR (Backup)

R. Guzman, PM, NRR (Backup)

G. Hunegs, SRI - Nine Mile Point B. Fuller, RI - Nine Mile Point E. Knutson, RI - Nine Mile Point K. Kolek, DRP, OA T. Kim, Director, DOC W. Lanning, DRS S. Barr, Chief Examiner, DRS C. Bixler, DRS S. Glenn, INPO (GlennSG@Inpo.org)

Region I Docket Room (with concurrences)

DRS File DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042600415.wpd ADAMS PKG#: ML040780740 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBixler SBarr RConte DATE 09/15/04 09/15/04 09/15/04 OFFICIAL RECORD COPY