Text

VIRGINIA ELECTRIC AND POWVER COMPANY RICIhMOND, VIRGINIA 23261 July 1, 2004 U.S. Nuclear Regulatory Commission Serial No.

04-122A Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 WITHDRAWAL OF PROPOSED TECHNICAL SPECIFICATION CHANGES DELETION OF NOTE FOR PERFORMANCE OF COT In a March 4, 2004 letter (Serial No.04-122), Dominion requested a change to the Technical Specifications to Facility Operating Licenses Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. The proposed change would have deleted the Note from Surveillance Requirement (SR) 3.4.12.7 for the power-operated relief valves.

Based on a telephone conference call with Mr. Stephen Monarque and Ms. Kerri Kavanagh of your staff, Dominion is withdrawing the proposed Technical Specification change from consideration. The Note, which permits entering a Mode where the PORVs are required to be operable for low temperature overpressure protection prior to performing the channel operational test (COT) will be maintained.

However, the associated Bases will be changed to clarify that the COT can be performed either prior to entry or within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of entry into a Mode where the PORVs are required for low temperature overpressure protection. The bases changes will be processed in accordance with the Technical Specification Bases Control Program and 10 CFR 50.59.

If you have any further questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.

Very truly yours, W. R. Matthews Senior Vice President - Nuclear Operations Commitments made in this letter: None A

cc:

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 Commissioner Bureau of Radiological Health 1500 East Main Street Suite 240 Richmond, VA 23218 Mr. M. T. Widmann NRC Senior Resident Inspector North Anna Power Station Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8-H12 Rockville, MD 20852