MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:Meeting Summary
MONTHYEARML23303A0662023-11-0606 November 2023 October 2023 Environmental Scoping Meetings Re Perry Nuclear Power Plant License Renewal Application Meeting Summary Memo ML23187A4692023-07-0606 July 2023 Summary of the June 22, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML23065A2192023-03-15015 March 2023 Second Safety Pre-Application Meeting Summary ML22258A0632022-09-26026 September 2022 July 21, 2022, Perry Nuclear Plant, Unit 1 License Renewal Environmental Pre-Application Meeting Summary - Letter ML22213A0362022-08-29029 August 2022 Safety Pre-Application Meeting Summary ML22147A0372022-05-31031 May 2022 Summary of the May 19, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML21055A2642021-03-0202 March 2021 Summary of February 16, 2021, Teleconference with Energy Harbor Nuclear Corp. to Discuss Potential License Amendment Request Related to Revising Flood Mitigation for Perry Nuclear Power Plant, Unit No. 1 ML20324A2192020-11-23023 November 2020 Summary of November 18, 2020, Teleconference with Energy Harbor Nuclear Corp. to Discuss Potential Changes to the Emergency Plan for Perry Nuclear Power Plant, Unit No. 1 ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML20163A6272020-06-15015 June 2020 Summary of Public Telecon with Energy Harbor on License Renewal for Perry Nuclear Plant ML19249C7652019-09-0404 September 2019 Summary of the July 17, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Perry Nuclear Power Plant ML18332A4122018-12-0303 December 2018 Summary of Public Teleconference Call with Firstenergy Nuclear Operating Company Regarding Proposed Revisions to the Emergency Plan ML18117A1672018-04-25025 April 2018 Summary of Public Outreach/Open House to Discuss the NRC 2017 End-Of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 ML18065A1392018-03-15015 March 2018 Summary of February 21, 2018, Public Meeting with Firstenergy Nuclear Operating Company Regarding a Proposed Revision to the Perry Nuclear Power Plant, Unit 1, Fire Protection Program ML17234A5542017-08-24024 August 2017 Summary of Telephone Conference with Firstenergy Nuclear Operation Co., Regarding Verbal Authorization of Relief Request to Use Alternative for Perry Nuclear Plant, Unit 1 ML17205A0242017-07-19019 July 2017 Summary of July 11, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML17193A4192017-07-17017 July 2017 Summary of June 29, 2017, Public Meeting with Firstenergy Nuclear Operating Company Regarding a Proposed License Amendment Request for Perry Nuclear Power Plant, Unit 1, to Revise the Flooding Licensing Basis ML16321A0052016-11-21021 November 2016 Summary of November 9, 2016, Public Teleconference Call Regarding Upcoming Perry Nuclear Power Plant, Unit 1 License Amendment Request to Revise Technical Specifications to Support Implementation of Alternate Source Term Amendment ML16180A1352016-06-22022 June 2016 Summary of Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and 2015 End-of-Cycle Performance Assessment of Perry Nuclear Power Plant ML16053A3432016-02-24024 February 2016 2/9/16, Summary of Public Teleconference Call with Firstenergy Nuclear Operating Company Regarding Upcoming Perry Nuclear Plant, Unit 1 License Amendment Request to Revise Technical Specifications for Suppression Pool Water Level & Makeup S ML15280A2002015-10-0909 October 2015 Summary of Meeting with Firstenergy Nuclear Operating Company, on Fenoc'S Upcoming Request to Change Emergency Action Levels at Perry Nuclear Power Plant, Unit 1 ML15075A2462015-04-0808 April 2015 January 7 & 15, 2015 Summary of Meetings with Firstenergy Nuclear Operating Company to Discuss Alternative Source Term Implementation as a Result of Fuel Change ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14296A6892014-11-10010 November 2014 Summary of September 18, 2014, Meeting with Firstenergy Nuclear Operating Company to