Completion of Acceptance Review Regarding Stretch Power Uprate Application, Indian Point, Unit 3
ML042160464
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/05/2004
From: Milano P
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Operations
Milano, P , NRR/DLPM, 415-1457
References
TAC MC3552
Download: ML042160464 (5)


Text

August 5, 2004 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

COMPLETION OF ACCEPTANCE REVIEW REGARDING STRETCH POWER UPRATE APPLICATION, INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 (TAC NO. MC3552)

Dear Mr. Kansler:

In letter dated June 3, 2004, Entergy Nuclear Operations, Inc. (ENO) submitted its application to increase the licensed thermal power level at Indian Point Nuclear Generating Unit No. 3 (IP3). The proposed amendment would allow the maximum authorized power level to be increased by 4.85% (stretch power uprate), from 3067.4 megawatts thermal (MWt) to 3216 MWt.

The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of the application for IP3, which is based on the determination that sufficient information was provided to allow the staff to proceed with its detailed technical review. The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant. On the basis of its review of the information provided in the application, the NRC staff has determined that ENO has provided the necessary information for the staff to begin a detailed technical review. The NRC staff expects to complete the detailed review by your requested date of March 2005.

If you have any questions, please contact me at 301-415-1457.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-286 cc: See next page

August 5, 2004 Mr. Michael R. Kansler, President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

COMPLETION OF ACCEPTANCE REVIEW REGARDING STRETCH POWER UPRATE APPLICATION, INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 (TAC NO. MC3552)

Dear Mr. Kansler:

In letter dated June 3, 2004, Entergy Nuclear Operations, Inc. (ENO) submitted its application to increase the licensed thermal power level at Indian Point Nuclear Generating Unit No. 3 (IP3). The proposed amendment would allow the maximum authorized power level to be increased by 4.85% (stretch power uprate), from 3067.4 megawatts thermal (MWt) to 3216 MWt.

The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of the application for IP3, which is based on the determination that sufficient information was provided to allow the staff to proceed with its detailed technical review. The review also ensures that the application adequately characterizes the regulatory requirements and licensing basis of the plant. On the basis of its review of the information provided in the application, the NRC staff has determined that ENO has provided the necessary information for the staff to begin a detailed technical review. The NRC staff expects to complete the detailed review by your requested date of March 2005.

If you have any questions, please contact me at 301-415-1457.

Sincerely,

/RA/

Patrick D. Milano, Sr. Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-286 cc: See next page Accession No.: ML042160464 OFFICE PDI-1/PM PDI-1/LA PDIII-1/LPM PDI-1/SC NAME PMilano SLittle JLamb PTam for RLaufer DATE 08/02/04 08/02/04 08/03/04 08/04/04 OFFICIAL RECORD COPY

DISTRIBUTION:

PUBLIC PDI-1 Reading B. Sheron T. Marsh J. Lyons C. Holden J. Wermeil J. Hannon J. Calvo E. Imbro W. Bateman R. Laufer J. Uhle M. Mitchell T. Chan L. Lund J. Yerokun, SPLB L. Raghavan E. Marinos R. Jenkins J. Tappert K. Manoly S. Weerakody R. Dennig D. Trimble P. Milano S. Little M. Barillas L. Lois F. Orr J. Lamb J. Tatum H. Li G. Georgiev R. Schaaf J. Collins B. Elliot S. Klementowicz J. Hayes D. Reddy Y-H Hsii N. Trehan P. Qualls R. Lobel T. Mensah C-I Wu J. Jolicoeur, OEDO B. McDermott, R-I C. Bixler, R-I OGC OPA ACRS

Indian Point Nuclear Generating Unit No. 3 cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Fred Dacimo Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Christopher Schwarz General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Danny L. Pace Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P. O. Box 249 Buchanan, NY 10511-0249 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 3 U. S. Nuclear Regulatory Commission P.O. Box 337 Buchanan, NY 10511-0337

Indian Point Nuclear Generating Unit No. 3 cc:

Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Mr. William DiProfio PWR SRC ConsultaNT 139 Depot Road East Kingston, NH 03827 Mr. Dan C. Poole PWR SRC Consultant 20 Captains Cove Road Inglis, FL 34449 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Alex Matthiessen Executive Director Riverkeeper, Inc.

25 Wing & Wing Garrison, NY 10524 Mr. Paul Leventhal The Nuclear Control Institute 1000 Connecticut Avenue NW Suite 410 Washington, DC, 20036 Mr. Karl Coplan Pace Environmental Litigation Clinic 78 No. Broadway White Plains, NY 10603 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Robert D. Snook Assistant Attorney General State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120 Mr. David Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006