April 16, 2004 Mr. William OConnor, Jr.

Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

SUMMARY

OF THE FERMI POWER PLANT PERFORMANCE ASSESSMENT MEETING ON APRIL 1, 2004

Dear Mr. OConnor:

On April 1, 2004, a public meeting was held at the Monroe City Council Chambers in Monroe City Hall, between the Nuclear Regulatory Commission (NRC) and Detroit Edison Company staff. The purpose of the meeting was to discuss NRCs assessment of Fermis performance for the period of January 1, 2003, through December 31, 2003.

Overall, as discussed in the Fermi Annual Assessment letter dated March 4, 2004 (ADAMS accession number ML040441203), Fermi 2 operated in a manner that preserved public health and safety. Plant performance for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix, based on one White performance indicator (Emergency AC Power System Unavailability) in the mitigating systems cornerstone. The White performance indicator was discovered in the fourth quarter 2003; however, it went White in the third quarter 2003. This was due to fault exposure hours incurred due to a partially connected lube oil system pressure switch fitting on Emergency Diesel Generator 12 which impacted seismic qualification.

The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041060206). Please contact me if there are any questions you have about this meeting at (630) 829-9703.

W. OConnor In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As stated cc w/encl:

N. Peterson, Manager, Nuclear Licensing D. Pettinari, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police

W. OConnor In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As stated cc w/encl:

N. Peterson, Manager, Nuclear Licensing D. Pettinari, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\Mtg Notices 2004\\ML041100566.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME PPelke/co MRing DATE 04/16/04 04/16/04 OFFICIAL RECORD COPY

W. OConnor ADAMS Distribution:

LXR1 DFT DPB RidsNrrDipmIipb GEG HBC SJC4 C. Ariano (hard copy)

C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1

Attendance List Fermi Plant Performance Assessment Meeting April 1, 2004 Name Organization William OConnor, Jr.

Vice President, Nuclear Generation, Detroit Edison Don Cobb Director, Nuclear Production, Detroit Edison Rick Libra Director, Nuclear Engineering, Detroit Edison Peter Smith Director, Nuclear Assessment, Detroit Edison Scott Reeder Washington Group Rod Johnson Detroit Edison Marti Hulslander Detroit Edison Sam Hasseun Detroit Edison Kevin Morris Detroit Edison Allen Anderson Washington Group Stan Stasek Detroit Edison John Austerberry DTE Energy Charles Slat Monroe News Barbara McCallahan for U.S. Senator Debbie Stabenow Lou Brandon Michigan Department of Environmental Quality Norm Peterson Nuclear Licensing Manager, Detroit Edison M. Philippon DTE Energy Paul M. Ganz DTE Regional Relations Pat Hiland Acting Deputy Director, Division of Reactor Projects, NRC Mark Ring Chief, Projects Branch 1, NRC Steve Campbell Fermi Senior Resident Inspector, NRC Tim Steadham Fermi Resident Inspector, NRC