August 30, 2004 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - OYSTER CREEK NUCLEAR POWER PLANT

Dear Mr. Crane:

On August 5, 2004, the NRC staff completed its mid-cycle plant performance assessment of the Oyster Creek Nuclear Plant. The mid-cycle review for Oyster Creek involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Proprietary Information in accordance with 10 CFR 2.390(d)(1)" will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix, based on one inspection finding in the Mitigating Systems Cornerstone being classified as having low to moderate safety significance (White) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). This White finding involved failure to identify and correct a deficient 4KV safety cable. Due to this inspection finding, a supplemental inspection to review your root cause evaluation and corrective actions in this matter has been scheduled for September 2004. Also in the Mitigating Systems Cornerstone, an inspection finding related to not following emergency diesel generator maintenance procedures, has preliminarily been determined to be Greater Than Green. This issue was described in our letter of August 12, 2004, which afforded you the opportunity to provide the NRC with your position on this finding before we finalize the NRC significance determination. If the finding is ultimately determined to be greater than Green, the appropriate supplemental inspection will be scheduled and other actions taken in accordance with the NRCs Action Matrix.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan

Mr. Christopher M. Crane 2

are tentative and may be revised at the end-of-cycle review meeting. Lastly, a Radwaste inspection begun in June 2004, as previously scheduled in our letter dated March 3, 2004, could only be partially completed and has been rescheduled in the enclosed plan in November 2004, to allow AmerGen additional time to be able to support the inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Peter Eselgroth of my staff at (610) 337-5234 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

A. Randolph Blough, Director Division of Reactor Projects, Region I Docket No.

50-219 License No.

DPR-16

Enclosure:

Oyster Creek Inspection/Activity Plan

Mr. Christopher M. Crane 3

cc w/encl:

Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township K. Tosch - Chief, New Jersey Department of Environmental Protection R. Shadis, New England Coalition Staff N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance Institute of Nuclear Power Operations (INPO)

Mr. Christopher M. Crane 4

Distribution w/encl: (VIA E-MAIL)

S. Collins, RA J. Wiggins, DRA P. Eselgroth, DRP R. Barkley, DRP R. Summers, DRP, Senior Resident Inspector J Herrera, DRP, Resident Inspector J. DeVries, DRP, Resident OA W. Lanning, DRS R. Crlenjak, DRS J. Rogge, DRS L. Doerflein, DRS R. Conte, DRS R. Lorson, DRS J. White, DRS C. Miller, OEDO R. Laufer, NRR P. Tam, PM, NRR T. Colburn, NRR C. ODaniell, DRP Region I Docket Room (with concurrences)

RidsNrrDipmlipb DOCUMENT NAME: S:\\ROP5 Mid-Cycle Review\\2004 Mid-Cycle Letters\\OC 2005 MC Letter FINAL.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"

= No copy OFFICE RI/DRP RI/DRP RI/DRP NAME RSummers/PWE for PEselgroth/PWE ABlough/ARB DATE 08/26/04 08/26/04 08/27/04 OFFICIAL RECORD COPY

Oyster Creek Inspection / Activity Plan 07/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2004 10:37:18 Report 22 1

71114

- EP PROGRAM INSPECTION & PI VERIF.

Baseline Inspections 08/23/2004 08/27/2004 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 08/23/2004 08/27/2004 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 08/23/2004 08/27/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 08/23/2004 08/27/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 08/23/2004 08/27/2004 Performance Indicator Verification IP 71151 1

1 71121

- OCC RAD SAFETY Baseline Inspections 09/06/2004 09/10/2004 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 09/06/2004 09/10/2004 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 09/06/2004 09/10/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

1 71152

- PIR SAMPLE-LHR AREA AFFECTS ECCS SURV Baseline Inspections 09/13/2004 09/17/2004 Identification and Resolution of Problems IP 71152 1

1 95001

- CABLE FAILURE SUPPLEMENTAL Supplemental Program 09/13/2004 09/17/2004 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area IP 95001 1

