ML041130444
| ML041130444 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/30/2003 |
| From: | Ernstes M Operator Licensing and Human Performance Branch |
| To: | Scarola J Carolina Power & Light Co |
| References | |
| 50-400/04-301, ES-301, ES-301-2 50-400/04-301 | |
| Download: ML041130444 (144) | |
See also: IR 05000400/2004301
Text
HARRIS EXA
50-400/2004-30 I
FEBRUARY 23 - 27,2004
& MARCH 4,2004 (WRITTEN)
Control Room I In-Plant Systems Outline
FORM ES-301-2
HARRIS
Date of Examination:
Examination Level.
Operating Test Number,
SystemlJPM Title
li
Transfer 6.9KV Buses from Unit Auxiliary Transformers to the
Startup Auxiliary Transformers per OP-I 56.02
II b.
Perform Containment Cooling System Operability Teat per OS
1018
II
Isolate the SI Accumulators following a LOCA per PATH-1 and
Start the Turbine Driven Auxiliary Feedwater Pump per OQ-13;
Transfer to Cold Leg Recirculation per EOQ-EPP-Ole)
'
Perform Control Rod and Rod Position Indicator Exercise per
OST-1005
11 Place Audio Count Kate Drawer in Sewice per QP-'105
Align CCW to Support RHR System Operations per OP-145
Local Makeup to the VCT Using the Emergency Boration Valve
tions for placing an OTAT channel in Test per
(I
Locally operate a SG P O W per EOP-EPP-012 and OP-126
Type
Code'
N i A i S
D I S
N I A I S I L
M l S l L
M i A i S I L
D I A I S
Safety
Function
(MA # - RO Imp)
6
(062A4.07 - 3.7)
5
(022A4.04 - 3.6)
3
(000Ol 1 EA1 .I3 - 4.1)
45
(061A3.01 - 4.2)
2
(006A4.05 - 3.9)
1
( Q O l M . 4 1
~ 4.4)
7
(015A4.02 - 3.9)
a
(08BA4.81 - 3.3)
1
(004A2.07 - 3.4)
(8t284.04 ~ 3.3)
4s
I (000574EAI .Q4 - 3.9)
- Type Codes: (D)irect from bank, (M)odified from bank. (N)ew, (A)lternete path, (6)ontrol Room. (S)imulator, (L)ow
NUREG-2021, Draft Revision 9
Control Room i In-Plant Systems Outline
Date of Examination:
Examination Level:
SRQ-U
Operating Test Number:
Control Room Systems (8 for RO; 7 for SRO-l; 2 or 3 for SRO-Ll)
~~
System/JPM Title
a.
Transfer 6.9KV Buses from Unit Auxiliary Transformers to the
Startup Auxiliary Transformers per OP-l56.02
b.
NOT APPLICABLE FOR SRB-U
e.
isolate the SI Accumulators following a LOCA per PATH-4 and
OP-I 10
d.
NOT APPLICABLE FOR SRO-U
e.
NOT APPLICABLE FOR SRO-U
f.
NOT APPLICABLE FOR SRO-U
9.
NOT APPLlCA5LE FOR SRO-U
h.
NOT APPLICABLE FOR SRO-U
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRQ-U)
Type
Code'
Nt'AiS
N I A I S I L
I.
Local Makeup to the VCT Using the Emergency Beratian Valve I
D I R
Perform local actions for placing an OTAT channel in Test per
QWP-RP-0 4
Locally operate a SG PBWV per EOQ-EPP-012 and OP-I26
Safety
Function
6
(062A4.07 - 3.1)
3
(000OllEA1.13 -4.2:
1
(004A2.07 s 3.7)
7
(012A4.04 - 3.3)
4s
(000074EA1.04 - 4.1)
- Type Codes: (D)irect from bank. (M)odified from bank. (N)ew. (A)lternate path, (C)ontrol Room, (S)imulator, ( b ) ~
Power, (R)CA
NUREG-1021, Draft Revision 9
JPM CQM-SM(a)
HARRIS
m@IoN I1
INITIAL LICENSE EXAMINATION
JOB PEWORMANCE MEASURE
JPM CQM-SIM(a)
Transfer 6.9KV uses from Unit Auxiliary
Transfomers to the Startup Auxiliary
Transformers
APPLICANT:
EXAMINER:
JPM COM-SIM(a)
HARRIS
REGION TI
INITIAL LICENSE EXAMINATION
JOB PERFORh4ANCE M E A S W
TASK:
Transfer 6.9KV Buses from Unit Auxiliary Transformers to the Startup
Auxiliary Transformers
A1,'I'ERNA'I'E PATH:
Breaker 102, WIT AUX XFMR A TO AUX BUS D, fails
to open when required
FACILI'TY JPM KUMBER:
NEW
K.4:
062A34.07
IMPOKTANCE:
3.1
3.1
KA S'TATEMENT:
Ability to manually operate andor monitor in the control
room: Synchronizing and paralleling of different ;u: supplies
TASK STANDARD:
A m Buses A & D are both powered fikom SUT EA md
Breaker 10% has been manually opened
PEFEWWB EVALIJATION LOCATION:
SIMULATOR
PKEFEKED EVALUATION METHOD:
PERFORM
REFbKENCES:
_.
IN PLANT
SIMULATE
-
I
-
AOP-038, Rapid Downpower. Rev 7
OP-156.02, AC Electrical Distribution, Rev 40
10
MINUTES
TIME CRITICAL:
No
P
VAIdDATION TIME:
APPLICANT:
START TIME:
FINISH TIME:
PERFORMANCE TIME:
MINUTES
PERFORMANCE RATING:
UNSAT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of 9
JPM COM-SPMca)
H A W S
TOOLS / EQUIPMENT / PROCEDURES NEEDED:
0
Initialize to saved IC-141
0
m E FOLLOWING STEPS DESCRIBE THE STEPS NEEDED TO ESTABLISH
CONDIIIONS IN IC-161
Q
Reset to IC-11 ( ~ O % ~ O I W P ; I .
0
FREEZE the simulator.
Q
Enter ma/j'unction to prevent breaker 102.fkom nutomatical& opening upon c!osurr of
hreaker IOi - breaker 102 can he manually opened G!2PLS09B>.
0
When Applicant is ready, place simulator in RUN.
0
0
OP-156.02. h C Electrical Distribution
READ TO OPERATOR
INS'I'RUCTHOKS -1 0 APPLICANr:
If simulated. no actual plant controls or equipment are to be operated during the
performance of this JPM. If' performed on the simulator, then take all actions as you
normally would in the Control Roam. You should silence all annunciators and
determine if they are associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, but not limited to. proper
communication. place-keeping, ALARA and use of personal protective equipment. All
actions t,&en by you should be clearly demonstrated and verbalized to the evaluator.
Before starting. initial conditions and initiating cues will be described and you may
ask for clarification if needed.
You may use any normally available reference materials; however, immediate, actiom,
ifany, are to beper-ormtadfrom memory. Describe the actions you are taking and the
indications you are Booking at during the performance of the JPhf; the evaluator will
then provide you cues describing the condition ofthe indication if not otherwise
available. Report compk.bini8 offkhe task as you would iit fiseplailf.
During the course of the walk-through examination, there may be some tasks you will
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 9
JPM COM-SIM(a)
HARRIS
INITIAL CONDITIONS:
The plant is being shutdown per AOP-038, Rapid IX~~mpower.
INITIAIING CUE(S):
You have been directed to perform Step 25 of AOP-038 to transfer 6.9KV Buses from
thc Unit Auxiliary Transformer to the Startup Auxiliary Transformer per OP-156.02,
Section 7.1, "Transferring 6.9KV Auxiliary Buses 1A and 111 from UAT BA to SUT
1A."
' b e prerequisites of Section 3.0 in OP-156.02 have been completed.
JPM COM-SIM(a)
HARRIS
STAR?' TIME:
- DENOTES CRITICAL STEP
PWOC
STEP
Tzr===-
7.1.1
Note
before
7.1 2.1
7.1.2.1
7.1.22
7.1.2.3
ELEMENT
Obtains copy of UP- 156.02,
Section 7.1
biitial Conditions
1. All prerequisites in
Section 3.0 are met.
2. Aux Buses 1A and 1D
31x3 powered from UAT
IA per Section 5.1 1 of
this procedure.
3. Network grid breakers
are closed and providing
power to SUI' I A
(Switch yard Breakers
52-2 and/or 52-3).
4. If Switchyard Grid
Breakers 52-2 and/or 52-
3 are not closed, close
the breakers per Section
8.29 if desired.
through 9.1.2.010 are
m:
Steps 7.1.2.01
pcrfoked at the MCB.
Verify the availability of
SBJT 1'4 as indicated by the
following voltmeters reading
between 6.55 and 7.25KV.
a. EI-503, X WINDNG
VOLTS.
b. EI-504, Y WINDNG
VOLTS.
Place the START UP AUX
XFMR A TO AUX BUSES
A & D SYNCHRONIZER
switch in the BKR-197
position.
Veri@ synchroscope is at the
12 O'CLOCK position.
STANDARD
Obtains copy of OP-
156.02, Section 7.1
Verifies Initid
Conditions ab being
complete:
1. Prerequisites met
2. Buses lA w d ID
powered from UAT
1A
3. SU'I 1A energized
Review note
indicating between 6.55
and 7.25 KV
Places Synchmnizer
switch to BKR-107
position
Verifies synchroscope
pointing to 12 o'clock
position
NOTES
CRITICAL TO
ALLOW
BREAKER107 TO
CLOSE.
____i
,f9
PWOC
S1EP -
Note
before
7.1 2.4
Caistion
before
7.1.2.4
7.1.2.4
7.1.2.5
7.1.2.6
7.1 2.7
Note
before
7.1.2.8
Caution
before
7.1.2.8
7.1.2.8
-
ELEMENT -
When breaker 107 is placed
in the CLOSE position and
subsequently
released, breaker 108 will
open.
CAUTION
If Breaker 108 fails to open,
observe Precaution and
Limitation 4.0.016.
Place B m A K E R 107,
START UP XFMR A TO
AUX BUS A, to the
CLOSE
position.
Verify the following:
a. Auxiliary 131.15 A vdiage
remains between 6.55
and 7.25KV as indicated
on EI-560.
b. BREAKER 108, UNIT
AUX XFMR A TO
AUX BUS A, is open.
Place the STAMT UP
XFMR A T O AUX BUSES
A & D SYNCHRONIZER
SwitSh to the B n - l O 1
position.
Verify synchroscope is at the
12 OCLOCK position.
NQ)TE
When breaker 101 is placed
in the CLOSE position and
subsequently
released, breaker 102 will
open.
CAUTION
If Breaker 102 fails to open,
observe Precaution and
Limitation 4.0.0.016.
Place BREAKER 101,
START UP XFMR A TO
AUX BUS D, to the
CLOSE position.
a
____I
STANDARD
-
Reviews note
Reviews caution
Rotates handswitch for
BKR 107 to CLOSE
position
Verifies
a.
Aux Bus A voltage
indicates between
6.55 and 7.25 KV
b.
Verifies BKR 108
opens by green
light indication
Places Synchronizer
switch to BKR-101
position
Verifies synchroscope
pointing to 12 oclock
Dosition
Reviews note
Reviews caution
RBtates handswitch for
BKR 101 to CLOSE
position
NOTES
SAT I!
UNSAT
CRITICAL TO
PROVIDE
PQWER FOR
AUX BUS A
PROM SCT 1A.
CRITICAL T O
ALLOW
BREAKER 101 TO
CLOSE.
CRITICAL TO
PROVIDE
POWER FOR
AUX BUS D
FROM SUT 1A.
Page 6 of 9
STEP
16 -
-
"17
PROC
STEP
7.1.2.9
P&L
4.0.0.16
CUE: SA
ELEMENT
STANDARD
indicates between
and 7.25KV as indicated
6.55 atad 7.25 KV
on BI-561.
b.
Verifies BKR 102
AUX XFMR A TO
AUX BUS D, is open.
b. BREAKER 102, KJNIT
FAILED TO
OPEN by red light
remaining ON and
KV AUX BUS D
PARALIXLED
ALB-022-3-2,6.9
Limitation 4.0.0.016.
Inadvertent paralleE
operations through the
limited to no longer than
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Parallel
operations becomes a
concern mainly on an
electrical fault. With the
the available fault current
may exceed the
interrupting capability of
the 6.9 KV breakers.
Circulating current can
cause excessive heating of
the components and
canduetors, or exceed the
rating of those
components. The Startup
and Auxiliary
Transformer limiting
rating is 2,800 amps.
of breaker to open
I
1 ACXNO WLEDGES REPORT AND DIRECTS YOU i
~
NOTES
CRITICAL TO
iNFORlM SRQ OF
FAILCJRE OF
RKR 102 TO
OPEN TO
PREVENT
EXCESSIVE
PARALLEL
OPERATION.
OPEN BREAKER
SAT i
LJNSAT
Page 7 of 9
JPM CQM-SIM(a)
HAMU5
-
STEP
18 -
I9
2 0
7.1.2.9
=
Opens Breaker IO2 when
directed
XFMR A TO AlJX BUSES
A & D SYNCHRONIZER
I switch to the OFF position.
7. I 2 . 1 i
I Perform Attachment I,
Transformer Electrical
TASK COMPLETE
I
I
STANDARD
A
Opens breaker by
holding IHMK
SWITCH in THK
position while
placing handswitch
for BREAKER 102.
UNIT AUX XFMR
A TO AL!X BUS D,
in OPEN position.
B
Verifies BKR IO2
open by green light
ON and red light
OFF
Places Synchronizer
witch to OFF position
Informs SRO that
Attachment 1 requires
I
1
T 4.
I
STOP TIME:
JPM COM-SIM(a)
HARRIS
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The plant is being shutdown per AOP-0363, Rapid Dawnpower.
iNITI4THNG WE(S):
You have been directed to perform Step 25 af AOP-038 tu transfer 6.9KV Buses from
the Unit Auxiliary Transformer to the Startup Auxiliary Transformer per OP-156.02,
Section 7.1
~ Transferring 6.9KV Auxiliiuy Buses IA and 1D from IJAT la to SUT
1 A.
The prerequisites of Section 3.0 in OP-156.02 have been completed.
Page 9 of 9
JPM RO-SIMfb)
HARRIS
REGTON II
INITIAL LICENSE EXAMMATION
JOB P E W B M N C E MEASURE
'TA4SK:
ALTERNATE PA?'H:
None
Perform Containment ('ooling System OperabiIity Test
FACILITY JPM NUMBER:
NRC98-B2
KA:
022i24.01
IMPOKI'ANCE:
NA
3.6
Krz STATEMEPX:
Ability to manually operate and/or monitor in the control
room: CCS Fans
One fan is running in slow speed for each cooler with ali
a l m s clear.
SIMULATOR J
IN PLANT
PERFORM
SIMULATE
TASK STANDARD:
PREFERRED EVALUATION I,OCAlION:
PREFERRED EVALUATION METHOD:
RBFF,REN&T;S:
VrlLIDATION TIME:
20
MINUlES
TIME CRITICAL:
No
-
-
-
-
OST- 10 10, Containnient Cooling System Operability Test Monthly
Interval Modes 1 - 4. Rev 14
APPLICANT:
START 'ITME:
FIWHSH TIME:
PERFORML4NCE TIME:
MINUlES
PERFORMANCE RATING:
msm
COMMENTS :
EXAMINER:
Sigtiature
Date
Page 2 of M
JPM RO-SIMfb)
HARRIS
'1'OOI.S i EQUIPMENT i PROCEDURES NEEDED:
Initialize to saved IC-I 62
-rm FCILLOWIKG STEPS DESCEPIBE THE STEPS NEEDED TO ESTABLISH
CONDII'IONS IN IC-162
Reszr to lC-19 (I#O%povvr).
Go to run, acknowledge alarms
Ensure AH--2 & 3 h m e both jiins running in high speed Land thar AH- I & 3 are in
Sfart ESW Pumps SA und SB and ESW Pumps Rooster Pumps SA mid SB
Run sinzulutor until ALB-028. 5.1 and 8.5 me in ALARM
FREEZE the simulatoP.
stmdhy
When Applicant is ready, place simulator in RUN.
OST-10 10, Containment Cooling System Operability Test Monthly Interval Modes 1
- 4
KEAB TO OPERATOR
INSTKBJCTIONS 'ro APPLICANT:
If simulated. no actual plant controls or equipment are to be operated during the
pcrformance of this JPM. If performed on the simulator. then take all actions as you
normally would in the Control Room. You should silence all annunciators and
determine if they are associated with the task you are performing. No flirther action is
requircd for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, but not limited to, proper
communication, place-keeping, ALARA and use of personal protective cquipment. All
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting. initial conditions and initiating cues will be described and you naay
ask for clarification if needed.
