ML042290134

From kanterella
Jump to navigation Jump to search
Submittal of Revision 19 to the Independent Spent Fuel Storage Installation Safety Analysis Report
ML042290134
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 08/10/2004
From: Lucas J
Progress Energy Carolinas
To:
Document Control Desk, NRC/NMSS/SFPO
References
-RFPFR, RA-RA/04-0104
Download: ML042290134 (6)


Text

Progress Energy Serial: RNP-RA/04-0104 AUG 1 0 2004 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3/LICENSE NO. SNM-2502 SUBMITTAL OF REVISION 19 TO THE INDEPENDENT SPENT FUEL STORAGE INSTALLATION SAFETY ANALYSIS REPORT Ladies and Gentlemen:

In accordance with the requirements of 10 CFR 72.70, Progress Energy Carolinas, Inc., also known as Carolina Power and Light Company, is submitting Revision 19 to the Safety Analysis Report (SAR) for the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Independent Spent Fuel Storage Installation (ISFSI).

The enclosed CD-ROM contains the entire SAR. The pages that have been revised since the previous submittal are indicated as Revision 19 in file 001-ISAR-EPL.pdf on the CD-ROM and at the bottom of each revised page. There were no changes to the physical design or design analyses of the facility. The changes did not require an evaluation in accordance with 10 CFR 72.48.

Additional CD-ROM copies of the SAR are being provided to the Nuclear Regulatory Commission (NRC) Region II Administrator, the HBRSEP, Unit No. 2, NRC Project Manager, the HBRSEP, Unit No. 2, NRC Resident Inspector, and the NRC Project Manager for the HBRSEP, Unit No. 2, ISFSI license renewal application dated February 27, 2004.

Attachment I provides an Affirmation as required by 10 CFR 72.70(c)(4)(i).

Attachment II provides a listing and description of the files on the enclosed CD-ROM.

Progress Energy Carolinas. Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC29550

United States Nuclear Regulatory Commission Serial: RNP-RA/04-0104 Page 2 of 2 If you have any questions concerning this matter, please contact Mr. C. T. Baucom at (843) 857-1253.

Sincerely, 6Ctg6e Fa J. F. Lucas Manager - Support Services - Nuclear RAC/rac Attachments:

I. Affirmation II. CD-ROM File Listing and Description

Enclosure:

CD-ROM Containing HBRSEP, Unit No. 2, ISFSI SAR, Revision 19 c: NRC Resident Inspector, HBRSEP Dr. W. D. Travers, NRC, Region II Mr. C. P. Patel, NRC, NRR Mr. C. M. Regan, NRC, NMSS

United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/04-0104 Page 1 of 1 AFFIRMATION The information contained in letter RNP-RA/04-0104 is true and correct to the best of my information, knowledge, and belief; and the sources of my information are officers, employees, contractors, and agents of Progress Energy Carolinas, Inc., also known as Carolina Power and Light Company.

The information contained in the enclosure accurately presents changes made since the previous submittal to the NRC.

I declare under penalty of perjury that the foregoing is true and correct.

Executed On: /D 6a  ?:

V J. W. Mgfer Vice desident, IHBRISEP, Unit No. 2

United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/04-0104 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 CD-ROM FILE LISTING AND DESCRIPTION File

Description:

Files are Adobe Acrobat '.pdf' and text searchable File Listing:

File Size File Name (bytes) Sensitivity Level 001-ISAR-EPL.pdf 16,384 Publicly available 002-ISAR-TOC.pdf 141,312 Publicly available 003-ISAR-Chapter 1.pdf 1,136,640 Publicly available 004-ISAR-Chapter 2.pdf 188,416 Publicly available 005-ISAR-Chapter 3.pdf 176,128 Publicly available 006-ISAR-Chapter 4.pdf 477,184 Publicly available 007-ISAR-Chapter 5.pdf 819,200 Publicly available 008-ISAR-Chapter 6.pdf 47,104 Publicly available 009-ISAR-Chapter 7.pdf 555,008 Publicly available 010-ISAR-Chapter 8.pdf 827,392 Publicly available 01 1-ISAR-Chapter 9.pdf 43,008 Publicly available 012-ISAR-Chapter 10.pdf 63,488 Publicly available 013-ISAR-Chapter 11 .pdf 12,288 Publicly available

United States Nuclear Regulatory Commission Enclosure to Serial: RNP-RA/04-0104 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 CD-ROM CONTAINING HBRSEP, UNIT NO. 2, ISFSI SAR, REVISION 19