1 7112203

- PUB RAD SAFETY - REMP Baseline Inspections 10/04/2004 10/08/2004 Radiological Environmental Monitoring Program IP 7112203 1

2 10/04EXM

- OPERATOR LICENSING EXAM RETAKE Not Applicable 11/19/2004 11/19/2004 OYSTER CREEK RETAKE EXAM (10/04)

U01618 1

2 7111108G

- INSERVICE INSPECTION Baseline Inspections 11/08/2004 11/12/2004 Inservice Inspection Activities - BWR IP 7111108G 1

1 71121

- OCC RAD SAFETY Baseline Inspections 11/08/2004 11/12/2004 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 11/08/2004 11/12/2004 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 11/08/2004 11/12/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

1 7112202

- RADWASTE Baseline Inspections 11/29/2004 12/03/2004 Radioactive Material Processing and Transportation IP 7112202 1

1 71121

- OCC RAD SAFETY Baseline Inspections 12/13/2004 12/17/2004 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 12/13/2004 12/17/2004 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 12/13/2004 12/17/2004 Performance Indicator Verification IP 71151 1

2 7111112B

- MAINTENANCE RULE Baseline Inspections 01/31/2005 02/04/2005 Maintenance Effectiveness IP 7111112B 1

1 7112201

- PUB RAD SAFETY - RETS Baseline Inspections 03/07/2005 03/11/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oyster Creek Inspection / Activity Plan 07/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2004 10:37:18 Report 22 1

71121

- OCC RAD SAFETY Baseline Inspections 03/28/2005 04/01/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 03/28/2005 04/01/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 03/28/2005 04/01/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

6 7111121

- SSDI Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 05/23/2005 05/27/2005 Safety System Design and Performance Capability IP 7111121 1

1 71121

- OCC RAD SAFETY Baseline Inspections 06/06/2005 06/10/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 06/06/2005 06/10/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 06/06/2005 06/10/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 06/06/2005 06/10/2005 Radioactive Material Processing and Transportation IP 7112202 1

2 7111111B

- LO REQUAL PROGRAM INSPECTION Baseline Inspections 06/12/2005 06/17/2005 Licensed Operator Requalification Program IP 7111111B 1

1 7111107B

- HEAT SINK Baseline Inspections 09/19/2005 09/23/2005 Heat Sink Performance IP 7111107B 1

1 71121

- OCC RAD SAFETY Baseline Inspections 10/03/2005 10/07/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 10/03/2005 10/07/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 10/03/2005 10/07/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

3 7111105T

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 10/17/2005 10/21/2005 Fire Protection IP 7111105T 1

Baseline Inspections 10/31/2005 11/04/2005 Fire Protection IP 7111105T 1

1 7111401

- EXERCISE EVALUATION & EP PI VERIFICATION Baseline Inspections 10/17/2005 10/21/2005 Exercise Evaluation IP 7111401 1

Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 1

1 71121

- OCC RAD SAFETY Baseline Inspections 12/12/2005 12/16/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 12/12/2005 12/16/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 12/12/2005 12/16/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 12/12/2005 12/16/2005 Performance Indicator Verification IP 71151 1

1 71121

- OCCUPATIONAL RADIATION PROTECTION Baseline Inspections 01/23/2006 01/27/2006 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 01/23/2006 01/27/2006 ALARA Planning and Controls IP 7112102 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oyster Creek Inspection / Activity Plan 07/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2004 10:37:18 Report 22 1

71121

- OCCUPATIONAL RADIATION PROTECTION Baseline Inspections 01/23/2006 01/27/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 01/23/2006 01/27/2006 Performance Indicator Verification IP 71151 1

1 4/3 EXM

- OPERATOR LICENSING INITIAL EXAMS Not Applicable 03/06/2006 03/11/2006 OYSTER CREEK INITIAL EXAM (3/1-5/05)

U01537 1

1 71002

- LICENSE RENEWAL - SCOPING License Renewal Inspectio 03/16/2006 03/20/2006 License Renewal Inspection IP 71002 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.