MONTHYEARML22309A0062022-12-12012 December 2022 Public Non-Sensitive Meeting Summary on Clarification Call with Holtec Regarding Request for Additional Information for Indian Point Unit 2 Master Decommissioning Trust Agreement as Per Indian Point Nuclear Generating Facility Unit 1 and 2 ML21342A1402021-12-0909 December 2021 Summary of Public Meeting in Tarrytown, Ny, to Discuss Indian Point Units 1, 2, and 3 (IPEC) Post-shutdown Decommissioning Activities Report ML21055A9122021-02-24024 February 2021 (E-mail Dated 2/24/2021) Summary of Feb 8, 2021, Pre-submittal Meeting for Relief Request No. IP3-ISI-RR-16, Code Case N-513-4 Periodic Inspection Frequency Extension ML20321A0002020-11-17017 November 2020 Summary of 9/30/20 Pre-Submittal Meeting with Entergy to Discuss Proposed One-Time Exemption Request - Biennial Emergency Preparedness Onsite Evaluated Exercise Requirements ML20289A7322020-10-15015 October 2020 2020 Annual Assessment Meeting for Indian Point - Meeting Summary ML20083F5962020-03-23023 March 2020 Summary of Teleconference with the National Marine Fisheries Service for Indian Point Biological Opinion ML20059P1292020-03-0303 March 2020 Summary of Partially Closed Pre-submittal Public Meeting with Entergy Nuclear Operations, Inc. to Discuss the Proposed License Amendment Request to Replace the Indian Point Unit No. 3 Crane with a New Holtec High-Lift Crane (EPID L:2019-LRM ML19330F5182019-11-29029 November 2019 Summary of Public Meeting Between the NRC and Entergy Regarding Pre-Submittal of a License Transfer Application to Holtec International for Indian Point Energy Center ML19319A0242019-10-0202 October 2019 NEIMA Meeting - Courtney Williams Comments ML19319A0282019-10-0202 October 2019 NEIMA Meeting - Marilyn Elie Comments ML19319A0272019-10-0202 October 2019 NEIMA Meeting - Linda Puglisi Comments ML19319A0252019-10-0202 October 2019 NEIMA Meeting - Jenean Eichenholtz Comments ML19198A2392019-07-17017 July 2019 Annual Assessment Meeting for Indian Point Energy Center - Meeting Summary ML18200A2722018-07-19019 July 2018 Summary of Annual Assessment Meeting for Indian Point Energy Center ML18131A0572018-05-11011 May 2018 Summary of 04/12/2018 Meeting with the State of New York Regarding the Indian Point Generating Unit No. 2 Reactor Pressure Vessel Head Penetration Alternative Weld Repair ML18117A3162018-04-30030 April 2018 Summary of 04/03/2018 Meeting with Entergy on Planned Submittal of Propose Alternative for Reactor Pressure Vessel Head Nozzle Weld Repair ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18002A2562018-01-30030 January 2018 11/30/2017 and 12/19/2017 Summary Telephone Conference Calls with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point License Renewal Application ML17256A2862017-09-25025 September 2017 Summary of Telephone Call on 09/06/17, Between NRC and Entergy Concerning Next Steps from the Site Audit on 08/1-3/17 ML17180A5032017-09-21021 September 2017 04/19/2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application ML17237A2132017-08-25025 August 2017 Memo E-mail to File -Summary of July 26, 2017, Meeting with Entergy to Discuss Proposed License Amendment Request, New Criticality Safety Analysis ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17160A1652017-06-27027 June 2017 Summary of Telephone Conference Call Held on May 31,2017, Between the NRC and Entergy Nuclear Operations Inc. Concerning Requests for Additional Information Pertaining to the Indian Point, License Renewal Application (TAC Nos. MD5407/MD5408 ML17172A1972017-06-20020 June 2017 Summary of Annual Assessment Meeting for Indian Point Units 2 and 3 ML17157B5422017-06-20020 June 2017 Conference Call on 2nd Round RAIs - Final ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 ML16281A2162016-10-25025 October 2016 10/04/2016,Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Proposed Changes to the Service Water Integrity Program for the Indian Point Nuclear Generating, Units 2 and 3 (IP2 and IP3) License Renewal Application (LRA) ML16209A3712016-08-17017 August 2016 July 21, 2016, Summary of Conference Call Held Between NRC and Entergy Nuclear Operations, Inc. Concerning the Draft RAI for the Review of the Indian Point, Units 2 & 3, License Renewal Application, Set 2016-01 (TAC Nos. MD5407 & MD5408) ML16188A0202016-07-0505 July 2016 Summary of Annual Assessment Meeting for Indian Point Units 2 and 3 ML16133A4992016-06-21021 June 2016 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Safety Review ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15351A2032015-12-30030 December 2015 Summary of Conference Call Held on December 9, 2015, Between the NRC and Entergy Nuclear Operations, Inc. Concerning the Draft Audit Plan for the Service Water Integrity and Fire Water System Aging Management Programs ML15190A2912015-07-22022 July 2015 