Technical Specifications, Eliminate Requirements for Hydrogen Recombiners and Relocate the Requirements for Hydrogen Monitors to the Technical Requirements ManualML041610296 |
Person / Time |
---|
Site: |
Prairie Island |
---|
Issue date: |
06/08/2004 |
---|
From: |
NRC/NRR/DLPM/LPD3 |
---|
To: |
|
---|
References |
---|
Download: ML041610296 (14) |
|
|
---|
Category:Technical Specifications
MONTHYEARML22357A1002023-03-31031 March 2023 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15209A5122015-07-17017 July 2015 Technical Specifications - Updating Instructions -Effective Date: 7/24/2015 ML15209A5092015-07-17017 July 2015 Technical Specifications - Updating Instructions L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating ML15062A0132015-05-20020 May 2015 Issuance of Amendments 213 and 201 to Revise TS 3.5.3, ECCS - Shutdown L-PI-15-004, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown2015-02-26026 February 2015 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation ML14058A2072014-02-19019 February 2014 Technical Specifications (3801 TS Markup) ML13214A0292013-08-0202 August 2013 Correction Letter for License Amendment Nos. 207 (Unit 1) and 194 (Unit 2) ML13113A4002013-07-0202 July 2013 License Amendments TSTF-510 L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology ML1129011152011-12-0101 December 2011 Issuance of Amendments Revision of Technical Specifications 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil ML11172A0222011-06-27027 June 2011 Technical Specifications, Unit 2, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant ML11172A0202011-06-27027 June 2011 Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-02-0303 February 2011 License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. L-PI-10-104, Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.102010-10-20020 October 2010 Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 ML1025715492010-09-16016 September 2010 Correction to Amendment Nos. 195 and 184 Regarding Technical Specification Changes to Control Room Habitability Requirements ML0925703672009-09-15015 September 2009 Correction to Technical Specifications (TAC Nos. MD9142 and MD9143) L-PI-08-080, License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.92008-11-0404 November 2008 License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 ML0826815912008-09-22022 September 2008 (PINGP-1 and 2), Technical Specifications ISFSI, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245) ML0826812912008-09-22022 September 2008 Revised Operating Licenses & Technical Specifications, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245, MD9622 and MD9623) ML0820504452008-07-18018 July 2008 Tech Spec Pages for Amendments 186 & 176 Adopting Provisions of Regulatory Guide (Rg) 1.52 Revision 3 ML0818402342008-06-27027 June 2008 Prairie, Units 1 and 2, Tech Spec Pages for Amendments 185 and 175 Regarding Incorporation of TS Task Force Travelers TSTF-479, TSTF-485 and TSTF-497 ML0812705062008-05-0101 May 2008 Submittal of Entire Re-Issue of ISFSI Technical Specifications ML0801404252008-01-28028 January 2008 Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs ML0735204002007-12-14014 December 2007 Technical Specifications in Support of Containment Sump Resolution L-PI-07-086, License Amendment Request (LAR) to Revise Containment Spray Nozzle Surveillance Requirements (SR)2007-11-19019 November 2007 License Amendment Request (LAR) to Revise Containment Spray Nozzle Surveillance Requirements (SR) ML0728403542007-10-31031 October 2007 Tech Spec Page for Amendments 181 and 171, Revise TS 3.7.2 Main Steam Valves Closure Times by Relocating the Isolation Valve Closure Times to a Licensee-Controlled Document Identified as a Bases Reference L-PI-07-061, License Amendment Request (LAR) to Increase the Unit 1 Emergency Diesel Generators' (EDG) Monthly Test Load2007-08-16016 August 2007 License Amendment Request (LAR) to Increase the Unit 1 Emergency Diesel Generators' (EDG) Monthly Test Load 2023-03-31
[Table view] |
Text
EM Instrumentation 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One or more required B.l Restore required CET 30 days Core Exit Thermocouple channel(s) to OPERABLE (CET) channel(s) status.
inoperable.
AND At least 4 CET channels OPERABLE in the center region of the core.
AND At least one CET channel OPERABLE in each quadrant of the outside core region.
C. Required Action and C.I Initiate action in Immediately associated Completion accordance with Time of Condition A or B Specification 5.6.8.
not met.
D. ----------NOTE------------ D.I Restore one channel to 7 days Not applicable to CET OPERABLE status.
channels.
One or more Functions with two required channels inoperable.
