TABLE OF CONTENTS (Cont'd) 3.4 and 4.4 3.5 and 4.5 3.6 and 4.6 3.7 and 4.7 Standby Liquid Control System A.
System Operation B.
Boron Solution Requirements C.
3.4 and 4.4 Bases Core and Contalnment/Spray Cooling Systems A.
ECCS Systems B.
RHR Intertie Return Line Isolation Valves C.
Containment Spray/Cooling System D. RCIC E.
Cold Shutdown and Refueling Requirements F.
Recirculation System 3.5 and 4.5 Bases Primary System Boundary A.
Reactor Coolant Heatup and Cooldown B.
Reactor Vessel Temperature and Pressure C. Coolant Chemistry D.
E.
SafetylRelief Valves F.
Deleted G.
Jet Pumps H.
Snubbers 3.6 and 4.6 Bases Containment Systems A.
Standby Gas Treatment System C.
Primary Containment Isolation Valves E.
(Deleted) 3.7 Bases 4.7 Bases 93ge 93 93 95 96 99 101 101 103 104 105 106 107 110 121 121 122 123 126 127 128.
129 145 156 156 166 169 170 I
175 183 Ai Amendment No. 9, 35. 47, 71. 77. 7.102,137, 138
3.0 LIMITING GAS CONTROL SYSTEM 4.0 SURVEILLANCE REQUIREMENTS 3.0 LIMITING GAS CONTROL SYSTEM 4.0 SURVEILLANCE REQUIREMENTS I
E.
(Deleted)
E. (Deleted) 172 Amendment No.
L4.1
, 138 I
3.714.7 NEXT PAGE IS 175
Table 3.14.1 Instrumentation for Accident Monitoring Function Total No. of Minimum No. of Required Instrument Channels Operable Channels Conditions Reactor Vessel Fuel Zone Water Level 2
A, B Safety/Relief Valve Position 2
1 A, C (One Channel Pressure Switch and One Channel Thermocouple Position Indication per Valve)
Drywell Wide Range Pressure 2
1 A, B Suppression Pool Wide Range Level 2
1 A, B Suppression Pool Temperature 2
1 A, D Drywell High Range Radiation 2
1 A, D Offgas Stack Wide Range Radiation 2
1 A, D Reactor Bldg Vent Wide Range Radiation 2
1 A, D
- Required Conditions I
A.
When the number of channels made or found to be inoperable Is such that the number of operable channels Is less than the total number of channels, either restore the Inoperable channels to operable status within seven days, or prepare and submit a special report to the Commission pursuant to Technical Specification 6.7.D within the next 30 days outlining the action taken, the cause of the Inoperability, and the plans and schedule for restoring the system to operable status.
3.14/4.14 229b Amendment No. 2,37, 63,404, 138
Table 4.14.1 Minimum Test and Calibration Frequency for Accident Monitoring Instrumentation Instrument Channel Test (Note 1)
Calibration (Note 1)
Sensor Check (Note 1)
Reactor Vessel Fuel Zone Water Level Monitor Once/Operating Cycle Oncelmonth (Note 3)
SafetylRelief Valve Position (Pressure Switches)
Once/Operating Cycle Oncelmonth (Notes 2 & 4)
SafetylRelief Valve Position (Thermocouples)
Once/Operating Cycle Oncelmonth (Note 4)
Drywell Wide Range Pressure Monitors Once/Operating Cycle Once/month Suppression Pool Wide Range Level Monitors Once/Operating Cycle Oncelmonth Suppression Pool Temperature Once/Operating Cycle Once/month Drywell High Range Radiation Monitors Once/Operating Cycle Oncelmonth Offgas Stack Wide Range Radiation Monitors Once/Operating Cycle Oncelmonth Reactor Bldg Wide Range Radiation Monitors Once/Operating Cycle Once/month Notes:
(1)
Functional tests, calibrations, and sensor checks are not required when the instruments are not required to be operable. If tests are missed, they shall be performed prior to returning the instruments to an operable status.
(2)
Oncelmonth sensor check will consist of verifying that the pressure switches are not tripped.
(3)
Oncelmonth sensor check will consist of verifying that the fuel zone level indicates off scale high.
(4)
Following every Safety/Relief Valve actuation it will be verified that recorder traces or computer logs Indicate sensor responses.
I 3.1414.14 229d Amendment No. 2, 37-, 631 38