You may use any normally available reference materials; however, iinmediate actions,
if nit^, are to brperformedfaom memory. Describe the actions you are taking and the
indications you are looking at during the performance of the JPM; the evaluator will
then provide you cues describing the condition of the indication if not otherwise
available. Report compketiora of the tusk as you would krz fhe plant.
During the course of the walk-through examination, there may be some tasks you will
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 8
JPM RO-SIM(b)
IIARRYS
I N m m CONDITIONS:
The unit is operating at power. Conditions have been established to perform OST-1010,
Containment Cooling Sysrem Operability Test.
The Unit-SCO is aware ofthe Containment high vacuum condition and munciator
procedures have been referenced. The Unit-SCO has given permission to perform the
test. All prerequisites have been performed.
INITIATING CUE( S):
You are directed to perform OST- 101 (3.
Page 4 of 8
SPM RO-SIM(b)
HARRIS
START TIME:
- DENQTES CRITICAL STEP
I'KOC
STEP
- r/A
L'aution
before
3.0.1
7.0.1
Note
before
7.1.1
Note
before
7.1.1
-
ELEMENT'
-
Obtain a copy ofOST-1010
CAUTION When placing an
FSW Train in sewice,
Containment differential
pressure may decrease below
the Tech Spec limit due to
increased ESW cooling
causing a reduction of
Containnient oressure.
Verify both trains of
Emergency Service Water
are in service per OP- 139
with the following pumps
Punning:
8. EMEK SW PUMP A-SA
b. EMER SW PIJMI' B-SB
c. EMEK SW BOOSTER
d. EMEK SW BOOSTER
PUMP A-SA
PI:MP R-SB
NOTE: Service Water flow
data may be collected at any
time in this section.
m:
1,ow tlow alarms
should be anticipated when
fans are running at
different speeds on the same
air shaft.
P
-
STANDARD
e
Wain a copy of OST-
10 10 and enters Section
7.0
Reviews Caution
Verities ESW Pumps A
and B and ESW Booster
Pumps A and B Riming
by checking KED light
on for each pump
Reviews note
Reviews note
NOTES -
Provide applicant
with copy OJ
procedure after
demonstratiota of
ability tu obtain
C W J *
NOTE: When
sh@ing .speed of ehe
Containment Fan
Coolers @om HI-
SPEED to LO-
SPEED in the
remaining steps,
ensure at least 30
seconds allowed for
tlze.fiin io coust
down before starting
in LO-SPEED 10
ntinimize ecyuipn~enl
stresses. (F&L 2)
SAT /
UNSAT
Page 5 of8
JPM RO-SIM(b)
HARRIS
PROC
S'I'EP
Caution
before
7.1.1
7.1.1
7.1.2
7.1.3
7.1.4
7.1.5
7.1.5
7.1.3
7.1.8
ELEMENT
a
CAUTION: If Containment
Temperature reaches I2O"I:
at any time during the
performance of this CPST,
discontinue the performance
of this OST and reduce
Contailmerit 'Temperature
per Tech Spec 3.6.1.5.
I f running, then stop FAN
(Otherwise N/A)
Verify FAN COOLER
AH-1 A-SB is running in
low speed by observing
illuminates
If running, then stop FAN
COOLER AH-3 B-SA
COOLER AH-1 B-SB
(Otherwise N/A)
Verify FAN COOLER
AH-i~-SA
is running in
low speed by observing
illuminates
If running, then stop FAN
(Otherwise N/A)
Verify FAN COOLER
AI33 A-SA is running in
low speed by observing
illuniinates
COOLER AH-2 B-SA
[f running, then stop FAN
(Otherwise NIA)
Verify FAN COOLER
AN-4 A-SB is running in
low speed by observing
illuminates
COOI-ER AH-4 E-SI3
u
Operator verifies Fan B-
SR in FAN COOLER
AH- I is secured and
marks step X A
Operator places Fan
A-SR in FAN
COOLER AH-1 in LO
I
CRITICAL TO
START FAN FOR
TEST.
SA in ~
~
f
i
COOLER
STOP FAN FOR
AN-3 to STOP
1 TEST.
Operator places Fan
CRITICAL TO
A-SA in FAN
STOP, waits 30
seconds. placws in LO
' START FAN FOR
COOLER AH-3 to
A-SA in FAN
STOP, waits 30
seconds, places in LO
START FAN FOR
COOLER AH-2 tQ
sb in FAN COOLE.R
A H 4 is secured and
marks step N/A
ODerator nlaces Fan
I CRlTICAL T n -
START FAN FOR
SAT I
LTNSAT
P
Page 6 of 8
JPM RO-SIM(b)
HARRIS
CONTAINMEN'I' FAN
FZ,OW-O/I,, has cleared
COOLERS All-I LOW
CONTAINMENT FAN
FLOW-B/L, has cleared
COOLBKS AH-3 LOW
CONTAINMEN r FAN
FLOW-OIL has cieared
COOLERS AH-2 LOW
CONTAINMEN r FAN
COOLERS AII-4 I.OW
II
1 CUE: ARTOTHER OPERATOR WILL
STANDARD
Operator verifies
annunciator AI.B-29-3-
2, CONTAINMENT
FAN COOIFRS AH-1
LOW FLOW-OIL,
window is DARK
Operdtor verifies
annunciator ALB-27-8-
2, CONTAINI'JEN?'
FAN COOLERS AH-3
LOW FLOW-OIL,
window is DARK
Operator verifies
annunciator ALIS-21-7-
2, CONTAINMENT
FAN COOLERS AII-2
mw FLOW-O!L,
window is DARK
Operator identifies that
annunciator AI.B-29-4-
2, CONTAINMENT
FAN COOLEKS MI-3
I.0W FLOW-OiL,
window is DARK
E C O D TESTSTOP DA
STOP TIME:
Page 7 of 8
JPM RO-SIM(b)
HAms
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER UPON CQMPLETION OF TASK)
INITIAL CONDITIONS:
The unit is operating at power. Conditions have been established to perform OST-1010,
Containment Cooling System Operability Test.
?he Unit-SCO is anwe ofthe Containment high vacuum condition md annunciator
procedures have been referenced. The LJnit-SCO has given permission to perform the
test. All prerequisites have bcen performed.
INl?IATINCi CUE(S):
You are directed to perform OST-lQl0.
Page 8 of 8
JPM COA?I-SIM(C)
HARRIS
INITIAL LICENSE EXAMINATION
ANCE M E A S W
JBM COM-SIM(c)
Isolate the SI Accumulators following a LOCA
APPLICANT:
EXAMINER:
Page 1 of8
JPM CQM-SIM(c)
HARRIS
REGION II
INITIAL LICENSE EXAMINATION
TASK:
ALTERNATE PATH:
FACILITY JPM WIJMBER:
New
Isolate the SI Accumulators following a LOCA
Requires an awwndator to be vented to containment
KA:
00001 1EA1.13
KA STATEMENT:
TASK STANDtZIPIl:
IMPORTANCE:
4.2
4.1
Ability to operate and monitor the following as they apply
to a Large Break LOCA: Safety injection components
Accumulators A and B have been isolated and
Accumulator C has heen vented
-
SIMULATOR J
INPLANT
P E W O M
J
SIMULATE
-
PREFERRED EVALUATION LOCATION:
PREFERRED EVALUATION METHOD:
-
-
REFERENCES:
VAIXMTION TIMfi:
10
MINUTES
TIME CRITICAL:
No
EPP-009, Post LCPCA Cooldow-n m d Depressurization
OP-1 T 0. Safety Injection, Mcv 32
APPLICANT:
START TIME:
FNISK TIME:
PERFORMANCE TIME:
MINUTES
PERFORM.4NCE RATING:
Sxr
UNSAT
COMMENIS :
EXAMINER:
Signature
Date
Page 2 of 8
JPM COM-SIM(c)
HARRIS
'I'OOLS 1 EQUIPMEKT / PROCEDURES NEEDED:
Initialize to saved IC- 163
THE FQH,LOWING STEPS DESCRIBE TIIE STEPS NEEDED TO ESTABLISH
Initialize to IC- 19 (1 00% power)
insert a small break LOCA (MALF RCS 18 2)
Trip all RCPs
Perform the actions of PATH-1, transition to EPP-009
Cooldown and depressurize to refill the Pressurizer to > 40%
Insert a malfunction to prevent 1 SI-248 from closing
Inscrt the following remote ftmctions - SIS06 CLOSED; SIS007 CLOSED; SIS008
C1,OSED to close the breakers for the accumulator valves
CONDITIONS IN IC-143
FREEZE the simulator
When Applicant is ready, place simulator in RUN
EPP-009 POST I , W A COOI,DOWN AND DEPRESSIRIZATIQX
EPP-009, Post LOG4 Cooidown and Dcpressurization
OP-110, Safety Injection
READ TO OPERATOR
INSTRI JCTIONS TO APPLICANT:
If simulated. no actual plant controls or equipment are to be operated during the
performance of this JPM. If performed on the simulator, then take dl actions as you
normally u ~ u l d
in the Control Room. You should silence all annunciators and
determinc if they are associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, but not limited to, proper
communication. place-keeping, ALARA and use of personal protective equipment. Ail
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues wilt be described and you may
ask for clarification if needed.
You may use any nomially available reference materials; however, immediate actiom,
ifan-y, are to be perfoamedfrom memory. Describe thc actions you are taking and the
indications you are looking at during the performance of the JPM; the evaluator will
then provide you cues describing the condition of the indication if not otherwise
available. Report completion of the task a.~~.'ou
would in the plant.
During the course ofthe walk-through examination. there may be some tasks you will
be asked to perform that may require YOU to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 8
JPM CQM-SIMfc)
HARRIS
INITIAL CONDITIONS :
A sinal1 break LOCA has occtirrcd. Actions have been taken in accordance with
PATH-I. and a transition to EPP-009 has been made.
INITIATING CUE(S):
The SI Accumulator isolation valve breakers l
~
e
been closed. Isolate the SB
Accilmulators in accordance with Step 28 of EQP-EkP-009 POST &OCA
COOTDOViN AND DEPRESSURIZATIONq
Page 4 of 8
JPM COM-SIM(c)
HARRIS
START TIME:
- DENOTES CKHTICAL STEP
-
STEP
1 -
4
PROC
S'SEP
N/A
2R.a
28.b and
28.c
EI,EMEP;T
Obtain COPY of EpP-009,
'Post LOCA Cooldown and
Depressurization" Step 28
[solate SI Accumulators:
3. RCS subcooling greater
than
IOOF r w m - G
20~1: 1 5 0 ~ j
- M
b. PM Ievel greater than
10% [30%1
2. Go to Step 28.e
2. LocalBy unlock AND
close both breakers for
each SI accumulator
discharge valve:
a
ISI-246 (MCC-
IA? 1 -SA-SC)
ISI-247 (MCC-lB21-
e 191-248 (h3CC-
SB5C)
IA2 1-SA3D)
-. ... __
..... .-
..... -.
.... -
TAKERS FOR ISI-246, ISI-
.~ ...
~
Cooldown and
Verifies adequate
subcooling
Verifies adequate
i
subcooling
copy.
7, AND 131-248 HA VE BEEN CLOSED.
I
Page 5 of 8
JPM CQM-SIM(c)
HARRIS
Locates QP-l IO, Safety
Injection, Section 8.3
I
a. If necessaq initiate an
CUE: SI ?ACKNOWLEDGES REP0
8.3.2.2.b
OP- I IO,
8.3.2.2.c
b. Verify shut 1 SI-287,
ACCIJMULATORS &
PRZ PORV N2
SUPP1,Y
c. Declare the associated
per Tech Spec 3.5.1, due
to being connected to
Non-Safety piping
STANDARD
L
Blaceshand
switches for 1SI-
246,1SI-247, and
1 SI-248 BO CLOSE
Verifies 1 SI-246 and
1SI-247 shut by red
light OFF and geen
light ON
Determines 183-248
failed to shut by red
light ON and green
light OFF
Locates procedure and
section
Vents only Accumulator
C during the following
steps
Informs SCO that an
EIR may be necessary
_ _ _ _ ~
NOTES
B
CRITICAL TO
CLQSE ISI-246
AND 1 SI-247 TO
ISOLATE CLAs.
Provide qpllcmt
proeedure after
demonstration of
ability to n&ak
COPY.
with copy of
8
Verifies 1SI-287
Accumulator C is to be
declared inoperable
I
T AND WILL ADDRESS TECH SPECS
WHEN PLANT IS STABLE.
S A T I
UNSAT
Page 6 of 8
JPM COM-SIM(c)
HAFSUS
I
STEP
- ll -
~
12
- 13
~
14
ELEMENT
SUPPLY & VENT for
the Accumulator to be
ACCUMCLATBR
A N2 SUPPLY &
B "2 SUPPLY C
c N2 SWPLY &
VENT
Caution
CAUTION: In modes 1,2,
MONITQR THE PRESSCTRE DECREJ
TASK COMPLETE
I
I
STANDARD
m
Places 1511-297 in
OPEN
Verifies 1%-294
open by red light ON
and green light OFF
Reviews caution arid
determines not
spplicable due to not
being in Modes 1-3
Rotates HC-936
ccw direction
Observes valve
demand increases by
meter indication
Monitors Accumulator 6
pressure and determines
NOTES
CRITICAL TO
ALfGN
'C' TO VENT
CRITICAL TO
ALIGN
TO VENT
it is decreasing
4 TOR TANK 6 HIGH&
HAT AXOTHER OPERA TOR WZLL
w PRESS" IS
SAT 1
UNSAT
S'IOP TIME:
Page 7 of 8
JPM GOM-SIM(c)
HARRIS
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL, CONDITIONS:
h sinali break LOCA has occurred. Actions have been taken in accordance with
PATII- 1, and a transition to EPP-009 has been made.
INITIATING CUE@):
The SI Accuniulator isolation valve breakers have been closed. Isolate the SI
Accumulators in accordance with Step 28 of EOP-EPP-009 POST LOCA
COOLDOWPd AND DEPRESS1 JRIZATION
Page 8 of 8
.JPM RO-SIM(d)
HARRIS
GION I1
INITIAL LICENSE EXAMINATION
JOB PEWFORMANCE MEASURE
Start the Turbine Driven Auxiliary Fee
Bump
APPLICANT:
EXAMNEW:
JPM RO-SIM(d)
HARRIS
E G I Q N 11
INITTAL LICENSE EXAMINATION
JOB PERFQ
ANCE 1C.TEASUM
TASK:
ALTERNATE PATH:
None
Start the 'Turbine Driven Auxiliary Feedwater Pimp
FACILITY JPM NBJMRER:
CR-028 (M)
KA:
061A3.01
IMPORTANCE:
NA
4.2
KA STATEMEEdT:
TASK STANDARD:
Ability to monitor automatic operation of the AFW,
including: AFW startup and flows
The TDAFW Pump is supplying the SGs at a flow rate of
between 50 and 100 KPPH each.
-
SHMUIATOR J
IN PLANT
PERFORM
J
SIMULATE
-
PREFERRED EVALIJATION I,OCATIOh-:
PREFERRED EVAJ.UATION METHOD:
REFERENCES:
VALIDATION TIME:
_.
-
OP-139, Auxiliary Feedwater System, Rev 22
15
MINU'TES
TIME CRITICAL:
No
P
APPLICANT:
STARI' TIME:
FINISH TIME:
PERFORMANCE TIME:
M I w m S
PERFORl4.4NCE RATING:
UNSAT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of9
JPM RO-SIM(d)
HARRIS
TOOI,S i' EQUIPMENT / PROCEDURES NEEDED:
0
0
0
0
0
0
0
0
0
0
0
Initialize to saved IC-164
THE FOLLOWING STEPS DESCRIBE THE STEPS NEEDED TO ESTABLISH
Reset to IC'-8 (#%power).
Insert AdALFL5VCTIO,4E lo ccause the hfDAFW Pttnps to nip KCFWO~A
and
C'FWO IB>.
LWanually trip the reactor.
Secure [he running ;Mrrin Feedwater Pzmnip.
Allow SG lrwls to stetrm to approximately 45% level.
L4ttempt to start hoih MDAFW Pumps to obtain trip alurms.
FREEZE the sinmfator
CONDITIONS IN IC-1 64
When Applicant is ready, place simulator in RtJN.
