ML053430072
| ML053430072 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 12/20/2005 |
| From: | Richard Laufer NRC/NRR/ADRO/DORL/LPLA |
| To: | Kansler M Entergy Nuclear Operations |
| Boska J, NRR, 301-415-2901 | |
| References | |
| TAC MC3552 | |
| Download: ML053430072 (4) | |
Text
December 20, 2005 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 - CORRECTION TO FACILITY OPERATING LICENSE AND TECHNICAL SPECIFICATIONS (TAC NO. MC3552)
Dear Mr. Kansler:
By letter dated March 24, 2005, the Nuclear Regulatory Commission (NRC) issued License Amendment No. 225 to Facility Operating License No. DPR-64 for the Indian Point Nuclear Generating Unit No. 3 (IP3), which approved a power uprate and relocated certain cycle-specific parameters from the Technical Specifications to the Core Operating Limits Report.
However, there were typographical errors on Pages 4 and 6 of the Amended Facility Operating License and Page 3.3.1-13 of the Technical Specifications. Also, by letter dated April 6, 2005, the NRC issued License Amendment No. 226 to IP3. There was an administrative error on Page 3.4.16-1 of the Technical Specifications. Enclosed are corrected Pages 4, 6, 3.3.1-13, and 3.4.16-1. Please replace the pages from the Amended Facility Operating License and Technical Specifications with the pages enclosed with this letter.
Please contact Mr. John P. Boska at (301) 415-2901 if you have any questions on this issue.
Sincerely,
/RA/
Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
Corrected Pages 4, 6, 3.3.1-13, and 3.4.16-1 cc w/encl: See next page
ML053430072 OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME JBoska SLittle RLaufer DATE 12/20/05 12/14/05 12/20/05
Indian Point Nuclear Generating Unit No. 3 cc:
Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Rubin General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Columb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1 P. O. Box 249 Buchanan, NY 10511-0249 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
Indian Point Nuclear Generating Unit No. 3 cc:
Senior Resident Inspectors Office Indian Point 3 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Daniel C. Poole PWR SRC Consultant P.O. Box 579 Inglis, FL 34449 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
828 South Broadway Tarrytown, NY 10591