Discuss Alternative Source Term Implementation as a Result of Fuel Change ML14086A0592014-03-26026 March 2014 3/18/14 Summary of Public Meeting to Discuss the 2013 Perry End-of-Cycle Performance Assessment ML13113A3932013-04-23023 April 2013 4/10/2013 - Summary of Perry Public Meeting to Discuss the 2012 Annual Assessment Results ML13080A2502013-03-21021 March 2013 2/20/13 Summary of Meeting Regarding Inspection Procedure 95002 Inspection ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12276A3362012-10-0202 October 2012 September 19, 2012 - Summary of a Public Meeting to Discuss Constellation Energy Nuclear Group, LLC (Ceng) Fleet Performance ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12144A3202012-05-31031 May 2012 5/8/2012: Meeting Summary - Perry Presubmittal Meeting ML12102A2122012-04-11011 April 2012 4/5/2012 - Summary of Perry Public Meeting ML1123602872011-08-23023 August 2011 8/11/2011- Summary of Public Meeting to Discuss the Perry Nuclear Plant, Unit 1, End of Cycle Plant Performance Assessment ML1122002062011-08-0808 August 2011 Summary of June 26, 2011 Public Meeting to Discuss Constellation Energy Nuclear Group, LLC (Ceng) Fleet Performance ML1021702272010-08-0505 August 2010 Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the Perry Nuclear Power Plant, Unit 1, End-of-Cycle Plant Performance Assessment ML1009502432010-04-0505 April 2010 Meeting Summary of 3-31-10 Public Meeting with FENOC ML1003316682010-02-0202 February 2010 Summary of Public Meeting to Discuss Constellation Nuclear Energy Group Fleet Performance ML0932204092009-11-17017 November 2009 Summary of Public Meeting to Discuss Actions Taken by FENOC to Address Human Performance Substantive Cross-Cutting Issues ML0908600652009-01-28028 January 2009 01/23/09 & 01/28/09 Summary of Telecons Between NRC Staff and Prairie Island License Review Project ML0902605032009-01-22022 January 2009 Summary of Public Meeting to Discuss FENOC Fleet Performance (Davis-Besse, Perry, and Beaver Valley Nuclear Power Plant) ML0834706522008-12-30030 December 2008 Summary of Periodic Meeting with Firstenergy Nuclear Operating Company (FENOC) Staff on Licensing Action Status ML0811506052008-04-24024 April 2008 Summary of Public Meeting with Firstenergy Nuclear Operating Co. to Discuss the 2007 Perry End-of-Cycle Performance Assessment ML0802303062008-01-22022 January 2008 Summary of Meeting with FENOC to Discuss Fleet Performance NEI 06-04, Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant2007-08-21021 August 2007 Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant ML0723203812007-08-21021 August 2007 Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant ML0720701452007-08-0707 August 2007 Summary of June 27, 2007, Public Meeting Regarding Fenoc'S Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event ML0708607382007-03-27027 March 2007 Public Meeting Between NRC Region III and Firstenergy Nuclear Operating Company to Discuss the Nrc'S Assessment of Perry'S Safety Performance for the Period from 01/01/2006 - 12/31/2006 & Decision to Return Perry to Normal NRC Oversight ML0705401462007-02-26026 February 2007 Summary of Closed Meeting with Fenco to Discuss FENOC Fleet Security Issues ML0703101472007-01-29029 January 2007 Summary of Public Meeting with Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants to Discuss FENOC Fleet Performance 2023-07-06
[Table view] |
Text
May 7, 2004 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081
SUBJECT:
SUMMARY
OF THE PERRY NUCLEAR POWER PLANT PERFORMANCE ASSESSMENT MEETING ON APRIL 20, 2004
Dear Mr. Kanda:
On April 20, 2004, a public meeting was held at the Quail Hollow Resort in Painesville, Ohio, between the Nuclear Regulatory Commission (NRC) and FirstEnergy Nuclear Operating Company (FENOC). The purpose of the meeting was to discuss the NRCs assessment of Perry's performance for the period of January 1, 2003, through December 31, 2003.