OP-137, Auxiliary Fecdwater System
INSTRLJCTIONS TO APPLICANI:
If simulated, no actual plant controls or equipment are to be operated during the
performance of this JPM. If performed on the simulator. then take all actions as you
normally would in the Control Room. You should silence all annunciators and
determine if they are associated with the task you are performing. No furlher action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including. but not limited to, proper
communication, place-keeping, tZLARA and use of personal protective equipment. All
actions tcikcn by you should be clearly demonstrmed and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
You mdy use any normally available reference materials; however, itnmediate wtiot~.~,
ifanstp are to be performed front memory Describe ahe actions you are taking and the
indications you are looking at during the performance of the JPM; the evaluator will
then provide you cues describing thc condition ofthe indication if not otherwise
available. Report completion ofthe task as ~ Q U
wosrld in the plant.
During the course of the walk-through examination, there may be some tasks you will
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on procedural guidance and the indications availabfe.
Page 3 of 9
JPM R(S-SlM(d)
HARRIS
IKITIAI. CONDITIONS:
A manual plant trip has been initiated due to a loss ofhlain Feedwater. Following the
trip, both Motor Driven Auxiliary Feedwater Pumps tripped. EBP-EPP-004, Reactor
Trip Response, is being performed.
INITIATING CIJE(S):
Manually start the Turbine Driven Auxiliary Feedwater Pump and feed all three SGs
at a rate between 25 and 50 KPPB each per OP-134, Auxiliary Feedwater System.
Section 5.5. Maintain SG levels between 52% and 62%.
tzll Initial Conditions for starting the pump have been completed.
You have been assigned to perform this task as an extra operator. AH other plant
responses will be addressed by other operators.
JPM RO-SIM(d)
HARRIS
sTmr TIME:
- DENOTES CRITICAL STEP
Section 5.5
Initial Conditions
1. Attachment I
completed.
2. Attaclrnient 2
completed.
3. The spool pieces
connecting AEW to the
SG Wet tihyup System
are removed with blank
flanges installed.
4. Attachment 5 has been
completed for the
TDAFW pump.
5 . The Pump has been
vented per Section 8.6
System Venting if
Initial conditions
completed per initiating
cue
I
EXTRA OPERA TOR WILL LOG NECESSAB Y 4
procedure after
demonstration of
adiiity fo obtah
in the Operations Curve
Page 5 of 9
JPM RO-SIM(d)
HARMS
PROC
STEP
5.5.2.3 -
IF full flow to the Steam
Generators is not
immediately desired, then
perform the following:
1. Declare the Turbine-
Driven AFW Pump
2. Shut the following
W l V W
TURB AUX FW A
ISOLATION
TUHB AUX PW B
ISOLATION
TU-
AUX FW C
ISOLATiON
- P
a. Declares the
TDAFW Pump
b. Placesthe
following valves in
SHUT
c. Verifies the valves
shut by GREEN
Iight LIT and WED
Light OFF
AFW Pump by placing
either of the steam
admission c~ntrol switches
to the open position.
e
IMS-70 SA, MAIN
STEAM B TO AUX
FW TURBINE
STEAM e TO AUX
8
IMS-72 SB, .MAIM
CUE: OPERA TOR REPORTS TDi
e
Places 1MS-70A
and/or IMS-7OB in
OPEN positiom
e
Verifies valve(s)
open by observing
GREEN light OFF
and RED light LIT
Dispatches an operator
to perform checks
TW PUMP IS OPERA
FEEDMG SGs AT
MAXMUM
FLOW RATE
WHEK PUMP IS
STARTED.
NOTE: Declarutivn
of iiroperabilify atld
veriJcution is NOT
critical.
I
START PUMP TO
PROVIDE
SOURCE OF
WATER TO SGs.
NOTE: Verification
i s ?\\KIT critk-ul.
Page 6 of 9
JPM RO-SIM{d)
HARRIS
STEP
8 -
9
PKOC
STEP
5.5.2.6.a
P
5.5.2.6.
b
-
If AFW Isolation valves
were shut in Step 3,
then, to start fading the
perform the following:
a.
Shut Turbine Driven
AFW Pump Flow
Control valves:
AUX PW A
REGULATOR.
FK-2071B1 SB
AUX FW B
REGULATOR,
AtJX PW C
REGULATOR,
- FK-2071A1 SB
FK-2071C1 SB
h. Open Turbine Driven
AFW Pump Isolation
valves:
TURB AUX FW A
ISOLATION
TURIP AUX FW B
ISOLATION
TURB AUX FW C
ISOLATION
lAF-149,STM
SIANDARD
- -
a. Shuts the following
valvm by placing
controller in B M T
and lowering
output Q 0%:
- FK-2071Al SB
AUX FW A
REGULATOR,
- FK-2071B1 SB
AUX F W B
REGULATOR,
- FK-2071Cl SB
AUX FW C
REGULATOR,
b. Verifies valves shut
by observing
controller output at
0% and GREEN
lights ON fir vaive
position indication
$laces the following
valves in OPEN
1
1
Verifier the valves open
by GREEN light OFF
mind RED light LIT
IAF-149
-
CRITICAL TO
PREVENT
FEEDING SGs AT
MAXIMUM
FLOW RATE.
NOTE: Ver@cation
is NOT critical.
CRITICAL TO
ESTABLISH
FLOW PATH.
SAT i
IJNSAT
Page 4 of 9
JPM RO-SIM(d)
HARRIS
I
ELEMENT
Control AFW flow to the
throttling the follo~ing
valves by operation of the
respective MCB flow
controller:
0
1AF-129 (FK-2071A1
SB)
sw
IAF-130 (FK-2071Bl
1AF-131 (FK-2071Cl
SB)
Verifv flow to the Steam
Generators on the following
indicators:
(FI-205081 SA)
(FI-2050BI SB)
(FI-2050C1 SA)
If necessary, then adjust
turbine AP
I'UK-2 180.1 SB to vw
STANDARD
Adjusts controllers for
vaives to provide mow
at rate between 25 and
50 KBPH
SGA 1AF-129
each O f the f4dlQWhg
(FK-2071A1 SB)
SGBIAF-I30
(F'K-2071Bl SB)
SGC 1AF-131
(FK-2071CI s q
Verifies flow to each SG
between 25 and 50
KPPH by observing
fo'o31owiy indications:
SGAAUXFW
SA)
FLOW (FI-2050B 1
SB)
FLOW (FI-2050Cl
SA)
FLOW (FI-2050A1
SGBAUXFW
o SGCAUXFW
Adjusts PDK-2180.1 SB
as needed
5 MONITOR se LEV1
PROPER PLOW
RATE.
[OTHER OPERA TOR WI1
1
I
1
STOP TIME:
Page 8 of 9
JPM RO-SIM(d)
HARRIS
APPLICANT CUE SHEET
(TO BE R E T U W B TO EXAMINER WON COMPLETION OF TASK)
NNITIAL CONDI'IIONS:
A manual plant trip kas been initiated due to a IOSS of Main Feedwater. Following the
trip. both Motor Driven AuxiEiarp Feedwater Pumps tripped. EOP-EPP-004, "Reactor
Trip Response," is being performed.
INITIA1'IKG CUE(S):
h.lanually start the Turhine Driven Auxiliary Feedwater Pump and feed all three SCs
at a rate between 25 and 50 KPPH each per OP-137, "Auxiliary Feedwater System,"
Section 5.5. Maintain SG levels between 52% and 62%.
All Initial Conditions for starting the pump have been completed.
You have been assigned to perform this task as an extra opcrrator. AI1 other plant
responses will be addressed by other operators.
Page 9 of 9
SION 11
INITIAL LICENSE EXAMINATION
JOB PERFOMANCE MEASURE
JPM RO-SIM(e)
Transfer to Cold Leg Recirculation
APPLICANT:
EXAMINER:
Page 1 of 1 I
JPM RO-SIM(e)
HARRIS
REGION I1
INITIAL LICENSE EXAMINATION
JOB PEWOMANCE MEASURE
TASK:
ALTERNATE PATI I:
?ransfer to Cold r,eg Recirculation
1 CS-752 md 1 SI-330 fail to operatete,
requiring operation of
alternate valves
FACILITY JPM NIJMBER:
CR-031(M)
KA: 006A4.05
IMPORTAKCE:
NA
3.9
KA STATEMENT:
Ability to manually operate and/or monitor in the control
room: Transfer of ECCS flowpaths prior to recirculation
TA4SK STANDARD:
High head SI flow is establishcd and verified on both trains
PREFERRED EVALUATION 1,OCATION:
PREFERRED EVALIJATION METHOD:
REFERENCES:
VALIDATION TIME:
-
SIhRJLATOR
@
IN PLANT
PERFORM
@
SIMULATE
-
-
-
EOP-EPP-010, Transfer to Cold Leg Recirculation. Rev 15
15
MINUTES
TIME CRITICAL:
No
P
APPLICANT:
START TIME:
FINISH TIME:
PERFORMANCE TIME:
MINtJTES
PEKFOKMANCE EPATLVG:
SA?
INNSAT
COMMENTS:
EXAMINER:
Signature
Date
JFM RO-SIM(e)
HARRIS
TOOIS / EQUIPMW"' / PROCEDURES NEEDED:
Initialize to saved IC-165
THE FO1,LOWING STEPS DESCRIBE THE STEPS NEEDED TO ESTABLISH
Initialize to a Mode 3 post-LOCA condition.
All equipment is operafiug us required und K WST level is appmoxiinately 22percent.
SIshould be Yesel and C'C' Wshoukd be uiigried to rhe RHR heat rwhnger-s.
insert muvunctions to prevelmt 1 CS-?52, C'SIP B Alternate Miniflow Isolutior2, < OFR
ZKPK7IlB Fail Energized:, <OVR ICY-752 (>PEN> and ISI-340, Low Head SI
nain A io ~ o l d L e g
valve, porn closiizg <OVU ISI-350 OPEW.
FREEZE the sinaulator.
CONDITIONS IN IC-165
When Applicant is ready, placc simulator in RUN.
EOP-EPP-OI 0, Transfer to Cold Leg Recirculation
WAD TO OPERATOR
INSTRUCTIONS TQ hPP1,ICANT:
If simulated, no actual plant controls 'or equipment are to be operated during the
performance oftlais JPM. If performed on the simulator, then take all actions as you
normally would in the Control Room. You should silence all annunciators and
determine if they are associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, inctuding, but not limited to, proper
communication, place-kecping, A L A M and use of personal protective equipment. All
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
YOU may use any nomially available reference materials: how eve^, immediate actions,
ifany, are 80 Beperformedfrom memory. Describe the actions you are taking and the
indications you are looking at during the performance ofthe JPM: the evaluator will
then provide you cues describing the condition of the indication if not otherwise
a\\ailahle. Rep~rd compbtioun of the fask QS you w d d in thepkenl.
During the course ofthe walk-through examination, there may be some tasks you will
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 11
JPM RO-SIM(e)
HARRIS
INITIAL CONDITIONS:
A reactor trip and safety injection have occurred due to a LOCA. SI has been reset
and CCW has been aligned to the RIlR HXs. Ail equipment is operating as required
and RWST level is approximately 23Y0.
INITIATING CUE(S):
Transfer to cold leg recirculation per EQP-EPP-010, Transfer to Cold Leg
Rccirculation.
Page 4 of 11
JPM RO-SIM(e)
HARRIS
STAKT TIME:
- DENOTES CRITICAL STEP
PROG
STEP
TT===-=
Zaution
before
Step 1
Note
before
Step 1
ELEMENT
3btain copy of EOP-EPP-
110
Do Steps 1 through 8
without delay. Do NOT
implement Function
Restoration Procedures
prior to completion of
these steps.
SI recirculation flow to
RCS must be maintained
at all times.
Switchover to
recirculation may cause
high radiation levels in
the reactor auxiliary
building. Radiation
levels must be assessed
prior to performance of
local actions in the
affected area.
D
Foldout applies.
D
level of greater than
139.5 lNCHES should
ensure a long term
recirculation suction
source.
The following sequence
of steps to transfer to
coid leg recirculation
assumes operability of at
least one train of
safeguards equipment. -
STANDARD -
3btains copy of EOP-
EPP-0 IO
Reviews cautions
Reviews notes
NOTES
g___
Provide applicant
with copy of
procedure after
demonsfratiori of
abiiig to obtain
SAT i
UNSAT
Pace 5 of B 1
JPM RO-SIM(ef
HARRIS
PROC
STEP
1 .a
L .b
1.c
~
ELEMENT
__g
Check both RE-IR pumps -
Running
Establish RHR Pump
Recirculation Alignment:
RFIR pump suction
valves CXEN:
Train A RIIR pump:
[SI-300 AND ISI-
310
$SI-301 AND ISI-
311
Train B m1R pump:
c. Shot RWST to WHR
pomp suction valvcs:
HI-322 (Train A}
1SI-323 (Train R)
STANDAKD -
Verifies both MIR
pumps nitaning by
observing WED light
ON, flow and / or
current indicated
Verifies Train A
sump valves open by
lights ON, green
lights OFF on 1 SI-
300 and 1SI-310
Verifies Train B
sump valves open by
observing RED
lights ON, green
lights OFF on 1 SI-
301 and 1SI-311
Places ISI-322 and
handswitches to
CLOSE
Verify valves
closed by observing
RED lights ON,
green lights OFF
on 1st-322 and
observing FED
NOTES
P
CRITICAL TO
[SOLATE RHR
PUMPS FROM
SUCTION
SOURCE.
SAT i
UNSAT
Page 6 of 1 I
JPM RO-SIMle)
HARRIS
ELEME.NT
-
-
d. Shut low head SI Train
A to cold leg valve:
e. Shut IOW head SI
Train B to cold leg
valve:
ISI-341
Establish CSIP
Recirculation
ABignment:
a. Shut CSIP alternate
miniflow isolation
valves:
1CS-746 ('Train A
CSIP)
ICS-752 (Train B CSIP)
STANDARD
Places 1SI-340
Control Power ON
Verifies ORANGE
Control Power Light
ON
handswitch to
CLOSE
Determines that 1 SI-
340 does NOT close
by observing RED
light ON> green light
OFF
RNO
Places ESI-340
Goes to Step 1.c
Places 1SI-341
Verifies ORANGE
cOIItl"Ol BQWW ON
Control Power Light
ON
handswitch to
CLOSE
Verifies that 1 SB-
340 closes by
observing RED light
Places 1SI-341
OFF. green light OK
Verifies 1CS-746
cIosed by observing
RED light OFF.
GREEN light ON
Places ICs-752
handswitch in
CI.ClSE
Determines ICs-752
did NOT close by
observing KED light
ClN, GWEN light
OFF
Goesto Step
2.a.R"
-
NOTES
CRITICAL TO
VALVE WILL NOT
OPERATE.
CL(%S'E !SI-340
CRITICAL TO
CLOSEVALVE
SINCE TRAIN A
VALVE FAILED
TO CLOSE AS
REQUIRED.
Page 7 of 11
JPM WO-SIM(e)
HARRlS
PRO&'
STEP
2.a.RNO
P
2.b
2.c
2.d
2.e
2.f
c
-
a. Shut the associated
block valve:
ICs-753 (Train 3
CSIP)
b. Verify normal miniflow
isolation valves - SHUT
14:s- 182
14:s- 196
ICs-21 0
to CSIP suction
valves:
lRH-25
E. Open RHR discharge
d. Resets1
e. Manually realign
r,
safeguards equipment
following a loss of
offsite power
Shut KWST to CSlP
suction valves AND
place in poll-to-lack
position:
LCV-115B
LCV-1 PSI%
STANDARD
Places ICs-753
handswiteh in
CLOSE
Verifies 1CS-753
closed by observing
RED light OFF,
GREEN light ON
Verifies both valves
closed by observing
RED lights OFF,
GREEN Lights ON
Places
handswitches for
both 1RM-25 and
1RH-63 in OPEN
Verifies IRA-25 and
1RW-63 open by
observing RED
lights OK, GREEN
lights OFF
"
Resets SI signal
Notes step. but takes NO
action due to tii) loss of
offsite power
Places LCV-1133
and LCV-11JD in
CLOSE and then
in PULL-TO-
LOCK
e
Verifies LCV- 1 15B
and LCV-lI5D
closed by observing
RED lights OFF,
GREEN lights ON
CLOSE VALVE
SINCE
MINIFLOW
VALVE FAILED
TO CLOSE AS
REQUIRED.
!P%)TE: !WLy aiso
c h e ICS- 74-7 as
SUCTION
FLOWPATH
FROM SUMP TO
GSIP.
ALIGNED FQR
RECIRC.
Page 8 of 11
JPM RO-SIM(e)
HARRIS
PROC
STEP
3 .a
3 .b
4.a
4.h
4.C
ELEMENT
- heck Charging Systeni
status:
1. Check charging line -
isolated
x Verify Both Charging
Pumps: - running
Establish Recirculation
[njection Ftowpath:
a.
