MONTHYEARML0413504792004-05-17017 May 2004 Company - Supplemental Response to the April 29, 2003, Orders Modifying Licenses for Revised Design Basis Threat (TAC MC2974 and MC2975) Project stage: Other ML0417400602004-06-21021 June 2004 Co, Units 1 and 2, RAI, Security Plan Sections 10-19 Project stage: RAI ML0421101072004-07-23023 July 2004 Co, Units 1 and 2, RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2974 and MC2975) Project stage: RAI ML0431800102004-10-28028 October 2004 Company, Units 1 and 2, Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat... Project stage: Other 2004-05-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] |
Text
May 17, 2004 James J. Sheppard President and Chief Executive Officer South Texas Project Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING COMPANY, UNITS 1 AND 2 - SUPPLEMENTAL RESPONSE TO THE APRIL 29, 2003, ORDERS MODIFYING LICENSES FOR REVISED DESIGN BASIS THREAT (TAC NOS.
MC2974 AND MC2975)
Dear Mr. Sheppard:
On April 29, 2003, the Nuclear Regulatory Commission (NRC) issued Orders modifying the operating licenses for South Texas Project Electric Generating Company, Units 1 and 2 to:
(1) require compliance with a revised Design Basis Threat (DBT); (2) implement new security force personnel training and physical fitness requirements; and (3) prescribe compensatory measures related to fitness-for-duty enhancements applicable to security force personnel.
Section III.A.1 of EA-03-086 (DBT Order) required that all licensees submit revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, based on the revised DBT, to the NRC for review and approval no later than April 29, 2004. The DBT Order further requires licensees to implement the revised physical security plans, revised safeguards contingency plans, and revised security force personnel training and qualification plans no later than October 29, 2004.
By letter dated April 27, 2004, you submitted a supplemental response to the Order for South Texas Project Electric Generating Company, Units 1 and 2.
Mr. Sheppard The NRC staff will review your physical security plan in the months of May and June, your training and qualification plan during July, and your contingency plan during August. Should further information regarding your submittals be necessary to support our review, you will be notified promptly.
The NRC staff plans to complete the review of your supplemental responses by October 29, 2004.
Sincerely, John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page
ML041350479 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR/SSC SPRT/NSIR SPRT/NRR/SC NAME MChernoff CHawes PPeduzzi JPeralta JNakoski DATE South Texas Project, Units 1 & 2 cc:
Senior Resident Inspector A. H. Gutterman, Esq.
U.S. Nuclear Regulatory Commission Morgan, Lewis & Bockius P. O. Box 910 1111 Pennsylvania Avenue, NW Bay City, TX 77414 Washington, DC 20004 A. Ramirez/C. M. Canady Mr. T. J. Jordan, Vice President City of Austin Engineering & Technical Services Electric Utility Department STP Nuclear Operating Company 721 Barton Springs Road P. O. Box 289 Austin, TX 78704 Wadsworth, TX 77483 Mr. L. K. Blaylock S. M. Head, Manager, Licensing Mr. W. C. Gunst Nuclear Quality & Licensing Department City Public Service Board STP Nuclear Operating Company P. O. Box 1771 P. O. Box 289, Mail Code: N5014 San Antonio, TX 78296 Wadsworth, TX 77483 Mr. C. A. Johnson/A. C. Bakken Environmental and Natural Resources AEP Texas Central Company Policy Director P. O. Box 289 P. O. Box 12428 Mail Code: N5022 Austin, TX 78711-3189 Wadsworth, TX 77483 Jon C. Wood INPO Matthews & Branscomb Records Center 112 East Pecan, Suite 1100 700 Galleria Parkway San Antonio, TX 78205 Atlanta, GA 30339-3064 Arthur C. Tate, Director Regional Administrator, Region IV Division of Compliance & Inspection U.S. Nuclear Regulatory Commission Bureau of Radiation Control 611 Ryan Plaza Drive, Suite 400 Texas Department of Health Arlington, TX 76011 1100 West 49th Street Austin, TX 78756 D. G. Tees/R. L. Balcom Texas Genco, LP Brian Almon P. O. Box 1700 Public Utility Commission Houston, TX 77251 William B. Travis Building P. O. Box 13326 Judge, Matagorda County 1701 North Congress Avenue Matagorda County Courthouse Austin, TX 78701-3326 1700 Seventh Street Bay City, TX 77414 May 2003
South Texas Project, Units 1 & 2 cc:
Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483