Overall, as discussed in the Perry Annual Assessment letter dated March 4, 2004 (ADAMS accession number ML040641205), Perry operated in a manner that preserved public health and safety. Plant performance for the most recent quarter was within the Degraded Cornerstone Column of the NRCs Action Matrix, based on two White findings in the mitigating systems cornerstone. The White findings were associated with the failure of the high pressure core spray system pump to start on October 23, 2002, and the failure of the division 1 emergency service water pump during a routine run on September 1, 2003. During the meeting, a third White finding in the mitigating systems cornerstone associated with the air binding of the division 1 waterleg pump on August 14, 2003, was also discussed. Although the issue was not finalized prior to the issuance of the Annual Assessment letter, the finding was entered into the action matrix in the fourth quarter of 2003 and was discussed to present a complete and accurate representation of plant performance for 2003. Also discussed was a White finding in the emergency preparedness cornerstone and a White performance indicator in the occupational radiation exposure cornerstone. The emergency preparedness issue involved the failure to make a timely alert declaration on April 24, 2003, after a fuel pin was damaged during inspection activities in the fuel handling building. The White performance indicator was due to three performance deficiencies which occurred during the second quarter 2003 refueling outage. Although the individual events were determined to be of very low safety significance, collectively the green/white threshold was crossed.
Following the presentation of our assessment, you and members of your staff discussed efforts taken or planned to improve plant performance. Prior to the conclusion of the meeting, our staff responded to several questions from members of the public.
W. Kanda The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Enclosure:
Attendance List cc: G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
W. Kanda The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Enclosure:
Attendance List cc: G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOC UMEN T NAM E: G:\Branch TSS\EOC Ltrs\Mtg Notices 2004\ML041310222.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME PPelke/co MRing DATE 05/07/04 05/07/04 OFFICIAL RECORD COPY
W. Kanda ADAMS Distribution:
AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)
C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1
Attendance List Perry Plant Performance Assessment Meeting April 20, 2004 Name Organization Barry Blair FirstEnergy Nuclear Operating Company (FENOC)
Henry Hegrat FENOC Tim Rausch FENOC Gary Leidich FENOC Suzanne Russell P. Kenneth Russell FENOC Adi Donato Cleveland Electric Illuminating Company Mary OReilly FENOC J. J. Hagan FENOC George Brewer FENOC Susan Hiatt Ohio Citizens for Responsible Energy, Inc. (OCRE)
Michael Blair New s-Herald Dale Miller FENOC Connie Kline Ohio Care - Citizens Against a Radioactive Environment Dan Gallo FENOC Ale xander Velyko vic George A. Zo kle Capri Cafaro for Congress Paul Bordley FENOC Bill Kanda FENOC Jeff Mc Guire FENOC Lew M yers FENOC Peter Robe rts FENOC Frank Ross FENOC George D uja novic FENOC Neal Bonner FENOC Rodney Nespeca Capri Cafaro for Congress Capri S. Cafa ro Dem ocratic Nominee for Congress - 14th Dis trict - O hio David Truman New s-Herald Diane Flowe rs U. S. Nuclear Regulatory Commission (NRC)
Liliana Ramadan NRC Jam es Ca ldw ell NRC Mark Ring NRC Ray Pow ell NRC Jan Strasma NRC Jeffrey Lausberg FENOC Joe Mosbrook FENOC Vernon K. Higaki FENOC David A. Bowen FENOC Pat Duszynski FENOC Tony Duszynski FENOC Robert Coad FENOC Dan Gallagher FENOC Ed Root FENOC Adam Turinsky Sargent & Lundy Name Organization
Ronald Rosel FENOC Mike McFarland FENOC M. Schimm el FENOC D on T im m s FENOC To m Len tz FENOC John Messina FENOC John La ituri Fred von Ahn FENOC Peter Author FENOC Brenda Alvord FENOC Bill OMalley FENOC Ke nny Fe rrell FENOC Russ Kearney FENOC An dy Kolarcik FENOC Darlene Kearney public