Open alternate high
head SI to cold Feg
valve
ISI-52
D.
Check any BIT outlet
valve - open
ISI-3
lSI-4
c.
Shut CSIP discharge
cross connect valves
based on Table:
Discharge Cross
Connect Valves To Be
Shu%
Any 2: ICS-217, ICS-
218, ICS-219,~CS-220
STANDARD
e
Checks Charging
Line Isolation
Valves ICs-235 and
ICs-238 CLOSED
by observing RED
lights OFF, GREEN
lights ON
May also check
FCV- 122.1
CLOSED by
observing Row
indication of ZERO
Verifies CSIPs 1 A-SA
and IB-SB both running
by observing E D lights
ON. GREEN liglits OFF
e
Places 1SI-52
Control Power ON
Verifies ORANGE
Cantmi Power Light
ON
Places 1SI-52
bandswitch to
BPEK
e
Verifies 1SI-52 open
by observing RED
light ON, green light
OFF
Verifies both 1 SI-3 and
13-4 open by observing
REED lights ON, GREEN
lights OFF
Places any 2 of 4
handswitches to
CLOSE position
for valves 1CS-217,
and 1 OF 1 CS-220
Verifies valves
operated closed by
observing RED
lights OFF. GREEN
lights OFF
1CS-218, f CS-219,
-
-
NOTES
CRITICAL TO
ESTABLISH
INJECTION
FLOWPATW.
CRITICAL TO
SEPARATE SI
TRAINS DURING
RECIRCULATIQ
N PHASE.
Page 9 of 11
JPM RQ-SIM(e)
HAMIS
q_
STIP
21
P
$ROC
STEP
5
CUE: A.
ELEMENT
Verify %figla Head SI Flow:
a
Alternate header flow
(Train A):
FI-940
Normal header flow
(Train B): 11-943
OTHER OPERATOR Wh
I I
TASK COMPLETE
FI-940
flow indication on
e
Verifies Train B
FI-94 1
SAT I
UNSAT
STOP ME:
Page 10 of 11
JPM WO-SIM(e)
HARRIS
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TL4SK)
INI?'IAL CONDITIONS:
A reactor trip and safety injection have occurred due to a LOCA. SI has been reset
and CCW has been aligned to the RMR HXs. All equipment is operating as required
and RWST level is approximately 23%.
INII'IATING CUE@):
Transfer to cold leg recirculation per EOP-EPP-010, "Transfer to Cold Leg
Recirculation."
Page I 1 of 1 1
JPM RO-SIM(f)
HARRIS
REGION I1
INITIAL LICENSE XAMINATION
JOB BEWORMANCE MEASUW
JPM RO-SIM(f)
APPLICANT:
EXAMINER:
P a p 1 of9
REGION II
INITIAL LICENSE EXAMINATION
TASK:
ALTERNA4TE PATH:
Perfom Control Rod and Rod Position Indicator Exercise
I'WO
shutdown hank rods drop while withdrawing to full
withdrawn position.
FACILITY JPM NUMBER:
NRC00-1 .R
KA:
001A2.11
IMPORTANCE:
NA
4.4
Ability to (a) predict the impacts of the following
malfhction or operations on the CRDS- and (b) based on
those predictions, use procedures to correct. control, or
mitigate the consequences of those malfblnctions or
operations: Situations requiring il reactor trip
The reactor has been manually tripped in response to two
dropped rods
TASK STANDARD:
7
SIhWLATOIP J
IN PLANT
PERFOKM
SIMULATE
-
PREFERREIS EVALUATION LOCATlON:
-
-
PREFERRED EVALUATION wmmri:
REFERENCES: OST-1005, Control Rod and Rod Position Indicator Exercise
Quarterly Interval Modes 1 - 3, Rev 1 1
i\\OP-OO 1, Malfunction of Rod Control and Indication System, Rev 22
VALIDATION TIME:
APPLICANT:
20
MINUTES
P
TIME CRITICAL:
N O
START TIME:
FINISH TIME:
PERFOMAKCE TIME:
MINUTES
PERFORMANCE RATING:
INSAT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of 9
JPM RO-SIM(f)
HARRIS
TOOIS / EQUIPMENT' i PROCEDURES NEEDED:
Initialize to saved IC-1 66
THE FOE1,OWING STEPS DESCRIBE THE STEPS NEEDED TO ESTABLISH
Initialize to IC '-19 (100% power).
Enter mdfinctiop? to prevent nuto openi??g of Reactor Tr$ Breakers CIMF RPSOIR 3
I>.
SEE IiVS7'R LTCTIONS AT STEP 7 TCP EhTER ADDITIONAL MALFUNCTIONS. <.Or
Control Bunk A Rod7 F2 aiid B O
FREEZE the sirnulutor.
CONDITIONS IN IC-164
When Applicant is ready, place simulator in RUN.
OST-1005, Control Rod and Rod Position Indicator Exercise Quarterly Interval
Modes 1 - 3
AOP-001. Malfunction of Rod Control and Indication System
READ TO OPERATOR
INSTRUCTIONS TO APPLICANT:
If simulated, 110 actual plant controls or equipment are to be operated during the
performance ofthis JPM. Ifperformed on the simulator, then take all actions as you
nornially would in the Control Room. You should silence all annunciators and
determine if they are associated with the task you are performing. No fiirther action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant stmdrtrds, including, but not limited to, proper
communication. place-keeping, ALAE4 and use of personal protective equipment. ,411
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
YOU may use any nornially available reference materials: however, immediate netiorts,
i f e r ~ j 9 ~
are to be performed from rzaemory. Describe the actions you are taking and the
indications you are looking at during the performance ofthe JPM; the evaluator will
then provide you cues describing the condition of the indication if not stherwise
available. Report compldion offhe fmk m yorr would in thegiatmt.
During the course of the walk-through examination, there may be some tasks you will
be asked to perforni that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and takc actions based on procedural guidance and the indications available.
Page 3 of9
JPM RQ-SIM(f)
HARRIS
I N I n u CONDITIONS:
Thc plant is operating at 100% power.
OS?-1 005, Control Rod and Rod Position Indicator Exercise Quarterly Interval
Modes 1 - 3, is being performed. All prerequisites to perform the test have been met.
A briefing has been conducted for the performance of Section 7. I. The
Superintendent-Shift Operations has gis7en permission tQ perform this OST.
INITIATING CUEQS):
Testing has been completed for the Shutdown Bank rods. YOU are to resume OST-
1005, Section 7.1, commencing with Control Bank A.
Page 4 of9
SPM RO-SIM(Q
HARRIS
START IBME:
- DENOTES CRITICAL STEP
-
STEP
1 -
__
2
I
Note
before
1 m:
Substeps 1.a through
1 .g are to be signed off when
I
NOTE: APPLICANT MA Y REQUEST
STANDARD
Obtains COPY of OST-
1005 and refers to
Section 7.1
Reviews note
[NADDITIONAL OPER
NOTES
-
Provide applicant
procedure afier
denmistration of
ability io obtain
copy.
W 2 h Copy Qf
TOR TO MONITOR
AND RECORD DRPI DUE TO THE L QCA TION OF LWICA TION. IF
REQUESTED, PROVIDE THE REQUIRED I.VFUR&U TIQNAS DRPI INDICATING
7. L.1.a
7.1.P.b
Note
before
7.1.1.c
7.1.l.c
For the rod hank being
tested, record on Attachment
1 the rod heights as indicated
by Group Step Counters and
DRPI.
Rotate the Rod Bank
Selector to the bank being
tested.
m:
When inserting rods,
the Bank Low Insertion and
Bank Low-Low Insertion
Limit Alarm may be
actuated.
With the Rod Motion
lever, drive the rod bank
being tested IN 1Q steps as
indicated by Group Step
Counters.
For Control Bank A,
records both Group
Position indications as
225 and records all
DRPI position
indications as 228
Rotates the NOD
BANK SELECTOR
switch to the CB A
position
Reviews note
Places the ROD
MOTION lever in the
61
position and
inserts Control Bank
A rods 10 steps by
observing Group
Position indication
-
E
CRITICAL TO
ALLOW
MOVEMENT OF
CONrnOL BANK
A.
CRITICAL TO
CAUSE
CONTROL BANK
A RODS TO
MOVE INWARD.
SAT I
IJNSAT
Page 5 of 9
3PM RQ-SIM(f)
HARRIS
..I
._ ....... L
........
OPERATOR INS'f
INSERT MALPWCTIO
INTO COKE AFTER
TEME DELAY>.
OF THE FOI,I,OWING srF
...... -
...... __. ..
REQUIRED TO WITHDRA WRODS, DIRECTAPPLICANT TO RESTORE RODS TO
ORIGINAL POSITION.
lever, pull the rod bank
1 MOTION lever in the
Bank 'A' rods 10 steps
CONTROL BANK
'A' RODS TO
MOVE
QCTWARD.
Page 6 of 9
-
STEP
10 -
__n
PROC
STEP
P
ELEMENT
-
Determine 2 Control Bank
'4' rods have dropped into
the core
STANDARD
Determines 2 rods have
dropped into the core by
observing:
Rod Boaom Lights
Decreasing power
Decreasing Tavg
ALB-13-7-4, ONE
ROD AT BOTTOM
OR MORE RODS
AT BOTTOM
CONTROL
URGENT ALARM
FQWER RANGE
HIGH NEUTRON
FLUX RATE
ALERT
POWER RANGE
UPPER DETECTOR
HIGH FETJX DEN
OR AUTO DEFEAT
POWER RANGE
LOWER
DETECTOR I-IIGH
FLUX DEV OR
AUTO DEFEAT
POWER RANGE
CHANNEL
DEVIATION
COMPUTER
ALARM ROD
DEV/SEQ NIS PWR
ALB-13-7-3, TWO
ALES-13-7-1, ROD
A4LB- 13-4-2,
ALR-13-5-3,
ALB-13-5-4,
ALB-13-44,
ALES-13-8-5,
,
RANGETILTS
Page 7 of 9
JI'M RO-SLM(9
HARRIS
NOTES
- -
CRITICAL TO
MAWALLTI
TRIP THE
REACTOR.
NOTE:
IMMEDIATE
OPERA TOR
ACTIOX FOR AOP-
001.
NOT tYi'UTICAE TO
INFORM ~JWIT
SC'O PRIOR TO
1
STOP TIME:
Page 8 0f9
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER WON COMPLETION OF TASK)
INITIAL CONDITIONS:
The plant is operating at 100% power.
0S.B-I 005, Control Rod and Rod Position Indicator Exercise Quarterly Interval
Modes 1 - 3, is being performed. All prerequisites to perform the test have been met.
A briefing has been conducted for the performance of Section 7.1. Phe
Superintendent-Shift Operations has given permission to perform this OST.
INITIATING CUE(S):
Testing has been completed for the Shutdown Bank rods. You are to resume OST-
1005, Section 7.1, commencing with Control Bank A.
Page 9 of 9
REGION 11
INITIAL LICENSE EXAMINATION
JOB PEWOMANCE M E A S W
JPM RO-SIM(g>
Place Audio Count Rate Drawer in Service
APPLICANT:
EXAMINER:
Page I of8
JPM RO-SIM(g)
HARRIS
REGION I1
INITIAL LICENSE EXAMINATIQN
TASK:
ALTERNATE PATH:
None
Place A4udio Count Rate Drawer in Service
FtZCI1,ITY JPM NUMBER:
New
K.4:
015A4.02
IMPORTANCE:
NA
KO
3.9
I(A STATEMEN?':
Ability to manually operate andor monitor in the control
room: NIS indicators
TASK STANDAFUI:
Audio Count Rate Drawer and Scaler Timer are capabk of
providing counts in 30 seconds intervals.
PWFERIPED EVALUATION LOCATIOY:
PREFERRED EVALUATION IbfETIIOD:
PERFORM
REFERENCES:
VALIDATION TIME:
-
SIMULATOR
9
CR
-
_I
9
SIMULATE
7
CPP-105. Excore Nuclear Instrumentation, Rev 21
10
MINIJTES
TIME CRITICAL:
No
P
APPLIC.ANT:
STAR'?' TIME:
FINISH TIME:
PERIFORMANCE TIME:
MINUTES
PEKFOKh4AhTCB;: RATING:
UNSAT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of 8
'I'OOLS / EQIJHPMEN?' / PROCEDURES NEEDED:
Initialize to IC-163
Rotate VOLUME to MIN
Place CIIAIWEL SELECTOR in N31
Place AIJDIO MIJLTIPLlER in 10K
Rotate TIIUMBWHEELS TO 0000.0
Place DISPLAY PRESET to MIN / COUNT
Depress STOP
Depress RESET
FREEZE the simulator.
When Applicant is ready, place simulator in RUN.
OP-105, Excore Nuclear Instrumentation
READ TO OPERATOR
I N s m u c m m s TO APPLICANT:
If simulated, no actual plant controls or equipment are to be operated during the
pcrformance of this JPM. If performed on the simulator, then take all actions as you
normally would in the Control Room. You should siience all annunciators and
determinc if they are associated with the task you are performing. No fkrther action is
required for annunciators unrelated to your task.
You are expected to adhcre to all plant standards, including, but not limited to. proper
communication. place-keeping, ALAWA and use of personal protective equipment. All
actions taken by you should be clearly demonstrated and verbaliwd to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
You may use any normally available reference materials: however, irninediatp mfiuns,
ifuny, are to Qeperfortnedfrom memory. Describe the actions you are taking and the
indications you are looking at during the performance of the JPM; the evaluator will
then provide you cucs describing the condition of the indication if not othemise
available. Report completion ofthe tusk as you would in the plant.
During the course of the walk-though examination, there may be some tasks you will
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 8
JPM RO-SIM(g)
HARRIS
INITIAL CONDITIONS:
The plant is in Mode 4.
No personncl are inside containment.
INITIATING CIJE(S):
Using OP-105, Excore Nuclear Instmmentation, Section 8.1.2.3, establish operation
of the Audio Count Rate and Scaler Timer in the PRESET TIME MODE, wing a
automatic sampling period of 30 seconds. Use SR Channel 3% as input.
Page 4 of 8
JPM RO-SIM(g)
HARRIS
STAR?' TIME:
- DENOTES CXITICAL STEP
PROC
STEP
__E
NIB
Note
before
8.1 2.3
Caution
before
8.1.2.3
8.1 2.3.a
8.1.2.3.h
Repeat
8.1.2.3.h
ELEMENT
-
Obtain copy of OF- 105
N m : The CHANNEL
SEI,ECTOR switch must be
pulled out to release the lock
before it can be turned.
CAIJTHON: When changing
the multiplier switch
Position, ensure personnel in
containment are notified that
a change in count level will
be heard.
For PRESET TIME mode,
perform the following.
a. Turn CHANNEL
SELECTOR switch to
the desired Source
Range channel
b. Turn the AIJDIO
MLJ1,'IWLIER switch to
position IO. If the
audible count rate is too
rapid. adjust the AUDIO
MLJLTIP1,IER switch
upscale as necessary
MULTIPLIER switch to
position 100. Ifthe
audible count rate is too
rapid. adjust the AUDIO
MULTIPLIER switch
upscale as necessary
b. Turn the AIXIIO
P
STANDARH) -
Obtains copy of OF-105,
Section 8.1.2.3
Reviews note
Reviews caution
0
Determines SR
Channel N32 is
desired channel
0
Pulls Channel
Selector switch
OUT and then
rotates to N32
position
Rotates Audio Multiplier
switch to Position 10
Listens for audible count
rate and determines
whether it is too rapid
Rotates Audio Multiplier
switch to Position 100
Listens for audible count
rate and determines
whether it is too rapid
- -
NOTES
Provkie applicant
procediire after
demonsttatbn of
ahilify to obtain
With CUpJ9 Of
COpJ,.
CRITICAL TO
SELECT
CHANNEL N32
FOR ACDIO
COUNT RATE.
VOTE: NO NOISE
WILL BE HEAIPD
UNTIL A PPLICAIVT
1)EPRESSES START
LATER IN JPM
WOTE: THIS STEP
M4 Y NOT EE
PERFORMED
UNTIL APPLICAAT
DEPRESSES START
__==
SAT!
UNSAT
_g___
Page 5 of 8
JPM RO-SIM(g)
HARRIS
P KOC
STEP
R.1.2.3.c -
R. 1.2.3.
d
Note
before
8.1.2.3.e
8.1.2.3.e
ELEMENT
c.