070115, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Safety Review ML15152A0762015-05-29029 May 2015 Summary of Annual Assessment Meeting for Indian Point Units 2 and 3 on 5/20/2015 ML15120A6442015-05-0606 May 2015 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Safety Review ML15107A1752015-04-28028 April 2015 041615, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review ML15093A5052015-04-14014 April 2015 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Environmental Review ML15051A5022015-03-10010 March 2015 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review ML15022A1602015-02-11011 February 2015 and 01/13/15, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review ML14197A5832014-09-18018 September 2014 Summary of the June 19, 2014, Category 1 Public Meeting with Entergy to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Tear Task Force Recommendation 2.1 ML14260A4312014-09-17017 September 2014 Revised Summary of Annual Assessment Meeting for Indian Point Energy Center on 6/4/2014 ML14238A7262014-09-10010 September 2014 Summary of Conference Call Held on July 30, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations Inc., Regarding a Draft Request for Additional Information on Removal of Certain Aging Management Review Items ML14219A6742014-08-14014 August 2014 July 15, 2014 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Environmental Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License R ML14206B1282014-08-0101 August 2014 June 19, 2014 & July 16, 2014 Summary of Conference Calls Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Regarding Entergy Response to a Request for Additional Information ML14178A8682014-06-25025 June 2014 Summary of Annual Assessment Meeting for Indian Point Energy Center on 6/4/2014 ML14136A0052014-05-27027 May 2014 Summary of Phone Call Between New York State Department of State and U.S. Nuclear Regulatory Commission on May 7, 2014, Regarding the Coastal Zone Management Act Consistency Review ML14105A3542014-04-24024 April 2014 Summary of Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information on the Reactor Vessel Internals Program ML14078A3992014-03-21021 March 2014 Summary of Conference Call Held on February 20, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information on LR-ISG-2012-02 and Draft LR-ISG-2013-01 ML13256A0862013-09-24024 September 2013 Summary of Meeting with Entergy Nuclear Operations, Inc. and Netco on Indian Point Unit 2 Spent Fuel Pool Management 2022-12-12
[Table view] |
Text
May 10, 2004 MEETING
SUMMARY
LICENSEE: ENTERGY NUCLEAR NORTHEAST FACILITY: INDIAN POINT, UNITS 2 & 3
SUBJECT:
SUMMARY
OF APRIL 27TH, 2004, ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR NORTHEAST On April 27th, 2004, at 7:00 p.m., an Annual Assessment Meeting was conducted at Crystal Bay on the Hudson, Charles Point Marina, Peekskill, NY, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Northeast. The NRC requested the meeting with Entergy management to discuss NRCs assessment of the safety performance of Indian Point Nuclear Power Plant for calendar year 2003.
The NRC presented and discussed its assessment of the safety performance of Indian Point Units 2 and 3 for the period between January 1 through December 31, 2003. The NRC presentation included background on both plants, performance assessment results, an overview of calendar year 2004 planned inspections and oversight, and a discussion of general NRC issues. As part of this regulatory performance meeting, Entergy presented an overview of their performance.
The public observed this meeting and was offered the opportunity to communicate with the NRC regarding Entergys performance at Indian Point and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Entergy, the NRC answered questions from the public for approximately four hours.
Sincerely,
/RA/
Eugene W. Cobey, Acting Chief Projects Branch 2 Division of Reactor Projects
Attachment:
Meeting Attendees
2 DOCUMENT NAME: G:\BRANCH 2\ROP-4 FILES\ROP4 Indian Point Annual Assessment Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy 2)),&( 5,'53 5,'53 1
1$0( 06QHOO036 (&REH\(&
'$7(
2)),&,$/5(&25'&23<
MEETING ATTENDEES - Key Players NAME ORGANIZATION Ron Bellamy Decommissioning Branch Chief, NRC Rob Berryman Resident Inspector, NRC Mark Cox Resident Inspector, NRC Fred Dacimo Site Vice President of Indian Point, Entergy Pete Drysdale Senior Resident Inspector, NRC Tom Hipschman Senior Resident Inspector, NRC Brian Holian Deputy Director, NRC Brian McDermott Indian Point Branch Chief, NRC Patrick Milano Indian Point Project Manager, NRC Hubert Miller Regional Administrator, NRC Patricia Milligan Emergency Preparedness Senior Engineer, NRC Steve OConner Spent Fuel Project Senior Engineer, NRC Chris Schwartz Plant Manager, Entergy John White Radiation, Safety & Safeguards Branch Chief, NRC