Correction to TS Pages for Amendment 219
ML041910430
Person / Time
Site: Millstone 
(NPF-049)
Issue date: 07/08/2004
From:
NRC/NRR/DLPM
To:
References
TAC MB3167
Download: ML041910430 (2)


Text

TABLE 3.3-3 (Continued)

TABLE NOTATIONS

  1. The Steamline Isolation Logic and Safety Injection Logic for this trip function may be blocked in this MODE below the P-1I (Pressurizer Pressure Interlock) Setpoint.
  • MODESI,2,3,4,5and6.

During fuel movement within containment or the spent fuel pool.

Trip function automatically blocked above P-1I and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.

I I

ACTION STATEMENTS ACTION 14-ACTION 15-ACTION 16-ACTION 17-ACTION 18-ACTION 19-With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

(not used).

With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.

With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 7 days.

After 7 days, or if no channels are OPERABLE, immediately suspend fuel movement, if applicable, and be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

I MILLSTONE - UNIT 3 3/4 3-24 Amendment No. &7, 0, 89, 4219, 203,

-249

TABLE 4.3-2 (Continued)

TABLE NOTATION

1.

Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.

2.

This surveillance may be performed continuously by the emergency generator load sequencer auto test system as long as the EGLS auto test system is demonstrated operable by the performance of an ACTUATION LOGIC TEST at least once per 92 days.

3.

On a monthly basis, a loss of voltage condition will be initiated at each undervoltage monitoring relay to verify individual relay operation. Setpoint verification and actuation of the associated logic and alarm relays will be performed as part of the channel calibration required once per 18 months.

4.

For Engineered Safety Features Actuation System functional units with only Potter &

Brumfield MDR series relays used in a clean, environmentally controlled cabinet, as discussed in Westinghouse Owners Group Report WCAP-13900, the surveillance interval for slave relay testing is R.

MODES 1,2,3,4,5and6.

During fuel movement within containment or the spent fuel pool.

MILLSTONE - UNIT 3 3/4 3-41 Amendment No. 4-, 74, 9, 4-00, 429,

49I, 203,249