Set the DISPLAY
PRESET switch %O
PRESET TIME SEC
or PRESET TIME
MIN
d. Set the digital thumb
wheels to the desired
counting period. The
switches are read
directly in tenth
seconds or minutes.
m:
If the SAMPLING
MODE switch is in AUTO,
pushing the START push-
button will cause the unit to
xccumnlate counts foe the
preset time. display the total,
xutomatically reset, and start
am. In MANUAL, pushing
thc STAR?' push-button will
Lause the unit to go through
one accumulate, display, and
stop cycle. Pushing the
START push-button again in
MAYIJAL will repeat the
cycle with the previous
counts added tu the new
measurement.
2.
Position the SAMPLING
MODE switch to the
desired position, either
AUTO or MAN
-
-
TIME SEC position
PROPER TIME
NOTE: THUMB
WHEEL HAS
TENTHSPOSTION.
MODE switch in AUTO
SAT i
UNSAT
Page 6 of 8
JFM RO-SIM(')
H A W S
e
Verifies that counts
PP~I~ANTIMAYADJUSTAUDIO
COkWT R4T1
NOTES
-
s
CRITICAL TO
ALLOW SCALER
TIMER TO
BEGIN
OPERATING.
LE VEL A T THIS
SAT I
UWSAT
STOP TIME:
Page 7 of 8
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER WON COMPLETION OF TASK)
INITIAL CONDITIONS:
The plant is in Mode 4
No personnel are inside containment.
INITIATING C&TE(S):
iising OP-105, Excore Nuclear Instrumentation. Section 8.1 2 . 3 , establish operation
of the Audio Count Rate and Scaler Timer in the PRESET TIME MODE, using a
automatic sampling period O f 30 seconds. Use SR &mnel32 as input.
Page 8 of 8
JPM RO-SIM(h)
IIARlUS
REGION I1
INITIAL LICENSE EXAMINATION
JPM SIM-CR(h)
Align CCW to Support RWR System Operations
APPLICANT:
EXAMINER:
~
Page 1 of 11
JPM RO-SIM@)
KARRlS
REGION II
INITIAL LICENSE EXAMINATION
JOB PERFORMANCE MEASTJRE
TASK:
ALTERNATE PA?":
Nolle
FACILITY JPM M,'MBER:
CR-085
KA:
008A4.01
IMPORI'.4NCE:
NA
3.3
KA STATEMENT:
Ability to manually operate and/or monitor in the control
room: CCW indications and controls
TASK STANDARD:
CCW flow greater than or equal to 5000 gpm has been
established to each KHR heat exchanger.
Align CCW to Support RHK System Operations
d -
CR
SIMIJLATE
-
PKIJFERKED EVALUATION LOCATION:
SIMGLATOR
I'RE.FEIIS:D EVALUAI'ION METI IOD:
PERFORM
EFERE.KCE'S:
-
-
OP-145, Component Cooling Water, Rev 43
VAI.IDA?'ION TIME
20
MINUTES
-
TIME CRITICAL:
No
APPLICANI':
START TIMI;:
FINISII TIME:
PERFORMAhXE TIME:
MINI JTES
PERI:ORML4NCE RATING:
CJNSAT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of 11
JPM KO-SIM(h)
HARRIS
TOOLS / EQUIPAMENT ,' PRQCEDUWS NEEDED:
Initialize to IC-168
Place STAR plate on controls for SFP Cooling Pump 2&3A
TIE FOLLOWING s r m DESCRIBE 'THE STEPS NEEDED 'ro ESTABLISH
CONDITIONS IN IC-168
Reset to TC-I6 fiWode 4j
Both ESIV trains arc in service and both C'CWpunips arc running
Closed 1 CC-508
SturtedSFP Cooling Pump 2&3A
Smired SFP Cooling Pump I &4A
FREEZE the simulator.
When .4pplicant is ready, place simulator in RUN
OP-135, Component Cooling Water
READ TO OPERATOR
INSTKIJCTIOKS TO APPLICANT:
If simulated, no actual plant controls or equipment arc to be operated during the
performance of this JPM. If performed on the simulator, then take all actions as you
normally would in the Controi Room. You should silence all annunciators and
determine if they are associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You art: expected to adhere to all plant standards, including, but not limited to, proper
communication, place-keeping. ALARA and use of personal protective equipment. All
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting. initial conditions and initiating cues will be described and you ma)'
ask for clarification if needed.
You may use any normally available reference materials; however. immediate actions,
ifany, are to hepei$ormed from memory. Describe the actions you are taking and the
indications you are looking at during the performance ofthe JPM: the evaluator will
then provide you cues descrihing the condition of the indication il'not otherwise
available. Report completion of the task asport nwdd in theplatit.
During the conrse of the walk-through examination, there may be some tasks you will
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions hased on procedural guidance and the indications available.
Page 3 of 1 1
JPM RO-SIM(h)
HARRIS
INITIAI, CXNXTIOYS:
The plant is in Mode 4 preparing fbr RIiR start-up. Both ESW twins are in sen-ice
aid both CCU' pumps are running. SFP 2&3A is in service.
INITIATING ('LE@):
The SRO directs you to dign CCW to both KHR heat exchangers per OP-145,
"Component Cooling Water," Section 8.9. Place "A" Train CCW in service first.
Pzge 4 of 11
JPM RO-SIM(h)
HARRIS
START TIME:
- DENOTES CRITICAL STEP
PKOC
STEP -
Note
heforc
8.9.2.1
--
Note
before
8.9.2.1
I
-
Caution
before
8.9.2.1
-
ELEMENT
-
Obtain copy of OP-145
m:
The purpose of this
section is to ensure CCW
pump runout does not occur.
Maximum flow through one
C:CW pump is 12,650 gpm.
This section will ensure that
one CCW pump is not
supplying both essential
cooling loops and the non-
essential loop
simultaneously.
N m :
Normally it is
desirable to place both RHR
-
cooling trains in operation in
Mode 4. 'I'his will require
both CCW pumps to he in
operation and one train of
non-essential supply and
return valves to be shut.
C:AUTIOS: '1.0 prevent
pump runout when aligning
C;CW flow to the RIlR Hx,
verify flow! rate to the
non-essential header with
one pump running is less
than 8500 gpm, as indicated
on PI-652.1 (FI-653.1) prior
to opening 1CC-147 (ICC-
STANDARD
3btains copy of OP-145
md refers to Section 8.9.
Keviews note
Reviews note
Reviews caution
NOTES
- -
Provide applicant
with copy of
arocmiure ufter
$emosstrrrrlon of
ibility to obtain
copy.
Page 5 of 11
JFM RO-SIM(h)
HARRIS
_=
STEP
5
_E _==
8.9.2.i.a
L
~
Perform the following to
verify total CCW flow rate is
less than 8500 gpm:
a. If SFP 2&3A is in
service, then shut ICC-
CCW Outlet Isolation
Valve.
locnlly close ICC-508 I
8.9.2.1 .b
8.9.2.2-
Note
before
8.9.2.3
5.9.2.3
h. If SFP 2&3B is in
service, then shut ICC-
CC'W Outlet Isolation
Valve.
If both trains of RHK
cooling are to he placed in
service, start the second
C:CW pump per Section 5.2.
m:
If A (B) train RHR
cooling is placed in service
first, the A (F3) CCW pump
will only supply the A (B)
CCW pump will supply
the non-essential CCW
header and the H (A) C:Cwi
essential header.
Open 1CC-147 (lCC-167),
EXCHANGER A-SA
(n-m).
Marks step N!'A
Verifies both CCW
pumps running by
observing RED
breaker iudication
OS
May also check
flows on both loops
to verify pumps
running
Reviews note
Places 1CC-147 to
OPEN position
e Verifies valve open
by observing WD
light ON, GREEN
light OFF
-
CRITICAL TO
ALIGN CCW TO
KIIR H S A-SA.
Page 6 of1 1
JPM RO-SIM(h)
HARRIS
11 I-
8.9.2.4
i 3 - p -
before
1 8.9.2.5
I 3 I Caution-
"14
before
8.9.2.5
8.9.2.5
I '
CAIJTION: With one CCW
pump running and the
standby pump capable of an
automatic start, ensure a
minimum flowrate of 7850
gpm exists as indicated on
F1-652.1 (FI-653.1). If
both CCW pumps are
running OK the CCW trains
are separated, a minimum of
3850 gpm per pump is
required. This low-er
flowrate should only be
allowed for short durations
to accomplish pump
swapping or system
-_ realignment.
I
Verify KHR IIX .4 (B) out
j Verifies flow on FI-
flow is 5600 to 8150
NOTE: If B leak
FI-688A1 (FI-489Al).
surge tank level is less than
plate), make up water for the
supplied by dernin water.
Make up water for the '4
supplied by the Reactor
40% (below the divider
1
Makeup Water System.
CAIITION, Shutting both
ICC-99 and ICC-1 I3 will
result in the loss ofthe
Sonessential Header.
If both CCW punips are in
service, close lCC-99
(lCC-113), CCW HEAT
EXCIIASGER A(B) TO
NONESSENTIAL SUP.
I
Keviews caution
lieht ON
-
SAT i
UNSAT -
Page 4 of 11
SPM RO-SIM(h)
HARRIS
I
t
- .-_
17
' 8.9.2.4.a
(1)
__
' ( 2 ) L-
ELEMENI'
- ACTION:
Shntting hoth
ICC-128 and 1CC-127 will
.esolt in the loss ofthe
\\lonessential Header.
[f both CCW pumps arc in
iervice, close 1CC-I28
- 1CC-127), CCW
VONESSENTIAL
KETURN TO HEADER
4(B).
Verify the following:
I. If both CCW Pumps arc
in service, then perform
thc following:
( I ) Check CCW Pump
A-SA (B-SB) flcw
between 7850 and
8050 gpm on MCR
indicator F1-688A1
(FI-689.41).
(2i If necessary, then
adjust ICC-1-16
( I CC- 1 h6), KHR
HX A (B) Outlet
Throttle Valve, to
chtain desired flow.
light ON
Verifies flow on FI-
I
688AI between 7850
and 8050 gpm
i
Marks step N l h
I
-
SAT l
UNSAI -
Page 8 of 1 1
JPM RO-SIM(h)
IIAREUS
7
STEP
19 -
20
~
"21
is in service, then
perform the following:
(1) Check CCW Pnmp
A-SA (B-SB)
flow
between 10,000 and
12,500 Rpm on MCB
indic.ator FI-652.1
(PI-653.1)
( 2 ) If necessary, then
adJust the following
valves while
monitoring MCB
indicator FI-652. i
(FI-653.1) to obtain
the desired flow:
IfSFPHX
2&3A is in
service, adjust
and lock 1CC-
2&3A CCW
Outlet Isolation
Valve * If SFP
HX 2&3B is in
service., adjust
and lock 1CC-
521, SFPIIX
2&313 CCW
Outlet Isolation
STANIIAKII
-
Marks step N!A
8.9.2.8
Exchangers simultaneously
with only one CCW pump
8.9.2.8
-
running.
If both trains of RHR
cooling are to be placed in
service, open 1CC-167
(lCC-147), CCW FROM
KHR HEAT
EXCHANGER R-SB (A-
SA)
-
Places 1CC-167 to
OPEN position
a
Verifies valve open
by observing RED
light OS, GREEN
light OFF -
CRITICAL TO
ALIGN CCW TO
RUR HX H-SB.
Page 9 of 11
JPM RO-SIM(h)
HARRIS
STEf
22
_.
I
23
['ROC
STEP
8.9.2.9.a -
3.9.2.9.h
ELEMENI
-
-
Verify CCW Pnnip 3-SR
[A-SA) flow rate in the
required range, as follows:
a. Check CCW Pump R-SB
(A-SA) flow rate is
between 10,000 and
12,500 gpm on MCB
indicator FI-653.1 (FI-
b. If flow- rate is not
between 10,000 and
12,500 gpni, then adjust
the applicable valve.
If SFP I~IX 2&3A is
in service, adjust and
lock ICC-508, SFP
Outlet Isolation
Valve
in service, adjust and
lock ICC-521, SFP
Outlet Isolation
Valve
652.1)
Iix 2 8 ~ 3 ~
C.CW
COMPLETE
STANIIAKI?
-
-
Verifies flow indication
m FI-653.1 between
10.000 and 12,500 gpm
Marks step Y!A
NOTES
S'I'OP TIME:
Page IO of 11
JPM RO-SIM(h)
HARRIS
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER IJPON COMPLETION OF TASK)
INITI.4L CXNDITIONS:
The plant is in Mode 4 preparing for KHR start-up. Both ESW trains are in service
and both CCW pumps are running. SFP 2&3A is in service.
INITItYIIKG CUPXS):
?he SRO directs you to align CCW to both RIIR heat exchangers per OP-145.
(:omponrnt Cooling Uater, Section 8.9. Place A Train CCW in senrice first.
Page 1 I of 11
JPM COM-IP(i)
HARRIS
REGION 11
INITIAL LICENSE EXAMINATION
JPM COM-IP(i)
Local Makeup to the VCT Using the Emergency
Boration Valve
APPLICANT:
EXAMINER:
lagc 1 of 8
JPM COh.f-IP(i)
HARRIS
TA
REGION I1
INITIAL LICENSE EXAMINATION
Local Makeup to the VCT Using the Emergency Bor .I ti on . ..-ve
ALTE.RNATE PA?":
None
FACII,ITY JPM NUMBER:
IP-95
KA:
004A2.07
IMPOR'I'ANCL;):
3.4
3.4
KA STATEMENT:
Ability to (a) predict the impacts ofthe following
malfunctions or operations on the CVCS; and (b) based on
those predictions, use procedures to correct, control, or
mitigate the consequences of those malfunctions or
operations: Isolation of letdown / makeup
1CS-274 and ICs-278 have keen operated as directed with
the breaker for 1CS-278 verified c.losed.
TASK STANDARD:
INPLANT
J
SIMULATE *
-
-
PRTFEKKED EVALUATION LOCATION:
SIMLJI ATOR
PREFERRED E,VAI,I!AlION MF.TI IOD:
PE.RFORM
REFERENNCt;,S:
-
-
AOP-003, Malfunction of Reactor Makenp Control
10
MINUTES
TIME CRITICAL:
No
-
VALIDATION TIME:
START TIME:
FINISH TIME:
PERFORMANCE TIME:
MINI J'I'ES
PL:,WORh4ANCE K4TINO:
UNSAF
COMMENTS:
EXAMINER:
Signature
Datc
Page 2 of 8
JPM CO1\\?-IP(i)
HARRIS
1001,S / EQUIPMENT / PROCEDIIRES NEEDEI):
- Performed in plant
- AOP-003, Malfunction of Rerictor Makeup Control
READ TO OPERATOR
INSTRIJC1'IONS TO APP1,ICANT:
If simulated, no actual plant controls or equipment are to be operated during the
performance of this JPM. If performed on the simulator, then take all actions as you
nonnallp would in the Control Room. You should silence all annunciators and
determine ifthey are associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, but not limited to, proper
communication, place-keeping, AIARA and use of personal protective equipment. All
actions taken by you should he clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
You may use any nomially available reference materials: however, immediate actions,
ifuny, ure to heperfornied from memory. Describe the actions you are taking and the
indications you are looking at during the perfornimce ofthe JPM: the evaluator wil1
then provide you cues describing the condition of the indication if not otherwise
available. Report completion ofthe task asj~ou would in the plant.
Lluring the course of the walk-through examination. there may be some tasks you will
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You arc expected to m&e
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 8
JPM COM-IP(i)
HARRIS
INIIIAI, CONDITIONS:
The plant is operating at l o p ? power. The Reactor Makeup Control System is
inoperahle. FCV-I 13A and FCV-114A will not open. A Boric Acid Pump and a
RMIJW Pump are both running, but VCT level is slowly decreasing.
INITIAiTNG CUE(S):
The 1 Jnit-SCO has informed you that AOP-003, MaIfmction of Reactor Makeup
Control, Attachment 2, is being performed to establish manual makeup flow to the
VCT. The breaker for 1CS-278, Emergency Boric Acid Addition Valve, is opcn.
You arc to perform AOP-003, Malfunction of Reactor Makeup Control. Attachment
2, commencing with Step 20.
Page 4 of 8
JPM COM-IP(i)
IIARKlS
START TIME:
- DENOTES CRITICAL STEP
I
3
' 20.b
-
ILEMENI'
__E
Obtain c.opy of AOP-003,
Attachment 2
Direct an operator to perform
the following:
a. OBTAIN a radio and a
locked valve key
b. Establish
communication between
236' KAB Imergency
Boration Valve Gallery
and the Control Koom
FORM APPLICANT THA
Emergency Roratioii
Valve Ciallery and
establishes
Verify the following are
RI"I?;G
One Boric Acid Transfer
e
One Reactor Makeup
Pump
I
I
Verifies pumps running
based on initial
I
condition
Water Pump
Prior to continuing, check
I Ensures all applicable
I
Page 5 of 8
JPM COM-IP(i)
HARRIS
STEP
"8 -
I-
-_
10
-
-
As closely together as
possible, locally perform
lhe following:
a.
