ML041560197

From kanterella
Jump to navigation Jump to search
Hc Stations Annual Assessment Mtg, Work Environment and PSEG Action Plan Invitation Letters
ML041560197
Person / Time
Site: Salem, Hope Creek  
Issue date: 06/03/2004
From: Holody D
NRC Region 1
To: August B, Berryhill F, Cohen N, Fisher R, Gbur E, Guinan J, Kankus R, Pompper F, Zobian E
- No Known Affiliation, Coalition for Peace & Justice, Jersey Shore Anti Nuclear Alliance, Jersey Shore Nuclear Watch, Lower Alloways Creek Township, NJ, New Jersey Public Interest Research Group (NJPIRG), PECO Energy Co, Public Service Enterprise Group, State of DE, State of NJ
Shared Package
ML040640901 List:
References
Download: ML041560197 (18)


Text

June 3, 2004 Lower Alloways Creek Township Frank Pompper Chief of Police and Emergency Management Coordinator PO Box 157.

Hancocks Bridge, NJ 08038

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Mr. Pompper:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Mr. R. A. Kankus - Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Mr. Kankus:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Mr. John Guinan NJ PIRG 11 North Willow Street Trenton, NJ 08608

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Mr. Guinan:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Ms. Ruth Fisher PO Box 102 South Dennis, NJ 08245

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Ms. Fisher:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Mr. Bernard August 101 Cardiff Ct WT Newark, DE 19711

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Mr. August:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Ms. Frieda Berryhill 2610 Grendon Drive Wilmington, DE 19808

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Ms. Berryhill:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Mr. Norm Cohen Coalition for Peace and Justice Coordinator - Unplug Salem Campaign 321 Barr Avenue Linwood, NJ 08221

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Mr. Cohen:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Ms. Edith Gbur, Coordinator Jersey Shore Nuclear Watch 59 Berkshire Court Toms River, NJ 08753

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Ms. Gbur:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure:

As Stated

June 3, 2004 Mr. Earnest Zobian, Coordinator-Jersey Shore Anti Nuclear Alliance 76 Mount Herman Way, Apt. 9 Ocean Grove, NJ 07756

SUBJECT:

SALEM AND HOPE CREEK NUCLEAR GENERATING STATIONS MEETING TO DISCUSS NRC ANNUAL ASSESSMENT, PSEG ASSESSMENT OF WORK ENVIRONMENT, AND PSEG ACTION PLAN TO IMPROVE ENVIRONMENT

Dear Mr. Zobian:

I would like to personally invite you and other members of your organization to attend the meeting between the Nuclear Regulatory Commission (NRC) and Public Service Electric and Gas Company (PSEG) in which the NRC staff will discuss our annual assessment of the safety performance of the Salem and Hope Creek Nuclear Generating Stations, as well as the work environment at the facility.

The meeting will be held at 7:00 p.m. on Wednesday, June 16, 2004, at the Bridgeport Holiday Inn, One Pureland Drive (Interstate 295 at Exit 10), Swedesboro, NJ. We will briefly discuss our Reactor Oversight Process, and then discuss with PSEG: (1) our assessment of their safety performance at the Salem and Hope Creek Generating Stations and their response to our assessment; (2) the results of recent PSEG assessments of the work environment at the stations; and (3) PSEGs action plan to address its assessment findings and to improve the work environment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to accept comments and questions from you and members of the public regarding the safety performance of Salem and/or Hope Creek, and the role of the NRC in ensuring safe plant operations. Enclosed is the meeting notice for your reference.

The NRC recently completed its annual assessment of the safety performance of these sites in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and 2003 inspection findings. We described our assessment results in letters to PSEG on March 3, 2004. The assessment letters can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/salm_2003q4.pdf.

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/hope_2003q4.pdf.

You can become familiar with our Reactor Oversight Process and the information we used in our annual assessment through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The PSEG work environment assessment reports referenced above which were submitted to the NRC in a letter dated May 21, 2004, can be accessed via the Publicly Available Records (PARS) component of NRCs document system (ADAMS) at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room) using accession number ML041460523.

2 Your schedule permitting, we look forward to meeting you on June 16, 2004. In the interim, please do not hesitate to contact me at 610-337-5312, if I can be of further assistance to you.

Sincerely,

/RA/

Daniel J. Holody, Acting Chief Projects Branch 3 Division of Reactor Projects

Enclosure: