Replacement of Steam Generators Request for Relief No. 04-QN-007
ML041460272
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/17/2004
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041460272 (5)


Text

Duke R. A.

JONES trPOwer.

Vice President A Duke Energy Company Duke Power 29672 1 Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax May 17, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Duke Energy Oconee Nuclear Station, Unit 1, Docket No. 50-269 Replacement of Steam Generators Request for Relief No. 04-ON-007 Pursuant to 10 CFR 50.55a(g)(5)(iii), attached is a Request for Relief associated with the replacement of Steam Generators on Oconee Unit 1.

Specifically, in accordance with 10CFR50.55a(3)(i) Duke Energy Corporation (Duke) proposes an alternative to the requirements of ASME Section III, that provides an acceptable level of quality and safety as those described in Subarticle NB 4232, 1989 Edition with no addendum.

During the replacement of Steam Generators A and B on Unit 1 of the Oconee Nuclear Station, it was determined that the as-built weld configurations at several locations on the Reactor Cooling System piping did not meet taper requirements stipulated in NB 4232.1.

Relief is requested to use NB 3650, "Analysis of Piping Products" and NB 3200, "Design by Analysis", to show that the as-built weld configurations are within the stress and fatigue allowable limits of the ASME Section III Code, 1989 Edition and are acceptable.

Therefore, Duke requests that the NRC grant relief as authorized under 10 CFR 50.55a(g) (6) (i).

p4jq7 www. duke-energy. corn

U. S. Nuclear Regulatory Commission May 17, 2004 Page 2 If there are any questions or if further information is needed you may contact R. P. Todd at (864) 885-3418.

Very

yours, R.

oe site e President, Oconee Nuclear Station Attachment xc w/att: L. A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SWW, Suite 23T85 Atlanta, GA 30303 L.

N.

Olshan, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 xc(w/o attch):

M. C. Shannon Senior NRC Resident Inspector Oconee Nuclear Station Mr. Henry Porter Division of Radioactive Waste Management Bureau of Land and Waste Management SC Dept. of Health & Environmental Control 2600 Bull St.

Columbia, SC 29201 2

Duke Energy Corporation Oconee Nuclear Station (ONS)

Unit 1 Replacement of Steam Generators Request for Relief 04-ON-007 Pursuant to 10CFR50.55a(3)(i) Duke Energy Corporation (Duke) proposes an alternative to the requirements of ASME Section III, that provide an acceptable level of quality and safety as those described in Subarticle NB 4232, 1989 Edition with no addendum.

1. Components for Which Relief is Requested The following Reactor Coolant System welds that were completed during the replacement of Steam Generators A & B on Unit 1:

1-RC-289-7V Cold Leg lAl 1-RC-289-6V Hot Leg IA Riser I-RC-289-8V Cold Leg 1A2 1-RC-289-5V Hot Leg IA RSG Nozzle 1-RC-289-3V Cold Leg 1B2 1-RC-289-2V Hot Leg lB Riser 1-RC-289-4V Cold Leg IBi I-RC-289-IV Hot Leg lB RSG Nozzle

2. Code Requirement ASME Section III, Paragraph NB 4232, "Alignment Requirements When Components are Welded from Two Sides" and Subparagraph NB 4232.1, "Fairing of Offsets", 1989 Edition.

13

3. Code Requirements for Which the Alternative is Requested Relief is requested from the requirements of ASME Code,Section III, 1989 Edition, no Addendum, Paragraph NB 4232 for at least a 3 to 1 straight line taper over the width of the finished weld.
4. Basis for Relief During the replacement of Steam Generators A and B on Unit 1 of the Oconee Nuclear Station, it was determined that the as-built weld configurations at several locations on the Reactor Cooling System piping did not meet the taper requirements on the inside diameter (ID) of the welds as stipulated in NB 4232.1.

The actual geometry over the width of the finished weld resembles a counterbore rather than the required 3:1 taper.

Request for Relief 04-ON-007 Base metal was applied to the counterbore area on the inside diameter avoiding welding ferritic filler material over the cladding. Cladding was then applied as weld metal overlay on the ID base metal and faired in opposing directions across the weld leaving a smooth surface with a small amount of concavity.

Relief is requested to use NB 3650, "Analysis of Piping Products" and NB 3200, "Design by Analysis", to show that the as-built weld configurations are acceptable

5. Proposed Alternative Duke proposes to use a combination of NB 3200, "Design by Analysis" and NB 3650, "Analysis of Piping Products" to show that the subject welds are within the stress and fatigue allowables of the ASME Section III Code, 1989 Edition.
6. Justification for the Granting of Relief Deviations from standard code configurations for welds and other piping components are allowed as long as the piping analysis performed in accordance with NB 3650 reflects the actual configurations (as-built) and still meets code allowable stresses. Even when a design does not satisfy the requirements of NB 3650, NB 3630, "Piping Design and Analysis Criteria", allows the use of the more detailed alternative analysis methods of NB 3200.

Duke has performed the piping analysis of the as-built configuration of the joints using NB 3683 stress indices in the stress intensity and fatigue calculations as required in NB 3650. Cross sectional properties for the stress calculations were based on the minimum measured thickness at each location. In all locations, the actual stresses and cumulative usage factors were below the allowables of NB 3650.

The hot leg to Replacement Steam Generator weld does not fit entirely into any of the joint categories of NB 3683. The stress indices used in the as-built analysis for this location were for an "as welded" 3 to I taper with consideration for the intersecting "flush" longitudinal butt weld in the piping.

The indices are not completely applicable because the 1.lT to 0.875T restriction of NB 3683.5 could not be completely satisfied. The weld transition does satisfy the 3 to 1 taper. The use of the 3 to 1 transition indices was substantiated by performing a confirmatory NB 3200 analysis to illustrate that the indices chosen were conservative. This analysis consisted of an axi-symmetric 2-D finite element model of the as-built joint to calculate stress indices for the internal pressure case, and a 3-D 1800 finite element model of the as-built joint to calculate stress indices for the moment loading case.

The following table provides the results of the finite element 2

Request for Relief 04-ON-007 analyses and shows that the NB 3683 stress indices used in the NB 3650 stress and fatigue calculations for this weld joint are conservative.

Stress Indices Bi Cl B2 C2 NB 3200 Finite Element 0.39 0.89 0.91 1.19 NB 3683 0.5 1.0 1.0 2.1

7. Implementation Duke has confirmed that primary stress intensities (NB 3650 Eqn. 9), primary plus secondary range stress intensities (NB 3650 Eqn. 10), and cumulative usage factors of the as-built piping configurations, including weld joints, are within allowables of the ASME Section III Code, Subsection NB 3650, 1989 Edition. Therefore this alternative provides an acceptable level of quality and safety.