Throttle OPEN
Emergency Boric Acid
Addition, to obtain
-
gpm boric acid
flow rate (from step
17)
Contacts Control
Room and slowly
throttles open 1CS-278
until desired flow is
achieved
ter ICs -278 is simulated to be throttled open s @hi
v u that adequate boric acidflow has beem achieved
I
b. Throttle OPEN
Contacts Control
1CS-274, RMUW
Room and slowly
Manual Blend from
RMWST, to obtain 120 ; until desired flow is
gpm total makeup flow
achieved
rate.
throttles open 1CS-274
NOTES
CRITICAL TO
ESTABLISH
FLOW FOR
PROPER
BLENDED
OPERATION.
I Control Room
CRITICAL TO
ESTABLISH
REACTOR
MAKEUP
WATER FLOW
FOR PROPER
BLENDED
OPERATION.
b Control Room
expected rcsponw
to monitor these
Reactor power
Control rod motion
I
I
I
I
W E : Control Room will monitor parameters.
Page 6 of 8
JPM COM-IP(i)
HARRIS
STEP
- I1 -
~.
"12
~
- 13
a. Locally SIIUT and
STAXDAM)
Shuts and locks 1CS-
274 when Control
Room informs
applicant that proper
VCT level has been
reached
-_
I
CLJE: Control Room irtforms you that desired VCT level Ita!
NOTES -
CRITICAL TO
CLOSE VALVE
DILUTION OF
RCS.
To PREVENT
een reached.
(After lCS-2Y4 is simulated to be shut and1 ocked .b, ICs-274 has been shut and
locked.
25.b
I
-
CUE: I:
Emergency Boric Acid
Addition
e.
Verify breaker
iB35-SB-8C (for
CLOSED
esker IB35-SB-8C has bet
Shuts 1CS-278 when
CRITICAL TO
Control Room informs
CLOSE VALVE
applicant that proper
TO PREVENT
he*
IC-278 lsas been shut.
Cioses breaker
1B35-SR-8C (for
closed.
CRITICAL TO
CLOSE
BREAKER TO
ALLOW
REMOTE
OPERATION
FROM CONTROL
noo1w.
I
I
I
I
STOP TIME:
Page 7 of 8
JPM COM-IP(i)
IIARRIS
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONLIITIONS:
The plant is operating at 10096 power. The Reactor Makeup Control System is
inoperable. FCV-113A and FCV-114A will not open. A Boric Acid Pump and a
RMLW Pump are both running. but VCT level is slowly decreasing.
INITIAIING CtJE(S):
The I Jnit-SCO has informed you that AOP-003, Malhnction of Reactor Makeup
Control. Attachment 2, is being performed to establish manual makeup flow to the
VCT. The breaker for 1CS-278, Emergency Boric Acid Addition Valve, is open.
You are to perform AOP-003, Malfunction of Reactor Makeup Control, Attachment
2, commencing with Step 20.
JPM COM-IP(j)
HARRIS
REGION I1
INITIAL LlCENSE EXAMINATION
JPM COM-IP(j)
Ber-Eorrn Local Actions for Placing an OTAT
Channel in Test
RPPLIGANF:
EXAMINER:
Page 1 of9
JPM COM-Wj)
HARRIS
REGION I1
INITIAL LICENSE EXAMINATION
TASK:
ALTERNATE PAlH:
None
FACILITY JPM NUMBER:
New
KA:
012A3.04
IMPORTANCE:
3.3
3.3
KA STATEMENT:
Ability to manually operate and/or monitor in the control
room: Bistable, trips. reset and test switches
TASK STAKDARD:
Master Test switches and bistahle test witches for all Loop 1
iavg and OTAT trips and runbacks are in TESI position.
IKPLANT
I(
Perform Local Actions for Placing an OTAT Charnel in Test
-
-
PREFERRED EVALUATION LOCATION:
SIIVIULATOR
IRI;,FERRE:D EVALUATION METHC)IP:
PERFORM
REFERENCES:
C)WP-RP-Ol, Reactor Protection
VAIJDAIION TIME:
SIMULATE
-
-
15
MINUTES
TIME CRITICAL:
No
-
APPLICANT:
START TIME:
FINISH TIME:
PERFOIQR.IANCE TIME:
MINI JTES
PERFOIWIANCE KATIKG:
sAr
UNSA?
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of9
JPM COM-IP(i)
IIARRIS
TOOLS / EQUIPMENT / PROCEDIXES NEEDED:
JPM to be performed iu plant
OWP-W-01, Reactor Protection
READ TO OPERATOR
INSTRUCTIONS TO AIPLICANT:
If simulated, no actual plant controls or equipment are to be operated during the
performance of this JPM. If performed on the simulator, then take all actious as you
normally would in the Control Room. You should silence all annunc.iators md
determine if they are associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, but not limited to, proper
c.ommunication, place-keeping, ALARA and use of personal protective equipment. Ail
actions taken by you should be clearly demonstrate.d and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification ifneedcd.
You may use any normally available reference materials; however, immediate actions,
ifany, are to beperformedfrom m e m y . Describe the actions you are taking and the
indications you axe looking at during the performance ofthe JIM; the evaluator wiil
then provide you cue.§ describing the condition of the indication if not otherwise
available. Report completion ofthe task asjlou nwdd in the plant
During the course of the walk-through examination, there may be some tasks you uiil
be asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 9
JPhl COM-IP(j)
HARRIS
INIIIAL C0NI)IIIONS:
The plant was operating at 1 OOYn power when Loop 1 hot leg temperature input to
'Iavg aid OTAT failed low.
INITIAIING CUE@):
Perform the local actions per OWP-RP-01 for troubleshooting and tripping bistables
for Loop 1 Tavg and OTAT to meet Technical Specifications. Inform the Control
Room when all switches have been positioned to allow the Control Room to complete
the actions required in the Control Room.
The Unit-SCO informs you that all Master ?'e.st Switches are to placed in test for
troubleshooting. The Control Room has placed Rod Control in MANIJAL..
Page 4 of 9
JPM COM-IPQ)
HARRIS
START TIME:
- IIENOTES CRITICAL STEP
1
- ontrol
h a r d
m m
WANUr
Vote
xfore
PIC 1
,n Card 21-861
ELEMkNr -
Obtain copy of OWP-RP
-:
Toprevent
a Reactor Trip, prior to
removing a channel from
service, verify the
corresponding Trip Status
lights for the other channels
are de-energized.
On Main Control Board
Rod I3ank Selector to MAN
mTROL ROOM REPORT
r ,.
=E:
Master Test switches
may he positioned to TES?'
for troubleshooting. They
are not required to he in
TEST to meet Tech Specs.
Operating these switches
before operating the
bistable switches aids in
troiibleshootiy by
maintaining system
conditions the same as they
were when the trouble
occurred.
d
STANDARD
Obtains copy of OWP-
RP-1 and refers to
section for Channel I
TavdKI'
Reviews precaution
Reviews Initiating Cue
and notes that Control
Room has placed Rod
Bank Selector to MAN
ROD BANK SELECK
Reviews note and
Initiating Cue to
determine that Master
Test Switches are to be
placed in T E N for
troubleshooting
NOTES
-
Provide applicant
procedure after
demonstration of
abirity to obtain
Wit11 C0p.V Of
coot'.
R IS IN
Page 5 of 9
JPM COM-IE'(j)
HARRIS
JPM 1 PROC
ELEMENT
SI'ANDARD
I
NCYI'ES
SAT !
STEP \\
STEP
CXSXI'
i
i
VERIFIER AGREES
N'ITH ALL ACTIONS TAKEN.
I
I
I
I
SW1 (TSi412F) Master
and places SW1 in
MAINTAIN
Locates Card C1-861
CRITICAL TO
I Test
TEST position
CURRENT
C1-861 ! Switeh for TS/412D in
CONDITIONS FOR
I TEST
TROUBLESHOOT.
__
I
I CUE: S WI IS IN TEST P0SITZO.N
I
-1
I
I
I
CONDITIONS FOR
TROUBLESHOOT.
CONDITIONS FOR
Page 6 of 9
JPM COM-IP(j)
IlAKKIS
Card
I Tavgj in TEST
TEST position
TO MEET m a
CX-821 i
SPECS.
I
I
I
I
I
I
C13E: BS2 IS IN TEST POSITIOR!
I
I
TRZP BISTABLE
TO MEET TECH
TRIP BISTABLE
TO MEET TECH
TRIP BISTABLE
Page 7 of 9
JPM COM-IPG)
HARRIS
JPS4
STEP
- I6 -
I
UNSAI
PROC
ELEMEKT
STANDARD
1
NOTES
S?'EP
TRIP BISTABLE
TO MEET TECH
Page 8 of9
JPM COM-IPfi)
HARRIS
APPLICANT CUE SHEET
('IO BE KETIJRNED 'IO EXAMINER UPON COMPLETION OF TASK)
INITIAL C:ONDITICINS:
The plant was operating at 100% power whcn Loop 1 hot leg temperature input to
Tzvg and OTAT failed low.
INITIA?'INCr CUE(S):
Perfom the local actions per OWP-W-01 for troubleshooting and tripping bistables
for Loop I Tavg and Ori'AT to meet Technical Specifications. Infomi the Control
Ibom when all switches have been positioned to allow the Control Room to complete
the actions required in the Control Room.
The IJnit-SCO informs you that all Master Test Switches arc to placed in test fOF
troubleshooting. The Control Rooin has placed Rod Control in MANUM,.
Page 9 of 9
JIM COM-IP(k)
HARRIS
REGION I1
INITIAL LICENSE EXAMINATIQN
JPM GBM-IP(k)
APPLICANT :
EXAMINER:
Page 1 of 9
JPM COM-IP(k)
HARRIS
REC;ION I1
INITIAL IdGENSE EXAMINATION
JOB PERFOKMANGE MEASURE
TASK:
AI ,'ITRXA'Il< I'ATII:
None
Locally Operate a SC; POKV
FACIL.ITY JPM NIJMBER:
IP-02Y
KA:
000074EA1.04
IMPORTANCE:
4.1
3.9
KA STATEMENT:
Ability to operate and monitor the following as they apply to
Inadequate Core C.ooling: Turbine bypass or atmospheric
dunip valves, to obtain and maintain the desired pressure
"A" SG PORV has been manually opened and closed.
TASK STANDARD:
INPLANT
- /
SIMULATE
- /
-
-
PREFERRED EVhLIJA?'ION LOCATION:
SIMUIATOR -
-
PREFIRRED EVALUA'iION MTIIOD:
PEKIORM
IUTERENCES:
EOP-FPP-012, Loss of Emergency Coolant Recirculation
OF-136, Main Steam, E.xtraction Steam, and Stcani rlunip Systems
20
m w r m
TIME CRITICAL:
KO
-
VALIDATION TIME:
APP1,ICANI:
START TIME:
FINISH TIME:
PERFORMANCE RATING:
INSAT
COMMENIS:
EXAMINER:
Signature
Date
Page 2 of 9
JPM COM-IF@)
HARRlS
TOOLS / EQU1PME:hT / PROCEDURES NEEDED:
Performed in the plant
Pliers
Flashlight
- Plant communications equipment
- Keys to access toolbox
- OP-126, Main Steam, Extraction Steam. and Steam Dump Systems
READ TO OPERATOR
INS1RI;CIIONS TO APPLICANT:
If simulated, no actual plant controls or equipment arc to be operated during the
performance of this JPM. If performed on the simulator, then take d l actions as you
normally would in the Control Room. You shouid silence all annunciators and
determine ifthey are associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, hut not limited to, proper
communication, place-keeping, ALARA and use of personal protective equipment. All
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
You may use any normally available reference materials: however, immediate actions,
ijany, are to beperfornmedfrom memory. Describe the actions you are taking and the
indications you are looking at during the performance of the JPM; the evaluator will
then provide you c.ues desc.ribing the condition of the indication if not otherwise
available. Reputt comnpletkm uf the task as you wordd in theplant.
During the course of the walk-through examination, there may be some tasks you will
he asked to perform that may require you to implement an alternate method directed
by plant procedures in order to complete the assigned task. You are expected to m&e
decisions and take actions based on procedural guidance and the indications available.
Page 3 of 9
JPM COM-IP(k)
IIAKKlS
INIIIAL CONDITIONS:
Following a Keactor Trip and Safety Injection, a transition has been made to EOP-
IPP-012, Loss of Emergency Coolant Recirculation. The crew is attempting to
perform a cooldowi using the SG PORVs, but are unable to operate them from the
Main Control Room.
INITIATING CIE,(S):
You have been directed to perform local manual operation of SG A POKV per OP-
126, Main Steam, Extmtion Steam, and Steam Dump Systems, Section 82.
An Auxiliary Operator has reported that the freder breaker for SG POKV A Servo
Valve Solenoid has already been opened.
Page 4 of 9
JPM COM-IP(k)
HAUUIS
START TIME:
- DENOTES CRITICAL STEP
-
PROC
STEP
m_
N!A
8.2.1 . I .I
8.2.1 .I .2
__
CIJE: /
FLEMENT
Obtain copy of OP-12.6 and
keys to access toolbox
1,ocal POKV oueration has
been deemed necessary by
the IJnit SCO, or has been
directed by another
procedure.
An Auxiliary Clperator is
available to open breakers as
required by Step 8.2.1.2.2.
br OPERA TOR HAS BEEA
REQIXRED BREAKERS.
-~
Caution
before
8.2.1 2 . 1
8.2.1.2.1
C:AUTION: Adverse
conditions in the steam
tunnel may cause more rapid
operator fatigue and should
be evaluated for extended
operations
Obtain the follow-ing
equipment:
a. Pliers (to remove the
cover on the side of the
POKV)
b. Flashlight
c. High Noise Area Sound
d. Sound Powered Phone
Powered Phone Head Set
Extension Cord
a
STANDARD
_=
Obtains copy of OP-126,
Section 8.2 and keys to
access toolbox
Initial condition provide
infomation
Initiating Cue indicates
that A 0 has already
opened required breaker
>ISPATCHED TO
Reviews caution
Obtain equipment
Provide qpticant
with copy of
procedure ufter
demonstration of
ability to obtain
copy.
--
RATE ---t-
THE
toolhox are verijied
on weekly A 0
rounds. .WX
required to actually
obtuin tools us cover
for (iccess is esily
removed hy hand,
however evaluator
nzuy require
applicant to actdly
Page 5 of 9
JPM COM-IRk)
HARRIS
srw
~ 6
R
CUE: E
8.2.1.2.3
4 Cn3A
Caution
before
8.2.1.2.4
_- __
ELEMENT
3pen the Servo Valve
Solenoids feeder breaker(s)
?or the PORV(s) which will
,e operated, as listed below:
A S/G PORV ( 1 MS-58)
1
1
C SIG PORV (IMS-62)
PP-IA3 12-SA-3
PP-IR312-SB-3
IDP-IA-SIII-I 1
,1A312-SA, CIRCUlT3, I
zemove the cover from the
iide of the POR\\'(s) that is
are) to be operated, to
xrmit operator access to
he Solenoid Manual
3verrides.
~
)E COVER PLATE HAS.
CXIITION:
There is no local
instrumentation at the
POKVs to nionitor system
parameters. Therefore,
direct communications must
be maintained with the
Control Room during PORV
operation.
r
STAKDARD
Contach Control Room
to have poiver removed
from "A" S ~ C ~ f E S ~ A i ' i s
ALREADY PROVDED)
-_ Manual ~.
SDM Calculation (Modes 1 and 2)
1. Reactor Dower level.
75
%
2. Rod insertion limit for the above power level
14622
stepson bank
D
3. Burn up (POWERTRANMCR Status Board)
4. Present RCS Boron Concentration
355
300
ppm
. NOTE:
.~
Use absolute values of numbers obtained from curves.
5. Total worth of all control and shutdown banks, minus the worth of the most reactive rod
for Fuel Cvcle 1 2
.................
( a )
6. Cycle 12 Power defect for the power level recorded in Step 1.
(Refer to Curves C-X-1 to C-X-3).
Curve used
C-12-3
2250
50 pcm
( b )
NOTE: HFP curves are used for power levels of 10% or greater.
7. Inserted control rod worth at the rod insertion limit recorded in Step 2.
(Refer to Curves A-X-6 to A-X-4 1)
Curve used
A-12-1i
615225 pcm
( e )
8. Worth of any additional immovable or untrippable rods (for each stuck rod, use the most
reactive single rod worth (I524 pcrn) or obtain individual withdrawn rod worth from the
reactor engineer).
