Tech Spec Pages for Amendments 192 & 193 Regarding Peak Fuel Centerline Temperature Safety Limit
ML041700430
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/10/2004
From:
NRC/NRR/DLPM
To:
References
TAC MC0801, TAC MC0802
Download: ML041700430 (2)


Text

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 In MODES 1 and 2, departure from nucleate boiling ratio (DNBR) shall be maintained at a 1.31.

2.1.1.2 In MODES 1 and 2, peak fuel centerline temperature shall be maintained at < 5080 0F, decreasing by 580 F per 10,000 MWD/MTU and adjusted for burnable poison per CENPD-382-P-A.

2.1.2 Reactor Coolant System (RCS) Pressure SL In MODES 1, 2, 3, 4, and 5, the RCS pressure shall be maintained at < 2750 psia.

2.2 SL Violations 2.2.1 If SL 2.1.1.1 or SL 2.1.1.2 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2 If SL 2.1.2 is violated:

2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2.2 In MODE 3, 4, or 5, restore compliance within 5 minutes.

2.2.3 Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

2.2.4 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the Vice President - Nuclear Generation and the Nuclear Safety Group (NSG) Supervisor.

2.2.5 Within 30 days of the violation, a Licensee Event Report (LER) shall be prepared pursuant to 10 CFR 50.73. The LER shall be submitted to the NRC, the NSG Supervisor, and the Vice President -

Nuclear Generation.

(continued)

SAN ONOFRE--UNIT 2 2 .0-1 Amendment No. 192

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 In MODES 1 and 2. departure from nucleate boiling ratio (DNBR) shall be maintained at 2 1.31.

2.1.1.2 In MODES 1 and 2, peak fuel centerline temperature shall be maintained at < 5080 0F, decreasing by 580 F per 10,000 MWD/MTU and adjusted for burnable poison per CENPD-382-P-A.

2.1.2 Reactor Coolant System (RCS) Pressure SL In MODES 1, 2, 3, 4, and 5, the RCS pressure shall be maintained at s 2750 psia.

2.2 SL Violations 2.2.1 If SL 2.1.1.1 or SL 2.1.1.2 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2 If SL 2.1.2 is violated:

2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2.2 In MODE 3, 4, or 5, restore compliance within 5 minutes.

2.2.3 Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

2.2.4 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the Vice President - Nuclear Generation and the Nuclear Safety Group (NSG) Supervisor.

2.2.5 Within 30 days of the violation, a Licensee Event Report (LER) shall be prepared pursuant to 10 CFR 50.73. The LER shall be submitted to the NRC, the NSG Supervisor, and the Vice President -

Nuclear Generation.

(continued)

SAN ONOFRE--UNIT 3 2 .0-1 Amendment No. 183