Prairie Island Unit I - Amendment No. 4-58 163 Units I and 2 3.3.3-2 Unit 2 - Amendment No. 4-49 154
EM Instrumentation 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Three or more required E. 1 Restore required channels 7 days CET channels inoperable to OPERABLE status.
in one or more quadrants.
AND Less than four CETs OPERABLE in the center region of the core.
F. Three or more required F.1 Restore required channels 7 days CET channels inoperable to OPERABLE status.
in one or more quadrants.
AND Less than one CET OPERABLE in each quadrant of the outside core region.
G. Required Action and G.1 Enter the Condition Immediately associated Completion referenced in Table 3.3.3-1 Time of Condition D, E, for the channel.
or F not met.
Prairie Island Unit I - Amendment No. 4-54 163 Units I and 2 3.3.3-3 Unit 2 - Amendment No. 449 154
EM Instrumentation 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME H. As required by Required H.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action G.1 and referenced in Table 3.3.3-1.
I. As required by Required I.1 Initiate action in Immediately Action G.1 and accordance with referenced in Specification 5.6.8.
Table 3.3.3-1.
Prairie Island Unit I - Amendment No. 4-148 163 Units l and 2 3.3.3-4 Unit 2- Amendment No. -49 154
EM Instrumentation 3.3.3 SURVEILLANCE REQUIREMENTS
NOTE--------------------------------------------------
SR 3.3.3.1 and SR 3.3.3.2 apply to each EM instrumentation Function in Table 3.3.3-1.
SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.
SR 3.3.3.2 ---------------------------- NOTE---------------------------- I Neutron detectors are excluded from CHANNEL CALIBRATION.
Perform CHANNEL CALIBRATION. 24 months Prairie Island Unit I - Amendment No. 4-5l 163 Units 1 and 2 3.3.3-5 Unit 2 - Amendment No. 449 154
EM Instrumentation 3.3.3 Table 3.3.3-1 (page I of 1)
Event Monitoring Instrumentation CONDITION REFERENCED FROM FUNCTION REQUIRED REQUIRED ACTION CHANNELS G.l
- 1. Power Range Neutron Flux (Logarithmic Scale) 2 H
- 2. Source Range Neutron Flux (Logarithmic Scale) 2 H
- 3. Reactor Coolant System (RCS) Hot Leg Temperature 2 H
- 4. RCS Cold Leg Temperature 2 H
- 5. RCS Pressure (Wide Range) 2 H
- 6. Reactor Vessel Water Level 2 I
- 7. Containment Sump Water Level (Wide Range) 2 H
- 8. Containment Pressure (Wide Range) 2 H
- 9. Penetration Flow Path Automatic Containment 2 per penetration flow H Isolation Valve Position path(a)(b)
- 10. Containment Area Radiation (High Range) 2 I
- 11. Not used
- 12. Pressurizer Level 2 H
- 13. Steam Generator Water Level (Wide Range) 2 per steam generator H
- 14. Condensate Storage Tank Level 2 H
- 15. Core Exit Temperature 4 per quadrant(c) H
- 16. Refueling Water Storage Tank Level 2 H (a) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
(c) A channel consists of one core exit thermocouple (CET).
Prairie Island Unit 1 - Amendment No. 4l59 163 Units 1 and 2 3.3.3-6 Unit 2 - Amendment No. 449 1 154
Not Used l 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Not Used I I
Prairie Island Unit I -Amendment No.4.- 1 163 Units 1 and 2 3.6.7-1 Unit 2 -Amendment No.449 154
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.7 Steam Generator Tube Inspection Report (continued)
- e. If the calculated conditional burst probability based on the projected end-of-cycle (or if not practical, using the actual measured end-of-cycle) voltage distribution exceeds 1E-02, notify the NRC and provide an assessment of the safety significance of the occurrence.
5.6.8 EM Report When a report is required by Condition C or I of LCO 3.3.3, "Event Monitoring (EM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
Prairie Island Unit 1-Amendment No. 4-58 4-62 163 Units 1 and 2 5.0-40a Unit 2-Amendment No. 449 4-5-3 154
EM Instrumentation 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One or more required B. 1 Restore required CET 30 days Core Exit Thermocouple channel(s) to OPERABLE (CET) channel(s) status.
inoperable.
AND At least 4 CET channels OPERABLE in the center region of the core.
AND At least one CET channel OPERABLE in each quadrant of the outside core region.