0
pcm
9. Determine the Total Shutdown Margin using the following formula:
3818 2 75 pcm
ADMIN COM-1A
HARRIS
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDIIIONS:
e
e
e
e
e
POWERI'KAX is NOT available.
The plant has been operating at 75%) power for 6 weeks.
<:ore bumup is 350 EFPD.
KCS boron concentration is 300 ppm.
NU rods are believed to be immovable / untrippable.
INITIATING CUE(S):
Complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual
SDM Calculation (Modes 1 and 2)" for current plant conditions.
Page X of 8
ADRIIN I'OM-IH
HARKIS
etemine Average
oron Concentration
APPLICANT:
EXAMINER:
Page I of8
Post Validation Revision
ADMlN C0b.l- I B
HARRIS
REGION II
INITIAL LICENSE EXAMINATION
JOB PERFORMANCE MEASIJW
TASK:
ALTEKNATE PATH:
None
Determine Average RCS Boron Concentration
FACILITY JPM NIJMUER:
CR-055
KA:
21.20
IMPORTANCE:
4.3
4.2
KA STATEMEXT:
TASK STANDARD:
Ability to perform procsdural steps.
Average RCS boron calculation detennined to be 9 5 1.7 t
0.5 ppm.
-
IN PI-ANT
-
PREFERRED EVALL!ATION ILKATICIN:
PREPERRIID EVAWAI'ION MKI'EIOD:
REFERENCES:
VALIDATION TIME:
15
MINUTES
TIME CRITICAL:
No
S IMU I ATOR
PERFORM
SIMULATE
EPP-002, Loss of All AC Power Recovery Without SI Required
Curve D-X-40, Pressurizer Volutne
-
-
-
APPI.ICANT:
START TIME:
FINISII TIME:
PERFORMANCE TIME:
MIKCTFS
PERFORMANCE RATING:
SA1
L:NS.AT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of 8
Post Validation Ilevision
TOOLS ; EQIJIPMEN'I' i PRO(IEL)I.JRES NEEDED:
e
e
e
Curve Book
JPhl can be performed in any location
IIPP-002, Loss ofAll tZC Power Recovery Without SI Required
NOTE: COMPLETED COPY OF WT'I'ACHMENT B INCLUDED AT
EYD OF JPM 'YO BE USED AS EXAMINER KEY.
READ 'IO CBPEKATOR
INSTRIJCTIONS KO APPLICANT:
Ifsirnulated. no actual plant controls or equipment are to be operated during the
perfornmance of this JPM. If perforttied on the simulator, then take all actions as you
nomially would in the C'ontrol Room. Yoit should silence all annunciators and
determine if they are associated with the task you are performing. KO further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, but not limited to. propcr
communication, place-keeping, ALARtt and use of persorial protec.tive equipment. AI1
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
You inay use any normally available reference materials; however, immrdinfe nctiorrs,
ifany, art' to heper$nwudfrom 888emor.v. Describc the actions you are taking arid the
indications you arc looking at during the perfonnance of the JPM; the evaluator will
then provide you cues describing the condition of the indication if not otherwise
awiiable. Report cornpietion qj'the task iwyon would h tfat'pht.
During the course ofthe walk-through examination. there may be some tasks you will
be asked to perforni that may require you to iiriplernent an alternate method directed
by plant procedures in older to complete the assigned task. You arc expected to make
decisions and take actions based on procedural guidance and the indications available.
Page 3 of8
Post Validation Revision
ADMlN COM-1D
HARRIS
iNiTIAL, C:ONDI'lIONS:
Following a loss of'ot'fsite power, recovery actions are being raken in accordance with
EOP-EPP-002, "Loss ofAL1 AC Power Iiecovery Without S I Required."
Plant conditions art' as fbllows:
e
PRZ pressure
2230 psig
e
Core Exit thennocouples
560 "F
m
PRZ Liquid space temperature
650 "F
m
PRZ Steam space temperature
650 "F
e
I'KZ level
35 ?%
e
e
liCS Hot Ixg temperatures
555 "1:
Charging and letdown are in senrice, with letdown flow at 45 gpm
Chemistry has just taken RCS boron samples and reports the following results:
e
Imop '3' Hot I.eg
930 ppni
e
Loop 'C' Hot Leg
940 ppm
m
PRZ Liquid Space
961 ppm
mrrItvrm(; CUE(S):
Calculate the average RCS boron concentration f i ~
these conditions per EOP-EPP-
002, Attachment I.
Page 4 ot 8
Post Validation Revision
ADMlN COWIIl
HARKIS
--
JIM
STEP
I
[mate FPP-002, Attachnren
I , arid Curve Book
~~
Record PW. level at the timi
Uetermine PWZ volume
dPRz)
based on PRZ Bevel
and curve D-X-40
,f -~
PW. sa*
.
~
~
~
~
~
~
~ ..
-~
~
~
~
~
~
~
~
~
~
Determine CVCS volume
- Vc.vrs) based on letdown
itatus:
t
8% letdown in service =
If letdown isolated = 0..
2136 gal + 2 = 1068 gal
1
- oncentration C>
qecord RCS loop C horon
- oncentration C3
iecord PRZ liquid space
x)t-oii concentration C,W
-
~~
~
~
~
~
~ ~.
~
~
-
-
~~~~~~~
STANDARD
-0cates EPP-002,
2ttachment I , and Curve
3ook
iecords PRZ level as
I 5 04
References curve
D-x-40
Determines
intersection of 653
F PRZ IJQUHH)
SPACE TEMP
LINK and 45% an
HNDHC:ATED
PRESSURIZER
LEVEL axis (S)
to correspond to
2900 f
BO0 galloes
on VBLI!ME
S
X
k
O
~
~
~
~
~
-~
~
~
%erIIliRC!S ktdo\\Vfl
,olume of 1068 gallons
Loe to letdown being in
ervice
_.
130 pp
lecords N S loop C
boron concentration as
1-10 ppni
lecortls IKZ liquid
pace boron
oricentration as 96 I
__
~~~
~
E-
9-
NOTES
Page 5 of 8
Post Validation Revision
Step 7
STOP 'IIME:
z__
SAT i
IJNSAI
Page h of8
Post Valid;iticm Kcvision
ADMIX COM-IB
HARRIS
1 .
2.
3 .
4 .
5 .
6 .
i .
A t t achment 1
Sheet 1 of 1
CA!.CUI.ATION
FOR AVERAGE RCS BORGN CCNCENTRATION
Record PRZ levo: a t the t3me of PRZ snm.pli*.
- 35
.-
x
Determine PH7. volume (Vpgzl bascd oc i'EZ
level and
cllrvc D-X 40
- -_
2900 2 EO0 GhL
Determine CVCS voluae ( V ~ v c s ) bssed on letdnwn Slatti:::
o
If lerdowm i n service
2116 GAL c 2
106R GAL
o
IT letdown ifiolnted
-
0 GAL
10%'! GAL
Rccord RCS l o o p R boron concentration C z :
930 PPH
Record RCS loop C boron concentration C 3 :
9414 - PPH
961
Rccord PR% l i q u i d s p c e baron concemrat?on CPRZ:
_.
Calculate n v e ~ a g e RCS boroli concentrRLion CC,,,)
unlng the following
fnrmula:
NOTE 1 :
NO'PE 2 :
NOTE 1:
XO'l'E 4 :
NOTE 5 :
RCS Volume ncL lncluding PRZ. llpper Head. Surge Line
(Value halved in cal.cuiat1on f a &ccou:it f o r
averaging t h e boron concentratian f o r Locpfi B and C - 31.218 CAI..)
RCS Volume. not lncluding PRZ or CVCS
~
6 6 . 1 3 5 GAL.
Combined Upper Head and Surge Line 'doliire - 2700 GAL.
(Uppec Heed Volume
CVCS Volume e 2136 GAL (Value halved in Step 3 to account. f o r
averaging t h e boron concentratioE f o r HCS l e a p E end C ~' 1068 GAL.)
~L'he boron concentration of the Llpper Head and Surge Line is assumed
t o be t h a t of t h e PRZ since thrsc vol.umes n l s o stagnate when RCPs Q
L
~
lost. CVCS boron concentration ic nsnuscd I o he thst of t h e RCS.
3365 GAL and Surge Lin@ Volume = 335 6AL.)
1':lge 7 of 8
Post Validation Revision
APPLICANT CUE SHEET
(TO F3k RET'IJRNFD '1'0 EXAMINER IJPON COMPLETION OF TASK)
INITIAL. CONDITIONS:
Following a loss of offkite power, recovery actions are being taken in accordance with
FOP-EPP-002, "Loss of All AC Power Recovery Without SI Required."
Plant conditions are as follows:
e
FRZ pressure
2230 psig
a
RCS Hot Leg temperatures
555 "F
e
Core Exit thernmcouples
560 O F
e
PRZ Liquid space temperature
650 "1:
e
PRZ Steanr space temperature
650 "1;
0
PKZlevel
45 %I
e
Charging and letdown are in =:Nice, with letdown flow at 45 gpm.
Chemistry has just taken KCS boron samples and reports the following results:
e
Loop 'R' IIot Leg
930 ppm
a
PRZ Liquid Spacc
961 pprn
a
Loop 'C' Hot Leg
940 ppm
INITIATING CCJE(S):
Calculate thc average RCS boron concentration for thcsc conditions per EOP-EPP-
002. Attachment I .
i
I'
L....; 1.
1.
2 .
3 .
14 .
5 .
6 .
7 .
httschment 1
Sheet I of 1
CAiCLILATlON FOR AVERAGE RC:;
BORON CONCEKTKATION
Record PRZ i e v e l at. t h e time of ?RZ sample:
Determine PRZ tvoluxe (VPgZ) 'based on PR7. !.eve1 ar.d
c u r v e D - X - 4 0
1)eterm:ine CVCS volume (VCcvCsi 'based on letdown s t a t u s :
o
If. letdown in s e r v i c e = 2136 GAi.
- 2 = 1068 GAL
o
If letdowri i s o l a t e d
=
0 GAL
Record RCS loop B boron c o n c e n t r a t i o n C 2 :
Record RCS l o o p C borcn concentrat.ion C 3 :
Record PR7. l.iqiiid space boron c o i ~ e n ~ r a t i o n
Cpilz:
C a l c u l a t e average RCS boron c o n c e n t r a t i o n (CavR)
u s i n g t h e
f o l i o w i n g fosnnila:
-
..
GtAL
NOTE 1: RCS Volume n o t i n c l u d i n g PRZ, Upper flead, Surge Line
(Value halved i n c a l c u l a t i o n t o account f o r
a v e r a g i n g t h e boron c o n c e n t r a t i o n f o r Loops E acd C = 31,218 GAL.)
NOTE 2: RCS Volume n o t i n c l u d i n g PRZ o r CVCS = 66,135 GkL
NOTE 3:
Combined Vpper Head and Surge Line Volune = 3700 GAL.
(Upper Head Volume = 3365 GAL and Surge Line Volume = 335 GAL.)
NOTE 4 :
iVal.ue halved i n S t e p 3 t o account f o r
a v e r a g i ~ n g t h e boron concentr1ation f o r RCS loop b and C = 1068 GAL.)
The boron c o n c e n t r a t i o n of t.he Upper Head and Surge LinP i s assumed
t o be t h a t of t h e PRZ s i n c e t h e s e volumes a l s o s t a a n a t e when RCPs are
l o s t .
CVCS boron coscentrati.on j.s assumed t o be tha.t of t h e R W .
NOTE 5 :
- ZDMIN CC)M-2
HARRIS
Determine Clearance Requirements fix a CSIP
APPLICANT:
EXAMINER:
Page I of 9
Post Vaiikition Revision
ADhZlN COM-2
HARRIS
TASK:
ALTERNATE PATH:
None
F,4ClLlTY JPV NUb1RE.R:
98NRC (h.2C)
KA:
2.2.13
IMPOKTANC'E:
SKO
3.8
3.6
KA STAI'EMENT:
TASK STANDARD:
Determine Clearance Kequirements for a CSIP
Knowledge of tagging and clearance procedures.
Provide complete elcctrical and mechanical isolation of CCSIP
I B-SB
PREFERRED EVAl.I.,'AI'ION LOCATION:
SIMULATOR
-
IN PI~,ANT
-
-
PERFORM
J
SIMULATE
-
PREFERRED EVALUATION METHOD:
OPS-NGGS- I30 I , Equipment CIcaranse
OP- 107, Chemical and Volume Control System
SFD 2165 S-1301 and S-1305
REFERENCES:
VALIDATION TIME:
10
MINC!TES
?'ME CRIITCAL:
No
-
APPI ICANT:
START TIME:
FIKISH TIME:
PERFORMANCE 'I'IME:
MIKLTES
PERFORMANCE RATING:
C"AT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of 9
Post Validation Revision
ADMIN COM-2
HARRIS
TOOLS 1 EQUIPbWNI / PRCXIEDURES NEEDED:
B
o
OPS-NGGC- 1301, Equipment Clearance
B
B
JPM can be perfonned in any location where the identified references are available
OP- 107, Chemical and Volume Control System
SED 2165 S-1304 and S-1305
RII.AD m OPEKATOR
IhSTRI.!CTIONS IC) APPK.I(:ANI:
If simulated, no actual plant controls or equipment are to be operated during the
pertonnat1c.e ofthis JPM. If performed on the simulator, then take all actions as you
nonnally would in the Control Room. You should silence all annunciators and
determine if they are associated with the task you are performing. No further action is
required h r annunciators unrelated to your task.
You are expected to adhere to all plant standards, includingl but not limited to, proper
communication, place-keeping, ALARA and use of personal protective equipment. All
actions taken by you should be clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification ifneeded.
You may use any nonnalIy available reference materials; however, iitimediaee baceiom,
(/any, are to beperformed,from memory. Describe the actions you are taking arid the
indications you are looking at during the perfi)nnance of the JPM; the evaluator will
then provide you sues describing the condition ofthe indication if not othenvisc
available. Repor: cornplction ojthe task nsyora W O K ~ I ~ P ~
theylrmt.
During the course of the walk-through examination, there may be some tasks you will
be asked to perfimn that may require you tu implement an alternate method directed
by plant procedures in C X ~ F to complete the assigned task. You are expected to nrakc
decisions and take actions based on procedural guidance and the indications available.
Page 3 of9
Post Validation Revision
ADhllN COM-2
IIARRLS
INITIAL. C.'ONDITIONS:
The plant is defueled. CSIP i R-SR is rctpired to be placed under a clearance for seal
replacement. Cooling water and lube oil systems are NOT required to be piac.ed under
clearance.
IiVlTlKI'lNCi CX JE(S):
You have been directed to determine the cietirance requirements for CSlP I R-SR
using the CWDs, SFl>s. and System Operating Procedures. as necessary. Provide
complete electrical and mechanical protection. Provide the necessary vent and drain
paths. 'The SSO has approved using single valve isolation.
NOTE: IT IS NOT INTENDED THAT YO8J AC:TUALI,Y G E N E W F E A
CLEAlUNCE. ONLY PROVIDE THE EVA1,ITATOM WITH A LISTING Ob'
'I"
RE,QB!HKED COMPONEXIS AND POSE'B'IONS.
Page 4 of9
Post Validation Revision
ADMIN C'OM-2
FIAKRIS
appropriate drawings
electrical requirements
and 2 I65 S- I304 and S-
I305 to determine
.
~~
mechanical re&ments
~
Refers to OP--107 (OK
m y other valid source)
and determines the
electrical supply
breaker for CSIP 1B-
SB to be 6.9 KV
Emergency Bus lB-TP5,
Cubicle 4
Also determines pump
has MCB switch and
iticlude?: ii CIT (in CSIP
'B' switch
(BRL%ZB<EW R4CKEIB
~-
OUT)
~-
Refers to S-1305 and
determines the suction
value for CSEP 1B-SB
to be IC'S-187,B) CSBP
f i ~ t i o n rsus vir
Page 5 o f 9
Posr Validation Rrvision
--
PRO(.'
STEP
VIA
~
V I A
~
Yl.4
--
~
~
_
_
Petermine the normal
niaaiflow isolation for CSHP
B-SB
~
_
_
_
K r n i i n e the alternate
niniflow isolation for CSIP
E-SE
STANDARL)
-.-
Refers to S-1305 and
determines the valve to
isolate CSHP 1B-SB
discharge is 1CS-197, E
CSIP Discharge Is01
VI\\,
[CXOSE)
,~
Refers to S-1305 and
OP-I04 and deterasaines
the valve to isolate
normal miniflow path
far <:SIP 15-S5 is ICS-
I96 SB,
CBBAKC"G/SI
PUMP
B-SB MINBB;LOW
HSOL, annd power
supply for valve is
1535-SB (Breaker 4b:)
Also detennines valve
has MCE3 switch and
includes a (?IT on 1 C X
196 switch
(VALVE TO BE
CB.OSi[sIP WBTH
POWER REMOVED -
LOCAL
ElANDWBBEEH, "3 BE?
determines the valve to
isolate asternate
miniflow path for CSlP
IB-SB is 1<'§-751, B
CSIP Alt Mini FBow
M a n 1501
I
-I
CRHTHCAH. TO
KSOLATE
DISCHARGE
FLOW $Am.
