LAPS A sisidiary oqfPinnacle llisl Capital Corioration Palo Verde Nuclear Generating Station David M. Smith Plant Manager Nuclear Production Tel.
623-393-6116 Fax.
623-393-6077 e-mail: DSMITH10@apsc.com Mail Station 7602 RO. Box 52034 Phoenix, AZ 85072-2034 August 11, 2004 035-00726-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 Monthly Operating Reports for JULY 2004 Enclosed are the Monthly Operating Reports for JULY 2004, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Don Vogt at (623) 393-5926.
Sincerely, DMS/ap
Enclosures:
JULY 2004 Monthly Operating Reports cc:
(all w/enclosures)
Dr. Bruce S. Malleft - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
$561Z
/
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-528 Palo Verde I August 11,200 Jamnes Taylor 623) 393T608 July 2004 2.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator Online Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 4,054.30 126,836.22 744.00 3,998.67 125,387.70 0.00 0.00 0.00 902,308.41 4,800,886.61 151,056,576.95 UNIT SHUTDOWNS Type.
Method of Date F: Forced Duration I Shutting Cause & Corrective Action N: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Unit operated at full power for the entire month.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (ExplaIn)
Page 1 of 1
7,
/4 OPERATING DATA REPORT r
DOCKET NO.
5 UNIT NAME I
DATE 7
COMPLETED BY TELEPHONE i
REPORTING PERIOD:
iO-529 Palo Verde 2 August 11,2004 lames Taylor 623) 393-6080 July 2004 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,354.00 1,335.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 684.43 4,508.41 125,297.67 670.80 4,468.28 123,857.80 0.00 0.00 0.00 833,027.12 5,882,900.11 151,270,992.98 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled Reason Down 2 Comments 04-03 0711412004 F
73.20 A
3 RX trip following a turbine trip on loss of generator field due to a lightning strike.
SUMMARY
- The Design Electrical Rating (DER) and the Maximum Dependable Capacity (MDC) reflect the power uprate performed in 2003. These are interim values. Official values approved by station owners will be determined after testing is completed at the end of the 3rd quarter (late summer). Unit began month at full power. On 7/14 an automatic RX trip occurred after a lightning strike caused a turbine trip on loss of generator field. The RX was taken critical on 07/16 and synchronized to the grid on 07117. RX power reached 100% the following day. The unit ended the month at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic TriptScram 4
Continuation 5
Other (Explain)
Page 1 of 1
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-530 Palo Verde 3 August11,2004 James Taylor (623) 393-6080 July 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,269.00 1,247.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 4,728.03 122,691.33 744.00 4,645.83 121,557.20 0.00 0.00 0.00 919,627.20 5,741,687.85 148,803,555.87 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Unit operated at full power for the enire month.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1