C. Required Action and C.1 Initiate action in Immediately associated Completion accordance with Time of Condition A or B Specification 5.6.8.
not met.
D. ----------NOTE------------ D. 1 Restore one channel to 7 days Not applicable to CET OPERABLE status.
channels.
One or more Functions with two required channels inoperable.
Prairie Island Unit 1 - Amendment No. 4K58 163 Units I and 2 3.3.3-2 Unit 2 - Amendment No. 449 154
EM Instrumentation 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Three or more required E. 1 Restore required channels 7 days I CET channels inoperable to OPERABLE status.
in one or more quadrants.
AND Less than four CETs OPERABLE in the center region of the core.
F. Three or more required F. I Restore required channels 7 days CET channels inoperable to OPERABLE status.
in one or more quadrants.
AND Less than one CET OPERABLE in each quadrant of the outside core region.
G. Required Action and G.l Enter the Condition Immediately I associated Completion referenced in Table 3.3.3-1 Time of Condition D, E, for the channel.
or F not met.
Prairie Island Unit I - Amendment No. l-1 163 Units I and 2 3.3.3-3 Unit 2 - Amendment No. 44911 154
EM Instrumentation 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME H. As required by Required H.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action G. 1 and referenced in Table 3.3.3-I.
I. As required by Required 1.1 Initiate action in Immediately Action G. 1 and accordance with referenced in Specification 5.6.8.
Table 3.3.3-1.
Prairie Island Unit 1 - Amendment No. l-l4 163 Units 1 and 2 3.3.3-4 Unit 2 - Amendment No. 4-49 1154
EM Instrumentation 3.3.3 SURVEILLANCE REQUIREMENTS
NOTE--------------------------------------------------
SR 3.3.3.1 and SR 3.3.3.2 apply to each EM instrumentation Function in Table 3.3.3-1.
SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.
SR 3.3.3.2 ----------------------------NOTE ---------------------------- I Neutron detectors are excluded from CHANNEL CALIBRATION.
Perform CHANNEL CALIBRATION. 24 months Prairie Island Unit I - Amendment No. 4.58 163 Units I and 2 3.3.3-5 Unit 2 - Amendment No. 449 154
EM Instrumentation 3.3.3 Table 3.3.3-1 (page I of 1)
Event Monitoring Instrumentation CONDITION REFERENCED FROM FUNCTION REQUIRED REQUIRED ACTION CHANNELS G.l
- 1. Power Range Neutron Flux (Logarithmic Scale) 2 H
- 2. Source Range Neutron Flux (Logarithmic Scale) 2 H
- 3. Reactor Coolant System (RCS) Hot Leg Temperature 2 H
- 4. RCS Cold Leg Temperature 2 H
- 5. RCS Pressure (Wide Range) 2 H
- 6. Reactor Vessel Water Level 2 I
- 7. Containment Sump Water Level (Wide Range) 2 H
- 8. Containment Pressure (Wide Range) 2 H
- 9. Penetration Flow Path Automatic Containment 2 per penetration flow H Isolation Valve Position path(a)(b)
- 10. Containment Area Radiation (High Range) 2 I II. Not used I
- 12. Pressurizer Level 2 H I
- 13. Steam Generator Water Level (Wide Range) 2 per steam generator H I
- 14. Condensate Storage Tank Level 2 H I
.15. Core Exit Temperature 4 per quadrant(C) H I
'16. Refueling Water Storage Tank Level 2 H I
(a) ] Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
(c) A channel consists of one core exit thermocouple (CET).
Prairie Island Unit 1 - Amendment No. 4.59 I 163 Units 1 and 2 3.3.3-6 Unit 2 - Amendment No. -49 1.154
Not Used l 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Not Used I I
Prairie Island Unit 1-Amendment No. 48 163 Units I and 2 3.6.7-1 Unit2-AmendmentNo.449 l 154
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.7 Steam Generator Tube Inspection Report (continued)
- e. If the calculated conditional burst probability based on the projected end-of-cycle (or if not practical, using the actual measured end-of-cycle) voltage distribution exceeds 1E-02, notify the NRC and provide an assessment of the safety significance of the occurrence.
5.6.8 EM Report When a report is required by Condition C or I of LCO 3.3.3, "Event Monitoring (EM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
Prairie Island Unit 1-Amendment No. 458 4-6 163 Units 1 and 2 5.040a Unit 2-Amendment No. 449 4153 154