Page 6 of')
Post Validation Revision
ADMIN COM-2
HARRIS
ELEMENT -
Betermine the vent path
or CSHP IB-SB
)etermine the drain path
or CSHP 1B-SB
eternnines the valve to
unt CSHP 1B-SB is
c:s-m, B CSBP
urtion Px ISOS Vlv
efers to S-I305 and
ctermines the valves
I draiii CSBk %B-SB
iseharge piping Po be
3-189, B CSIP
asiwg Leak Off Drain
Bv, and BCS-190, B
SIP Casing Leak Off
rain Hsol Vlv
KYIH OFLNI
_e__l
CRITICAL TO
PROVKE VENT
PATH TO
DEPRESSURIZE
PIPING.
NOTE. NTHER
STEP 7 O R STEP 8
IS CRITICAL. ONE
03 THE OTHER
PERFORMED, BUT
w s r BE
BOTHARE
PERFORIMEB, THIS
IS ALSO
ACCEPTABLE
6RBBICAL TO
PROVIDE DRAIN
PATH TO
DEPRESSURIZE
PIPING.
NOTE EITHER
STEP 7 Ox STEP 8
IS CRITICAL ONE
THE OTHER
VUST BE
PERFORMED, BUT
NOT BOTH
HOWEVER IF
BOTH ARE
PERFORMED, THIS
IS ALSO
4CCEPTABLE __
~
Page 7 of)
Post Vaiidntion Revision
JPM ATTACHMENT
COMPONENT LISTING AND REQUIRED POSITIONS
COMPONENT
POSITION
CSlP 1B-SB P.S. - 6.9 KV Emergency Bus IB-SB, Cubicle 4.
IC§-187, B CSlP Suction Is01 Vlv.
1CS-197, B CSIP Discharge Is01 Vlv.
ICs-196 SB, CHARGING!SI PUMP B-SB MINIFLOW lSOb
ICs-196 SB P.S. - lB35-SB, Breaker4E
ICs-751, B CSIP Alt Mini Flow Man Isol.
EITHER OR BOTH OF THE FOLLOWING:
a) ICS-188, B CSIP Suction Px Is01 VIv
b) ICs-189, 3 CSlP Casing Leak Off Brain Vlv
IC§-190, B CSlP Casing Leak Off Brain lsol Vlv
- 0 R -
- AND -
CIT on ICs-I96 Switch
(NOTE 1)
CIT on CSlP 'B' Switch
(NOTE 1)
Racked Out
Shut
Shut
Closed
Off
Shut
UncappediOpen
Open
Open
Neutral after Closed
Neutral after StOD
(NOTE i) .- ClTs on MCB switches NOT required for satisfactory completion of JPM
Page x of9
Post Validation Revision
ADMlN (:OM-?
HARRIS
INI'I'IAL CONDITIONS:
The plant is defueled. CSIP IR-SB is required to he placed under a clearance for seal
replacement. Cooling water and lube oil systems are NOT required to be placed under
clearance.
INlTIATiNG CLJE(S):
You have been directed to determine the clearance requirements for CSIP IB-SI3
using the O s , SFDs, and System Operating Procedures, as necessary. Provide
complete eiectrical and mechanical protection. Provide the nec.essary vent and drain
paths. The SSO has approved using single \\ d v e isolation.
NOTE: IT IS NOT INTENDED THAT YOBJ ACTUALLY GENERATE A
CLJMWANCE. ONLY PROVIDE THE EVALUATOR \\VlTH A LISTING OF
THE REQUIRED COMPONENTS AND POSITIONS.
Page 9 of 9
Post Vnliddticn Revision
ADMIN COM-3
KARRiS
REGION TI
INITIAL LICENSE EXAMINATION
JOB PEWORMANCE MEASURE
ABMTN COM-3
Determine TEBE While Working in a High
Airborne Area
APPBJCAN'I':
EXAMINER:
Page I of 7
Post NKC Revision
ADMN COM-3
HARKIS
REGION II
INITIAL LICENSE EXAMINATION
JOB PERFXJFU'dANCE MEASURE
TASK:
AL'IFRNATE PATII:
None
FACILITY JPhl XlMREK:
New
Determine TEDE While Working in a IIigh Airborne Area
KA.
2.3.10
IMPORTANCL:
3.3
Kc)
2.9
Ability to perform procedures to reduce excessive levels of
radiation and guard against personnel exposure.
Determination made that wearing a respirator will result in a
higher I'EIIC.
TASK STANDARD:
-
IN PLANT
SIMIJLATE d
-
PREFIXRED EVALUA'I ION LOCATION:
SIMULATOR
PREFERRE11 EVA1,IJATION MET'WOI):
PiiWORM
lXFERENCES:
VALIIIATION 'I'I14E:
-
-
KGGM-PM-0002, Radiation Control and Protection Manud
io
M m u m
TIME CRITICAL:
No
-
START TIME:
FINISH TIME:
PEMOKMANCE mm:
MINIJTES
PERYORMAKCE RATIYG:
UNSAT
COMMENTS:
EXAMINER:
Signature
Date
Page 2 of 7
Post NRC Revision
ADMm COM-3
IIARRIS
TOOIS !
EQUIPMENT / PRQCEDIJRES NEEDED:
- JPM can be performed in any location
e NGGM-PM-0002. Radiation Control and Protection Manual
READ pro OPERATOR
INSTRlJCTIONS TO APPLICANT:
If simulated, nu actual plant controls or equipment are to be operated during the
performance of this JPM. If perfumed on the simulator, then take all actions as you
normally would in ~e Control Room. You should silence all annunciators and
determine if they are associated with the task yoti are performing. No further action is
required for annunciators unrelated to your task.
You arc expected to adhere to all plant standards. including. but not limited to, proper
communication, place-keeping, ALMA and use of personal protective equipment. All
actions takcn by you should be clearly demonstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification ifneedcd.
You may use m y normally available reference materials: however, iwitediufe actions,
$any, are do bepe~fornredfrorrn memory. Describe the actions you are taking and the
indications you are looking at during the performance of the IPM: the evaluator will
then provide you cues describing the condition of the indication if not otherwise
available. Report completion ofthe task as you would in tire plant.
During the course ofthe walk-through examination, there may be some tasks you will
bc asked to perform that may require you to implement an alternate method directed
b> p h t procedures in order to complete the assigned task. You are expected to make
decisions and take actions based on prucedurai guidance and the indications available.
Page 3 of4
Post NRC Revision
ADMIN COM-3
HAMCIS
INITIAL CONDITIONS:
The Control Room has directed you to enter an area to align several valves.
The estimated dose rate in the mea is 180 mReidhr. An airborne contamination
concern also exists.
It is estimated thdt it \\vi11 take you approximately 30 minutes to complete the
alignment if you wear a respirator. If you do NOT wear a respirator. the alignment
will take you only 20 minutes, but Radiation Protection projects that your internal
exposure will be 8 DAC-hrs.
INI'I'IATING CLJfqS):
Determine whether you should wear a respirator to minimire your total effective dose
equivalent.
Page 4 of 7
Post NRC Revision
ADMN COM-3
HARRIS
START TIME:
- DENOI'ES CRITICAL STEP
I'KOC
STEP
Tr==
m--
\\T!A
YIA
Y/A-
ELEMENT
-
Determines internal
exposure mhile wearing a
respirator
Determines external
exposure while wearing a
respirator
Determines TCJIAL
exposure while wearing a
respirator
Determines internal
exposure while NOT
wearing a respirator
Determines external
exposure while NOT
wearing a respirator
Determines internal
exposure to be ZERO
while wearing a
respirator
Deterniines external
exposure to be 90
mRem TEDE while
wearing a respirator
(1 80 mRem i hr x 30
min = 90 mRem)
Detennines total
exposure to be 90 mRem
while wearing a
respirator
(0 mRem internal f 90
mRem external = 90
mRem total)
Determines internal
exposure to be 20
mRem while not
wearing a respirator
(2.5 mRem / hr x 8
DAC-hr = 20 mRem)
Determines external
exposure to be 60
mRem TEDE while not
wearing a respirator
(180 mKem! hrx 20
ntin = 60 mRem)
NOTES
-
VOTE: Steps in
this JPiMiiiay he
yerformned in m y
wder.
CRITICAL TO
41,LOW
DETERMINING
rOTAL
EXPOSURE
WHILE
WEARING A
RESPIRATOR.
XITICAL TO
LLLOW
DETERMINING
I'OTAL
EXPOSURE
WHILE NOT
WEARING A
RESPIRATOR.
I'RITICAL TO
U,LOW
3ETERMiNING
I'OTAL
ZXPOSURE
WHILE NOT
WEARING A
IESPIRATOR.
4
Page 5 of 7
Post NRC Revision
i_=
STEP
6
__i
-
-_
- 7
wearing a respirator
exposure while NOT
wearing a respiratw
LOWER than while
wearing a respirator
I
TASK COMPLETE
..
I
STANDARD
while not wearing a
(20 ntRem internal t 60
mRem external 7 80
mhiem total)
Compares total
CRITICAL TO
exposures and
results in a lower total
I
Page 6 of 7
Post NRC Revision
AIIMIN COM-3
I U W S
APPLICANT CUE SHEET
(TO BE KETlJRNET) TO EXAMINER lJPON COMPLETION OF TASK)
INITIAL CONDI'I'IONS:
The Control Room has directed you to enter an area to align several valves.
The estimated dose rate in the area is 180 mRernhr. An airborne contamination
concern also exists.
It is estimated that it will take you approximately 30 minutes to complete the
alignment if you wear a respirator. If you do NOT wear a respirator. the alignment
will take you only 20 minutes, but Radiation Protection projects that your internal
exposure will be 8 DAC-hrs.
INITIATING CIJE(S):
Determine whether you should wear a respirator to minimize your total effective dose
equivalent.
Page 7 of 7
Post NKC Revision
AI)l\\llN SRO-4
IIARRIS
Determine Protective AcAion Recommendations
EXAMINER:
rage I of?
Post Validation Revision
TASK:
Determine Protective Action Recommendations
AI.TERNATE PATH:
None
FACILITY JPM NIJMBER:
CR-127 (MI
GI: 2.4.44
IMPORTANCE:
SKO
4.0
NA
KA STATEMENT:
TASK STANDARD:
2.4.44 - Knowledge of emergency plan protective action
recommendations
Detennines evacuation subzones to hc AIK,C,D,E,F,K,I.
Determines shelter subzones to be GIH.I,J,M,N
-
IN PLANT
-
PREFERIPED EVALUAI'IOIV 1,OC:ATION:
PREFERRED EVAL~JArION METHOD:
REP'ERENCES:
SIMLI L .ATOR
PERFORM
SIMI;I.ATE -
-
PEP- I 1 U, Emergency Classification and Protective Action
Recomniendations
VALDATION TIME:
MINUTES
'TIME CKITICAL:
No
~
START 'I IME:
FINISH TIME:
PERP'ORM.4NCE 'IIME:
V lNL7'l'E S
COMMENTS:
EXAMINER:
Signaturc
Date
Page 2 o l 7
f'ost Vnlidatim Revision
ADMIN SRO-4
MARKIS
TOOLS / EQUIPMI:.Y[ / PROCEDIJRES NEEDELI:
u
JPM can be perfonned in any location where the identified references are available
PEP- 1 IO, Emergency Classification and Protective Action RecommcntPations
u
READ TO OPERATOR
INS1KUC:TIONS TO APPIJCANT:
Ifsimulated, no actual plant controls or equipinent are to be operated during the
pertornlance ofthis JPM. If performed on the simulator. then take all actions as you
nonnally would in the Control Koorn. You should silence all annunciators and
determine if they arc associated with the task you are performing. No further action is
required for annunciators unrelated to your task.
You are expected to adhere to all plant standards, including, but not limited to, proper
communication, place-keeping. A I A R A and use of personal protective equipment. All
actions taken by you should be cIeariy tienionstrated and verbalized to the evaluator.
Before starting, initial conditions and initiating cues will be described and you may
ask for clarification if needed.
You may use any norniaily available reference materials; however, immediate actions,
ifany, arc bo 6eper4;7rmed,fiorn memory. Describe the actions you are taking and the
indications you are Looking at during the perforniance ofthe JPM; the evaluator will
then provide you cues describing the condition of the indication if not otherwise
available. Report compPpketion of the task asynsc would in t h e ] h n t
During the course ofthc walk-through examination, there may be some tasks you will
he asked to perform that may require you to implement an alternate method directed
by plant procedures in order to c.oniplete the assigncd task. You are expected to make
decisions and take action:: based on procLdural guidance and the indications available.
Page 3 of7
Post Validation Revision
ADMlN SRO-4
HARRIS
INITIAL ('ONDII'IONS:
A GENERAL EMLRGENCY has Ixxn declared fhllowing a large break loss ot
coolant accident.
The following conditions arc noted:
5
5
Core Exit 'rhcnnocoupie temperatures are all between 1900°F and 2000"l~.
Radiochemistry analysis indicates that approximately 2.6% of the fuel volurne has
melted.
5
KHR is injecting through the RCS cold Legs.
5
C'ontainment Spray is operating with Containment Pressure at 18 psig.
5
Containment hydrogen concentration is 5.504.
5
Wind Direction is 220".
5
Wind Speed is 18 mph.
INI'IIATING C1!8(S):
Lktennine the Protective Action Keconiinendations for these conditions.
I'sge 4 of 4
Post \\Jalid;ition Revision
ADMIN SRO-4
HARRIS
START TIME:
- DENOTES CRITICAL STEP
- TEP
I
%_
- 6 - I -
-
-
ELEMENT
STANDARD
i
1 !
--
Obtain PEP-1 10 and
determining PAR
General Emergency
Declared?
i Obtains PEP-I IO,
reqiiired information for
Attachment 3, Protective
.4ction Recommendation
Process
<YEW Determines a
General Emergency
lnas occurred based on
-~
~
~
~
~
~
~
~
~~
imminent or has occurred
substantial sore
damage is immineut or
lnas oceurred due to
core damaee havine
coolant is imminent or has I significant LOSS of
occurred
imminent or has
ocenrred due to
Containnnient
Hydrogen exceeding
or 3 1,OCA
~-
.~
- .
containment failure
has occurred due to
i Containment
j Hydrogen exseeding
I 4 %
i Determines wind
i direction from 220"
innnmiuent or has occurred
Containment failnire
(Primary or s i c ) is
~.
-
Determine wind direction
NOTES
6'MHTHC.-r& 'KO
BPETERMINH;
PROPER PAR.
CRB"H('AH, TO
DETERMINE
PROPER PAR.
~
.-
CIRR'HCAL TO
DETERMlNE
PROPER PAR.
['age 5 o f 4
Post Validation Revision
ADMIX SRO-4
FIARRIS
-
STEP
"7
m======
-
- 8
Determine evacuation
areas
- -
_ _ -
Determine sheUPer areas
QIP 5 mile radius and
EVACUATION
miles radius 110 mile
!
downwind table
Determines shelter
i CRITICAH, TO
G,H,I,J,M,N based on
5 mile radius nmd wind
direction using 5 miles
subzones to be
radius /BO mile
downwind talase
i
DETERMINE
.~
~
~
~
~
~
~
~
~
.~
~~~~~~
STOP TIME.:
Page 6 of 7
Post Validation Revision
ADMIN SRO-4
H4RRIS
APPLICANT CUE SHEET
(TO BE RETURNED TO EXAMINER UPOK COMPI,ETION OF TASK)
INITIAL CONDITIONS:
A GENERAL. EMERGENCY has been dwlaral tlrlltrwing a large break loss of
coolant accident.
The foliowing conditions are noted:
Core Exit Thennocouple temperatures are all between L 900°F and 2000°F.
Radiochemistry analysis indicates that approximately 2.606 of the fuel \\~lunre has
melted.
RKK is injccting through the RCS cold legs.
C'ontainrnent Spray is operating with Containment Pressure at I 8 psig.
Containment hydrogen concentration is 5.5%.
\\A.'ind Direction is 220".
Wind Speed is I8 mph.
INI'IIATING CUE(S):
Determine the Protective Action Recommendations fix these conditions.
Page 7 o f 7
Post Validntiori I<evision